Nimeisoma kaka ripoti hiyo. Hakika Kenya ipo na hali mbaya sana. Maelezo machache toka kwenye ripoti.
Dar es Salaam Port
Tanzania’s primary hub has registered a substantial turnaround in efficiency. Vessel turnaround times have dramatically fallen to 3 - 6 days, a massive reduction from historical windows where ships frequently waited between 10 and 30 days. By aggressively tackling "waiting time at anchor" (the time a vessel idles at sea before a berth opens up), Dar es Salaam has mitigated supply chain friction.
Mombasa Port
Kenya's main hub has encountered persistent structural headwinds that have penalized its global standing. The report highlights a decline in its CPPI metrics driven by a sharp reduction in berth utilization efficiency. Vessels at Mombasa routinely spend excessive time waiting outside the port boundaries before they can dock and offload.