Sasa tulia nikufundishe kama umeshindwa.
I told in 2025 Tanzania going to be a supper power of East Africa
Will have 5500+MW it will take 10 yrs for Kenya to reach that
Anza kusoma sasa:- Apart from Nyerere Hydro Power
The government has also set aside Sh40 billion for the Kinyerezi 1 Power Plan Expansion Project which will produce 185MW, and Sh6.27 billion for the Ruhudji Hydroelectric Power Station for 358MW hydroelectric power station.
Over Sh5.25 billion for 222MW Rumakali Hydroelectric Power Station, Sh500 million for the 321 MW Kikonge hydropower project, and Sh15.52 billion for the Malagarasi hydropower project for 44.8MW hydropower plant.
For the 87.8MW Kakoko project, the government has set aside Sh39.15 billion, and Sh27.63 billion for the solar power project in Shinyanga.
The government has also set aside Sh345 billion for the significant 150MW Mawe project and Sh6.5 billion to continue maintaining the Hale hydropower plant.
Kinyerezi 1 - 185MW
Ruhudji - 358MW
Rumakali - 222MW
Kikongwe - 321MW
Kokoko - 87MW
Shinyanga - 150MW
Mawe - 150MW
TOTAL = 1,473
Add Julius Nyerere Hydro Power which is 2,215
3,688MW Total
Current Production is 1,890
GRAND Total = 5,578MW