Battle: Dar es Salaam vs Nairobi

Battle: Dar es Salaam vs Nairobi

Huku kwingine baada ya pavements mbonA wameacha michanga kibao, si wangeweka hata lami nyeusi tu?? hata hizi pavements zitajaa michanga zote. Hizi boda boda zingepigwa stop kwa kweli!
Nadhani pembeni wanajenga frontage roads each side. Kama hii walivyojenga phase Two👇🏾
IMG_8074.jpeg
 
Hizi hapa malls tano mpyaa mjini.
1. Morocco square mall (opened)
IMG_8724.jpeg
2. EACLC to be opened soon
IMG_8305.jpeg
IMG_8298.jpeg
IMG_8302.jpeg

3. Ocean view mall masaki U/C
IMG_8448.jpeg
IMG_8757.jpeg
4. Dar village mall mikocheni
IMG_8760.jpeg
IMG_8593.jpeg
IMG_8742.jpeg
5. Kunduchi shoping mall
IMG_8726.jpeg
IMG_8759.jpeg
.. hiki ndio kilikua kichaka chao. Sahii tumekifyekelea mbali. 🤣🤣🤣
 
Mji umeshaenda mpaka Vikindu.
Routes za BRT zote kwenda Main 6 roads zonahitaji Light rail system au metro

1. LRT kwenda kibaha
2. LRT kwenda Pugu
3.LRT kwenda Bnuju
4. Kwenda Vikindu
5. Inayocross Kawe, Mikocheni kupitia Mwenge kwenda Ubungo ku cross Tazara to Port
6. city centre ring system inayozunguka Mjini Kkoo, posta , Sinza , Temeke etc

sitashangaa kama itacost more than 5bil usd kwa phase zote

This should be plan for next 10 years kupunguza Msongamano Dar

Pia Dar inahitaji new and better sewage system upgrade this is much needed

Hizo ndo big problems kwa Dar

Low cost housing should also be considered in non planned areas
 
Hizi hapa malls tano mpyaa mjini.
1. Morocco square mall (opened)View attachment 33627112. EACLC to be opened soonView attachment 3362718View attachment 3362720View attachment 3362721
3. Ocean view mall masaki U/CView attachment 3362704View attachment 33627054. Dar village mall mikocheniView attachment 3362723View attachment 3362706View attachment 33627075. Kunduchi shoping mallView attachment 3362708View attachment 3362709.. hiki ndio kilikua kichaka chao. Sahii tumekifyekelea mbali. 🤣🤣🤣
Dar village imeshaanza kazi this year
 
Routes za BRT zote kwenda Main 6 roads zonahitaji Light rail system au metro

1. LRT kwenda kibaha
2. LRT kwenda Pugu
3.LRT kwenda Bnuju
4. Kwenda Vikindu
5. Inayocross Kawe, Mikocheni kupitia Mwenge kwenda Ubungo ku cross Tazara to Port
6. city centre ring system inayozunguka Mjini Kkoo, posta , Sinza , Temeke etc

sitashangaa kama itacost more than 5bil usd kwa phase zote

This should be plan for next 10 years kupunguza Msongamano Dar

Pia Dar inahitaji new and better sewage system upgrade this is much needed

Hizo ndo big problems kwa Dar

Low cost housing should also be considered in non planned areas
LRT Kutoka PUGU kuja MAGUFULI BUS stand kuja TEGETA/BUNJU!
 
instanbul is there a place in Kariakoo with this number of hessian nets in such a small area?

fb_img_1705426480095-jpg.3362392

Kaka Kkoo ni hatari najua uko karibu na east leigh so lazima uvutie kwako

But kuna more than 30 towers above 10flrs

Niko Dar kwa kuda so nimepita juzi usiku

Some of 4 projects nyingine ni 15flr towers btw

Msimbazi street pekee ina kama 10projects
 

Attachments

  • IMG_1301.jpeg
    IMG_1301.jpeg
    533.7 KB · Views: 20
  • IMG_1300.jpeg
    IMG_1300.jpeg
    510.7 KB · Views: 18
  • IMG_1296.jpeg
    IMG_1296.jpeg
    641.3 KB · Views: 21
  • IMG_1297.jpeg
    IMG_1297.jpeg
    563 KB · Views: 24
Kaka Kkoo ni hatari najua uko karibu na east leigh so lazima uvutie kwako

But kuna more than 30 towers above 10flrs

Niko Dar kwa kuda so nimepita juzi usiku

Some of 4 projects nyingine ni 15flr towers btw

Msimbazi street pekee ina kama 10projects
10 floor towers ndio mnaongelea?😂😂
Kwa hiyo picha ya Eastleigh pekee I counted about 15 towers na zote ni over 10 floors. It seems you guys keep yapping about Kariakoo because you haven't seen construction yet.
 
10 floor towers ndio mnaongelea?😂😂
Kwa hiyo picha ya Eastleigh pekee I counted about 15 towers na zote ni over 10 floors. It seems you guys keep yapping about Kariakoo because you haven't seen construction yet.
Damn you really dont know Kariakoo . Anyways sijawai kufika Eastleigh lakini mzee Kariakoo its something else ,Wakenya , Waganda wa Kongo wanatoka all over kuja ku shop kkoo i dont think wa congo wanakuja east leigh , so Kkoo ina majengo mengi sana hizo 10flr nimetaja tu but 15flrs ndo most of u/c projects
 
Kariakoo is huge my fool brother huezi ipima kwa idadi ya net, haka ka eastleigh ni kaeneo kadunchu ndio mana unaeza ona idadi ya nets zote zilizopo. Kwasasa tunavyozungumza kuna 44 buildings of over 15 floors under construction in Kk. 👇🏾 hadi hizi ni zile za PPP tu. Achana na zile project za watu binafsi. 👇🏾 NHC unveils Sh607 billion plan to change urban landscape. The plan is to build 80 bulidings. 👇🏾80 projects submitted for joint ventures with NHC.
this gives better statistics
 
Back
Top Bottom