Battle: Dar es Salaam vs Nairobi

Battle: Dar es Salaam vs Nairobi

Upanga tour
95142b8874e0843c0a5cd8ef79166df3.jpg
aibu ya mwaka...mahali kama hapo hakuna lami
 
Wasubiri mpka baada ya miaka minne waje waongee na mwanaume Dar.

NUMBER OF ABOVE 30 FLOOR BUILDINGS IN THE CITIES OF DAR ES SALAAM AND NAIROBI

DAR ES SALAAM NAIROBI
1. MILENIUM TOWER 30 BRITAM TOWER 30
2. PPF HQ 35 PRISM 34
3. MZIZIMA COM 34 UAP 33
4. PSPF 1 35 AVIC 1 43 U/C (May be after 3 years)
5. PSPF 2 35 AVIC 2 35 U/C (May be after 3 years)
6.MZIZIMA RES 33 MONTAV 1 40 (Site Clearance) (May be after 4 years)
7. MNF 1 MONTAV 2 30 (Site Clearance) (May be after 4 years)
8.MNF 2 30 PINNACLE 2 40 (Uchimbaji mafuta)(May be after 5 years)
9.TPA TOWER 40 PINNACLE 1 70 (Uchimbaji mafuta)(May be after 5 years)
10.RITA TOWER 30 .............TIMES TOWER ? 28F OR 38 ? .....................

From the list above i think you have the answer, Who have the right to brag as being ahead.
AVIC TOWERS wont take 3 years give 2 years at most because now it is at 16 th floor and they just started this year. Pinnacle give it 3 years. Construction has already started give it 2020
Lets add the list again
Cytonn Towers Tower 1 35flr, Tower 2 35 flrs, Tower 3 35flr
Avic Tower 3 28flr
CBK Pension Tower 27 flr
88 Nairobi Tower 44flr
 
Tanzania Infrastructure, power, and communications, Information about Infrastructure, power, and communications in Tanzania


Tanzania - Infrastructure, power, and communications
According to the U.S. State Department,
infrastructure in Tanzania is extremely poor. In terms of the road network, for instance, only 3,704 kilometers (2,296 miles) of a total of 88,200 kilometers (54,684 miles) of highway is paved. Paved highways link Dar es Salaam to Tunduru, Dodoma, Tanga, and Arusha. The remaining 84,496 kilometers (52,388 miles) of highway is un-paved, making it extremely difficult to reach certain areas from Dar es Salaam, such as Lindi and Mtwara, during the rainy season. At the same time, many rural roads are virtually impassable, as seasonal washouts are commonplace. Although the road network has suffered as a result of many years of government debt-related negligence, funds allocated for road maintenance and rehabilitation have increased in the past 10 years.
 
Tanzania Infrastructure, power, and communications, Information about Infrastructure, power, and communications in Tanzania


Tanzania - Infrastructure, power, and communications
According to the U.S. State Department,
infrastructure in Tanzania is extremely poor. In terms of the road network, for instance, only 3,704 kilometers (2,296 miles) of a total of 88,200 kilometers (54,684 miles) of highway is paved. Paved highways link Dar es Salaam to Tunduru, Dodoma, Tanga, and Arusha. The remaining 84,496 kilometers (52,388 miles) of highway is un-paved, making it extremely difficult to reach certain areas from Dar es Salaam, such as Lindi and Mtwara, during the rainy season. At the same time, many rural roads are virtually impassable, as seasonal washouts are commonplace. Although the road network has suffered as a result of many years of government debt-related negligence, funds allocated for road maintenance and rehabilitation have increased in the past 10 years.

upload_2017-12-30_12-35-39.png
 
Aisehh nimeamin bakenya ni baongo [emoji23][emoji23][emoji23][emoji23][emoji23]..mm nimehesabu napata 25 hadi nkahisi na ugonjwa wa macho ..watu wanakwambia 38 ..yan 25+13 ..
kwenye maneno 10 ya mkenya chukua 1 uondoke ndio maana hakutaka kuweka picha ya over 20 alijua kibano kinakuja
 
Afu kumbe sio 30 ata
Ni 28flrs[emoji23][emoji23][emoji23][emoji23][emoji23]
Kuna cku nikaona na Kenyata wikipedia wameibadirisha iwe 33flr[emoji23][emoji23][emoji23][emoji23]
45128cca229651f20c3172996ab606ff.jpg
mkenya sio mtu wa kumuamini uongo ndio hulka zao yani wamezoea hvo😀😀😀😀😀
 
AVIC TOWERS wont take 3 years give 2 years at most because now it is at 16 th floor and they just started this year. Pinnacle give it 3 years. Construction has already started give it 2020
Lets add the list again
Cytonn Towers Tower 1 35flr, Tower 2 35 flrs, Tower 3 35flr
Avic Tower 3 28flr
CBK Pension Tower 27 flr
88 Nairobi Tower 44flr
Umeambiwa above 30 fl, huelewi au nini
 
Back
Top Bottom