Battle: Dar es Salaam vs Nairobi

Battle: Dar es Salaam vs Nairobi

Kericho
images (53).jpeg
images (52).jpeg

Eldoret
images (56).jpeg
images (58).jpeg
ES_pq1_XgAE-c1Q.jpeg
images (57).jpeg
 
Wacha ujinga. Eti miradi yetu yote haifiki 2115 MW? Kwani umevuta bangi? Hivi wewe hujui kwamba Kenya inagenerate 2,800 MW?
I meant all ur geothermal energy is less than half of 2115 MW from JNHPP !

ENERGY SECTOR OVERVIEW

Kenya has one of the most developed power sectors in sub-Saharan Africa, having opened its market to Independent Power Producers (IPPs) in the mid-1990s. Kenya benefits from factors including: an active private sector; Kenya Power’s long track record as a creditworthy off-taker; and abundant renewable energy resources, especially geothermal, wind and solar. Limited and aging transmission and distribution infrastructure, financing, opaque procurement processes, right of way disputes, and other challenges affect sector growth. Power Africa activities in Kenya are guided by a cooperation framework. The current Power Africa-Government of Kenya Cooperation Framework was signed in June 2018, to cover the 2018-2023 implementation period.

GENERATION CAPACITY

  • Installed Capacity: 2,351 MW
    • Hydroelectric: 36%
    • Thermal: 33%
    • Geothermal: 29%
    • Other Renewables: 2%
  • Reached Financial Close: 617 MW
  • Power Africa 2030 Pipeline: 3,234 MW
CONNECTIONS

  • Current Access Rate: 64.5%
  • Households without Power: 3.5 million
    • Target: Universal Access by 2022
  • Power Africa New Grid Connections: 3,240
  • Power Africa New Off-Grid Connections: 3,069,080
Power Africa in Kenya | Power Africa | U.S. Agency for International Development
 
View attachment 1579954
Hiyo freeway ni ya kiwango cha chini (ina design flaw), mfano angalia kwenye ku merge/exit hapo, ni pafupi sana. Fikiria magari matano ya exit kwa pamoja, si yataleta foleni au hata ajali? Au hii ndiyo sababu Nairobi kuna foleni sana?
that's what you might think until you actually experience it. all the time I've used the highway and drove on the highway, there's never been a time I've had a problem except maybe when you're in too far to exit,but that is only when you're not keen to use the exit lane earlier and it only happens when you are new on the route.
 
that's what you might think until you actually experience it. all the time I've used the highway and drove on the highway, there's never been a time I've had a problem except maybe when you're in too far to exit,but that is only when you're not keen to use the exit lane earlier and it only happens when you are new on the route.
What is the speed limit? 'Cause that would rule out our argument.
 
Ujinga ya Uhuru! Instead of strengthen the existing institutions like Police air force to even offer comercial services, he is transfering the duties to KDF a soon to be a costly shortcut! At end of the day KDF who r damn corrupt n can't be questioned by the Parliament (a security matter) will be overwhelmed! And believe me u will have double the incidences of choppers/aircraft crashing in a year!

BTW At least mimi natafuta habari na siongei vitu vya kifalamanga kama wewe as I am not guided by emotions but facts always!

Wewe unahara tu ujinga wowote nikikuuliza why is JNHPP a white elephants while unit cost of electricity will be below $11 cents? and over 3 transmission grids r already built to connect the site!? What will be ur defence?
Mimi siongei kuhusu transmission lines. Transmission lines ni rahisi kujenga. Mimi naongea kuhusu mradi wenyewe. Huo mradi wa Nyerere hydro itachukua miaka kumi kukamilika, that is, kwa bahati nzuri ikiwa haitakufa kifo cha mende.
Hata ikikamilika itagenerate 2,000 MW na total power generation itakuwa 3,500 MW. Huu mradi ni white elephant kwa sababu demand ya umeme TZ ni 1,500 MW sasa hivi na miaka miwili zijazo itakuwa pengine 1,700 MW. Sasa mradi huu utakapozinduliwa miaka miwili zijazo, TZ itakuwa inagenerate 3,500 MW ilhali nyie mtakuwa mnatumia 1,700 pekee na kupoteza 1,800 MW. Hio ni kutupa pesa. Nchi yenu haina viwanda vya kutosha ili kujustify kujenga hydropower kubwa hivyo. Mtavuja pesa sana. 80% ya hio power haitatumika.
 
Back
Top Bottom