Battle: Dar es Salaam vs Nairobi

Battle: Dar es Salaam vs Nairobi

Hii umejitia kidole😂😂😂😂😂Hivi Ndio mlivyomaskini nyie mbwa? Watu wanapanda na mikate ya bofulo 😂😂
Lazima wawe na njaa maana wanakaa masaa 6 sisi tunakaa masaa mawili matatu tumefika safari.
Hivyo hatuhitaji vyakula vizito ni asusa asusa za kulichekecha tumbo kidogo basi.
 
Waiyaki Way

1702658274647.jpg
 
Mnasumbuka na mpumbavu Teargas
Ukifukuza kichaa utaanza kuonekana na wewe kichaa 7 days mnaongelea issue hiyo hiyo tu.

How can you compare Fossil Train with Electric?

This is stupidity. Ego inawaua wakenya.

But hii battle ime expose vitu vingi vya hovyo kenya 😀 😀 😀
 
Hii hapa simple analysis

Tanzania’s electric SGR can handle a higher axle load (35 tons) compared to Kundustan’s diesel SGR (25 tons). This means that Tanzania’s SGR can carry heavier freight loads, making it more suitable for bulk and heavy goods transport.

Kundustan’s SGR uses diesel engines, while Tanzania’s SGR uses electric engines. Electric trains are generally more environmentally friendly and have lower operational costs in the long run.

The electric SGR in Tanzania has a lower carbon footprint compared to the diesel-powered SGR in Kundustan.

The higher axle load of Tanzania’s SGR means it can be more efficient in terms of the amount of goods transported per trip, potentially reducing the number of trips needed for the same volume of cargo.
 
In Kenya Two to three SGR trains can operate at the same time ( offloading and onloading) in the same station(Nairobi and Momba) without any inconvinience because the stations are designed to accomodate that. In Tanzania a train has to wait for another train to load passengers ndio hile ingine yenye inataka kushukisha ishukishe😂😂.

Nairobi.
View attachment 3053026
View attachment 3053027
View attachment 3053029
View attachment 3053059

Mombasa
View attachment 3053034
View attachment 3053035
Nikiangalia hii station yenu ya Nairobi huwa nacheka sn, yani mtu anakaa juu akitaka ku board anashuka chini 🤣🤣🤣🤣🤣🤣🤣🤣
 
In Kenya Two to three SGR trains can operate at the same time ( offloading and onloading) in the same station(Nairobi and Momba) without any inconvinience because the stations are designed to accomodate that. In Tanzania a train has to wait for another train to load passengers ndio hile ingine yenye inataka kushukisha ishukishe😂😂.

Nairobi.
View attachment 3053026
View attachment 3053027
View attachment 3053029
View attachment 3053059

Mombasa
View attachment 3053034
View attachment 3053035
Wakuu oneni bichwa la ng'ombe hapo juu 🤣 🤣 🤣 🤣 🤣 🤣 🤣
Screenshot_20240727-092845~2.png
 
Back
Top Bottom