Umepigwa za uso, unaanza kuwaita watanzania broBro, you joined an ongoing discussion. We were talking about dual carriageways. Kawaida yako kuingilia mambo usiyojua.
Umepigwa za uso, unaanza kuwaita watanzania broBro, you joined an ongoing discussion. We were talking about dual carriageways. Kawaida yako kuingilia mambo usiyojua.
Unaweza kutuletea statement ya director wa tanescoTANESCO Director amesema installed capacity so far is 1175MW. Wewe unapinga kama nani sasa. 🤣 🤣 🤣 Ukona cheo gani huko TANESCO au unaropokwa tu.
Umegongwa unaanza kuhaha.TANESCO Director amesema installed capacity so far is 1175MW. Wewe unapinga kama nani sasa. 🤣 🤣 🤣 Ukona cheo gani huko TANESCO au unaropokwa tu.
Nilikuwekea source kumbe hukuisoma, ulikimbia tu kusoma headline kama fala. 🤣 🤣Unaweza kutuletea statement ya director wa tanesco
Hii ni taarifa ya lini we maandazi.? 😂😂😂TANESCO Director amesema installed capacity so far is 1175MW. Wewe unapinga kama nani sasa. 🤣 🤣 🤣 Ukona cheo gani huko TANESCO au unaropokwa tu.
Date imeandikwa hapo na bado unaniuliza swali ya ujinga.Hii ni taarifa ya lini we maandazi.? 😂😂😂
Ebu soma hiyo source yako vizuri .Nilikuwekea source kumbe hukuisoma, ulikimbia tu kusoma headline kama fala. 🤣 🤣
Sawa, wewe ndio unajua kuliko TANESCO director. 🤣 🤣Ebu soma hiyo source yako vizuri .
Turbines 9-5 ndo ziko connected
Turbines 4 iko 100% ila not connected
Turbines 3-iko above 87 unajua kwanini
Turbine 2-1 hajaziongelea unajua kwa sababu gani. Sio kila kitu lazima tuweke kwenye media .
Wacha kujiaibisha bro. 😂 😂The total length of the roads you listed is 600km. Even if you build all those roads, the facts are:-
1. Kenya has way more existing dual carriageways than Tanzania.
2. Kenya has way more planned dual carriageways than Tanzania.
Kweli sio wewe uliyeandika the underlined?
What are you disputing there? Ama unapinga that only 1,175MW ndio is operational?Ebu soma hiyo source yako vizuri .
Turbines 9-5 ndo ziko connected
Turbines 4 iko 100% ila not connected
Turbines 3-iko above 87 unajua kwanini
Turbine 2-1 hajaziongelea unajua kwa sababu gani. Sio kila kitu lazima tuweke kwenye media na kama zingekuwa bado sana tusingekuwa na 99.5% ya ukamilifu ingekuwa kwenye 80% ya total project
Hakuna bro wako JFWacha kujiaibisha bro. 😂 😂
Sijui ni kiingereza huelewi ama ni ujinga uko nao. Kama huelewi Kiingereza niambie nirudie kwa Kiswahili.
Cow from KiberaWhat are you disputing there? Ama unapinga that only 1,175MW ndio is operational?
Kumbe neno existing dual carriage imegeuka kuwa zilizopangwa (planned)?Wacha kujiaibisha bro. 😂 😂
Sijui ni kiingereza huelewi ama ni ujinga uko nao. Kama huelewi Kiingereza niambie nirudie kwa Kiswahili.
Wacha kujiaibisha bro. 😂 😂
Sijui ni kiingereza huelewi ama ni ujinga uko nao. Kama huelewi Kiingereza niambie nirudie kwa Kiswahili.
Hii lazima itakuwa ni kingereza.Wacha kujiaibisha bro. 😂 😂
Sijui ni kiingereza huelewi ama ni ujinga uko nao. Kama huelewi Kiingereza niambie nirudie kwa Kiswahili.
Yani nimesoma nikashangaa. Ni kuwa hajakuwa hafuatilii mjadala ama nini mbaya. These guys are a special case. 😂 😂Hii lazima itakuwa ni kingereza.
Na ako tu serious bado anapingana kitu haelewi🤣🤣😂Yani nimesoma nikashangaa. Ni kuwa hajakuwa hafuatilii mjadala ama nini mbaya. These guys are a special case. 😂 😂
Jibu swali neno existing na planned ni sawa?Yani nimesoma nikashangaa. Ni kuwa hajakuwa hafuatilii mjadala ama nini mbaya. These guys are a special case. 😂 😂
KwikwiSawa, wewe ndio unajua kuliko TANESCO director. 🤣 🤣
This thread can make you drop IQ points. 😂 😂 😂Na ako tu serious bado anapingana kitu haelewi🤣🤣😂
For the sake of my mental health, I let you win this one. 😂😂Jibu swali neno existing na planned ni sawa?