benignusmulisa
Senior Member
- Feb 4, 2014
- 150
- 167
au sio haya kenua meno sasa 😂😂😂
View: https://www.instagram.com/reel/DD11wrZiLkE/?igsh=bWphcmF3N3Fob2Rk
Hiyo gari ya mjukuu wake Bakhresa
au sio haya kenua meno sasa 😂😂😂
View: https://www.instagram.com/reel/DD11wrZiLkE/?igsh=bWphcmF3N3Fob2Rk
I meant it doesn't change a thing in that the distance is still way longer that what Tanzania has proposed.Inabadilisha sana Nairobi to Mombasa 482km wewe umeweka 500.
Ukifanya total unapata 1083 yaani umeongeza 157km kwenye ukweli halisia.
Hawa nyang'au wanajaribu kila njia ya kupindisha ukweli ili wajione wako vizuri ha ha ha😂Inabadilisha sana Nairobi to Mombasa 482km wewe umeweka 500.
Ukifanya total unapata 1083 yaani umeongeza 157km kwenye ukweli halisia.
kwa hiyo igawa-mbeya - tunduma imekuwa mbeya?I meant it doesn't change a thing in that the distance is still way longer that what Tanzania has proposed.
Nairobi to Mombasa can be 503, 477, 480, 485 etc, it dependa where you start measuring the distance from in Mombasa and where you stop measuring in Nairobi. 500km is just the estimate because the road hasn't been constructed yet. You're being petty. Even your fellow Tanzanian put Arusha to Moshi at 90km yet the distance is slightly less than that (82km) and I don''t see you having a problem with it - in fact all the distaces are estimates.
BTW, I just noticed that the distance from Mbeya to Tunduma is 103km, not 220 which brings your total to about 483, not 600. I also doubt the whole stretch will be a dual carriageway. I think it's just a
Sawa, the point is, those are estimates. Mau Summit to Malaba was a genuine error, the rest are all estimates. Chill.kwa hiyo igawa-mbeya - tunduma imekuwa mbeya?
Igawa -mbeya 140km
Mbeya-tunduma 102km
Upata ngapi
Ukishindwa kubali, achana na hizi aibu ndogondogo mjinga wewe.Kwa hivyo mkenya hawezi miliki gari with plates za bongoslum. Punguza ujinga. 🤣 🤣 🤣 Kwa hivyo everytime hii gari ikikuja Kenya hua imekombolewa. 🤣🤣🤣
Says mlevi wa Mathare 🤣🤣🤣Eti hydropower station!! Wewe kweli kilaza! Hivi, wamaanisha Kenya hakuna hydropower station ama unamaanisha nini? Hivi bongolala, are you even aware that Kenya produces more electricity than Tanganyika and that more than half of it comes from hydropower?
Wewe na wenzako ndio wajinga. Eti walikomboa gari, unaona kama hao ni matajiri wa kukomboa magari.Ukishindwa kubali, achana na hizi aibu ndogondogo mjinga wewe.
Childish.The total length of the roads you listed is 600km. Even if you build all those roads, the facts are:-
1. Kenya has way more existing dual carriageways than Tanzania.
2. Kenya has way more planned dual carriageways than Tanzania.
Here are Kenya's planned dual carriageways (Starting with the most likely to get constructed to the least likely)
1. Nairobi Mombasa = 500km
2. Nairobi Mau Summit = 220km
3. Mau Summit - Malaba = 380km
4. Marua - Isiolo = 140km
Total = 1240km.
Ebu tuonyeshe source ya kule umetoa hio 4000MW sahii tuone.Says mlevi wa Mathare 🤣🤣🤣
Points to notice
1. Largest Hydroelectric Power Station in EAC,
2. Tanzania produces more electricity than kenya as of now 4000MW
Tanzania is endowed with diverse energy sources including biomass, natural gas, hydro, coal, geothermal, solar, wind, and uranium, much of which is untapped. Tanzania’s total energy installed capacity is 1,938.35 MW as of 31st December 2023.Ebu tuonyeshe source ya kule umetoa hio 4000MW sahii tuone.
Mtwara mwanza 1690kmChildish.
Ju turbine zote zishamalizwa ama? Only five turbines are generating power so far, punguza guess work.Tanzania is endowed with diverse energy sources including biomass, natural gas, hydro, coal, geothermal, solar, wind, and uranium, much of which is untapped. Tanzania’s total energy installed capacity is 1,938.35 MW as of 31st December 2023.
Plus 2100mw kutoka nyerere dam unapata 4038mw
![]()
Energy Archives
Tanzania energy production and demand: energy installed capacity, current power production and energy sources. Tanzania's current and estimated energy demand.www.tanzaniainvest.com
JNHPP 99.5 pctJu turbine zote zishamalizwa ama? Only five turbines are generating power so far, punguza guess work.
We are not just listing distances between places, we are listing roads that have plans underway for dualling. You need your head checked if you think for a minute anyone in your government is even thinking of dualling those roads you're listing.Mtwara mwanza 1690km
Mtwara mbeya 1099km
Sumbawanga dar 1147km
Hapo ni kwa uchache tu
Kwikwi si ulianza kusema ksh has the largest road network than Tanzania umesahau?We are not just listing distances between places, we are listing roads that have plans underway for dualling. You need your head checked if you think for a minute anyone in your government is even thinking of dualling those roads you're listing.
Installed capacity si imeandikwa hapo ama hujui kusoma? Ikiwa 100 % complete pia watasema. For now punguza guesswork.JNHPP 99.5 pct
Umeelewa hapo ?
kule kila kitu tayari kinaachochelewesha ni njia za umeme kutoa nyerere Kuja kwenye grid ya taifa pia bado uzalishaji umekuwa mwingi kuliko mahitaji.
Ntakukumbushq tu sgr tanzania mpaka saa dar_Dom imefikia asilimia 99 pamoja ya kuwa tumeshaanza kutumia. Installation ya turbines zote kule tayari tembea uone
Kama hujui Sema usaidiwe .Installed capacity si imeandikwa hapo ama hujui kusoma? Ikiwa 100 % complete si watasema. For now punguza guesswork.
Bro, you joined an ongoing discussion. We were talking about dual carriageways. Kawaida yako kuingilia mambo usiyojua.Kwikwi si ulianza kusema ksh has the largest road network than Tanzania umesahau?
Mimi nimekutajia barabara chache tu ambazo wewe huwezi kuleta network ya morethan 1400km tarmacked road.