Just stupid. Design plans must be approved before construction breaks ground. Any deviation from the original approved plans by the local authority could result in the whole building being condemned for demolition. Addition midway i have witnessed is possible through bribery but though it could result in disastrous outcomes like seen in collapsed buildings. Mtu hajengi tu kimandazi mandazi, a lot of planning of the end product happens before you see those those excavators. But i don't expect bongolala to get this because atachukua rusty sheets and bricks and begin building "dream house" in the next available space without any plans or approval.muoneni huyu 🤣🤣
kwan hawawezi kuongeza floors nyingine zaid ya ambazo zipo kweny michoro au designing??
kumbuka jengo lolote linalojengwa huwa kuna extra carrying capacity yake ambayo unaweza kuitumia kuongeza hata floors au kitu chochote kizito kwa juu
uache ujuaji, ni heri kukaa kimya sometimes
Just even try to add a single floor in Nairobi, when the inspection is being done especially to get the occupancy permit utalilia choo, you'll probably have to part with millions as bribes or they'll condemn it for demolition.You are just exposing your stupidity, if any floors are to be added, they will do so bearing the same floor to ceiling length of the other storeys. Remember that before they add those floors they will have to inform relevant gorvernment agency. So the added meters will be indicated kabla waanze kuongeza hizo floors zingine.
Hapo umeacha new bagamoyo roadKatika miradi ambayo itabadili sura ya Dar ni huu na new salenda bridge + modernizatiom of coco beach. Achilia mbali Ubungo fly over, kibaha highway, New upcountry Bus terminal, Mbagala BRT, SGR inavyo katiza town ikizama kwenye station ya kwenye movie na upgrading ya Ali Hassan Mwinyi road. Hii yote itakua inaisha kuanzia 2021-2024. Kipindi hiki hamna majengo mapya marefu yanayo jengwa Dar ila yajayo ni matamu, huko Dom ndiyo hatari tupu.
7000 vehicle a month,nairobi 600 kms sq!?!..hahaaaa haaaa us your brain before vomiting your garbages
Expected to be with??..by 2030...but for expections everything is possible,even flying, but 7000 vehicles a month!!!the vehicles would be everywhere of the tiny nairobiNairobi to have 1.35 million vehicles in 2030
The number of vehicles in Nairobi alone is likely to be more than 1.35 million in 2030, going by the current rate of registrationwww.sde.co.ke
Perhaps today you didn't take Albinos soup,so you are able to comprehend what's sensible.This is the first time you have said something sensible.
I like your sense of humor.Perhaps today you didn't take Albinos soup,so you are able to comprehend what's sensible.
I remember there's a time GTC construction was halted for close to two weeks for something close to that though I didn't get the whole storyJust even try to add a single floor in Nairobi, when the inspection is being done especially to get the occupancy permit utalilia choo, you'll probably have to part with millions as bribes or they'll condemn it for demolition.
Jiji la kisasa linafaa kuendana na skyline ya maana la sivyo itakuwa underdogKatika miradi ambayo itabadili sura ya Dar ni huu na new salenda bridge + modernizatiom of coco beach. Achilia mbali Ubungo fly over, kibaha highway, New upcountry Bus terminal, Mbagala BRT, SGR inavyo katiza town ikizama kwenye station ya kwenye movie na upgrading ya Ali Hassan Mwinyi road. Hii yote itakua inaisha kuanzia 2021-2024. Kipindi hiki hamna majengo mapya marefu yanayo jengwa Dar ila yajayo ni matamu, huko Dom ndiyo hatari tupu.
hatari mambo moto mkuuBRT phase 2
20.3km
U/C
Mbagala to Posta
And JKT to Magomeni
Work inafanyika ..we paint no pink shitView attachment 1206330View attachment 1206331
Badala ya kujenga interchange unazungumzia flyover,na huko upcountry towns kama Mbeya wajenge nini? Dar should have world class interchange hamuoni Nairobi? Poor youHapo umeacha new bagamoyo road
Phase 3na 4 BRT amabzo world bank washa aproove loan
Nategemea kuona flyovers mwenge na morroco soon
ivi hawakutoa video inayoonyesha jinsi brt awamu ya sasa jinsi itakavyokuwaBRT phase 2
20.3km
U/C
Mbagala to Posta
And JKT to Magomeni
Work inafanyika ..we paint no pink shitView attachment 1206330View attachment 1206331
haujielewi hata ukisemacho haukijui...Badala ya kujenga interchange unazungumzia flyover,na huko upcountry towns kama Mbeya wajenge nini? Dar should have world class interchange hamuoni Nairobi? Poor you
Na your dad kama unabisha onyesha new tall building being U/CIliondolewa na nani ww kilaza?[emoji23] [emoji23] [emoji23]
The kinda old school that's always super cool.They are so old skul
Ipoivi hawakutoa video inayoonyesha jinsi brt awamu ya sasa jinsi itakavyokuwa