Battle: Dar es Salaam vs Nairobi

Battle: Dar es Salaam vs Nairobi

EABL reports net profit of Sh15.6B for the year ended 30/06/2022, a 124% growth from the Sh7 billion the brewer recorded last year.
By comparison, Tanzanian Breweries (Tanzania's largest company) posted half that.
Lanes.

TBL.JPG
 
Fanya lipid profile HDL, LDL, triglycerides and Total cholesterol kwanza zikiwa juu kunywa Rosuvastatin uendelee na mazoezi na healthy diet
Shukrani sana mkuu [emoji120][emoji120]

Bila shaka na wengine wenye tatizo kama hili watafuata huu ushauri wako.
 
By comparison, Tanzanian Breweries (Tanzania's largest company) posted half that.
Lanes.

View attachment 2307209
We jamaa akili yako inakuaga finyu, ni sawa upost net profit ya Safaricom versus Vodacom bila kujua Safaricom Kenya ina monopolize market while Vodacom Tanzania ina share market with other providers pia product prices between the two territories are not the same.
 
EABL reports net profit of Sh15.6B for the year ended 30/06/2022, a 124% growth from the Sh7 billion the brewer recorded last year.
Kama unadhani hiyo sekta ya unywaji mko vizuri jiulize kwanini keroche wamefunga?

Ni monopoly ya soko na cartels kulinda maslahi yao. Nothing more.

Bongo hayo mambo ya kumwagilia moyo ndio mahali pake.. South of Sahara labda ni SA tu wanatupita Kwa consumption na mauzo ya booze.
 
EABL reports net profit of Sh15.6B for the year ended 30/06/2022, a 124% growth from the Sh7 billion the brewer recorded last year.
Ukitoa Tanzania na Uganda hapo unabaki na ngapi? Kunyaland ninyi wanywa mataputapu tu

Screenshot_20220728-205941.png
 
Hapana, hatuwezi kuweka afya zetu rehani kwa jitu linaloitwa WHO. Vipi kama WHO imerubuniwa? Unafahamu kuwa Bill Gates ndiyo mfadhili wa pili wa WHO akiwa nyuma ya nchi (Marekani)? Yaani mtu mmoja anatoa pesa nyingi WHO kuliko serikali za nchi Tajiri kama Japan na Ujerumani, huwezi kujiuliza kwa nini?
Kwahiyo kila mtu afanye vile anavyodhani ni sahihi?, Wewe hayo yote ambayo unayajua kuhusu kudhibiti high blood pressure na magonjwa mengine ni matokeo ya WHO, bila watu tutarudi gizani, hutojua lolote kuhusu dawa na magonjwa.

Kuhusu hayo ya WHO kudhaminiwa na Bill Gate, huo ni uzushi tu, Bill Gate anachangia katika maeneo mengi tu hapa duniani, hata hapa Tanzania ametoa pesa nyingi Sana hasa kupambana na Malaria, Ukimwi na TB, mbona hatutawali au kutuamulia Mambo yetu, iweje akisaidia WHO unakua na mashaka?.

WHO mchangiaji mkubwa ni serikali ya Marekani, Kama zilivyo UN bodies zingine, kila nchi inachangia kulingana na uchumi wake, hiyo habari ya Bill Gate kuwa ndiye mchangiaji mkubwa ni uzushi sio kweli mkuu.

Sent from my itel L5007 using JamiiForums mobile app
 
Tony254 una maoni gani juu ya mtawanyiko wa shares za EACOP? Tuwagawie kidogo? Yaani tunaenda bampa to bampa na mwenye mafuta mganda dadeq [emoji16][emoji16][emoji16]

Hii project ukimuondoa mfaransa Mwingine anaefaidi zaidi ni mtanzania, yaani kiulaini bila hustling tunanyonya tu asali kivulini [emoji23][emoji23][emoji23][emoji23]

Ukisikia kuokota dodo chini ya mchongoma ndio huku! [emoji3526][emoji3526] RIP JPM, Heko Nyerere kwa kumng'oa nduli Id Amin sasa tunakula fadhila

View attachment 2307004
Hapo tunakula hela mara 2 hela ya kwanza ni kwenye shares za biashara ambapo tayari TPDC imeshatoa USD 300ml kama advance payment ya part ya share zake halafu Tz bado inakula hela ya tarrifs kwenye kusafirisha mafuta na handling at the port kama sikosei it was pegged at US 20 per barrel.
 
CC Geza Ulole hiyo stima yenu mtauzia nani.., naona muEthiopia amenyakua soko la Kenya..,

Kenya inks cheap power deal with Ethiopia​

Thursday, July 28, 2022
View attachment 2307090
Kenya Power technicians at work.

By Brian Ambani
Nation Media Group
Kenya on Tuesday officially inked the contract with Ethiopia for the purchase of cheap hydroelectric power even as Nairobi nears completing the transmission line to evacuate power from its northern neighbor.

The two countries have been hammering out details of the power purchase agreement (PPA) over the past year with its official signing this week bringing fresh hope over lower cost of electricity once the line is completed and energized.
Kenya is expected to purchase 200 megawatts (MW) from Ethiopia in the first phase of the multi-phased project before it is scaled up to 400MW in the next phase.
A senior source at Kenya Power yesterday told Nation that the PPA was signed by the company’s acting Chief Executive Geoffrey Muli and his Ethiopian counterpart from the Ethiopian Electric power (EEP) in Naivasha in the presence of senior officials from both countries.
President Uhuru Kenyatta was making a tour of Nakuru County where he commissioned five projects including the 172MW Olkaria 5 and 86 megawatts Olkaria 1 Additional Unit (AU) 6 geothermal power plants in Naivasha.
The other projects he commissioned during his visit includes the Standard Gauge Railway (SGR) - Metre Gauge Rail (MGR) passenger rail link at the Mai-Mahiu Station that links the SGR and the MGR, the Naivasha Inland Container Depot (ICD) and the Suswa water project that will serve the Naivasha industrial park.
“The energy we are generating is not only to power this industrial park but it is also for powering other industries across our nation, our cities, our towns and our homes,” President Kenyatta said.
The Head of State was accompanied by Ethiopian Energy Minister Dr Eyob Tolina, Energy Cabinet Secretary Monica Juma, Transport CS James Macharia, and Turkish Industry Holdings President Mehmet Coşkun.

The African Development Bank (AfDB) funded Ethiopia-Kenya Electricity Highway Project involves the construction of an electricity highway between the two countries made up of about 1,068 kilometres of transmission line.
About 631km of transmission line is being built by the Kenya Electricity Transmission Company (Ketraco) that will allow for transmission of power of up to 2,000MW between Kenya and Ethiopia in either direction.
The state-owned company this week told Nation it would complete construction of the line “within the next few months”.
The project is part of the Eastern African Power Pool (EAPP) Master Plan that aims to interconnect the power grids of five countries in the region namely Ethiopia, Kenya, Tanzania, Uganda and Rwanda.
The deal is set to increase Kenya’s power imports, which cushion consumers from supply hitches in case of local generation challenges.
Kenya also imports electricity from Uganda, which has for decades served the Western region that is traditionally served by the small capacity hydros and co-generation stations such as the Muhoroni Gas Turbine (GT) located in the region.
Kenya imported 34.14 million kilowatt-hours (kWh) of electricity from Uganda in February – the highest amount imported from that country on record – up from imports of 30.34 million units in January amid low local power generation from geothermal and hydro dams.
On Tuesday evening, the Muhoroni GT power station, was hit by technical faults that tripped the electricity grid, temporarily affecting power supply to parts of Nyanza, Western and the Rift Valley.
Ninyi si mnawachimbia visima vya Geothermal hao Ethiopia?, Mbona mnanunua umeme toka kwao?, Sasa hivyo visima vyenu vya Geothermal mtavifukia au mtafanyia nini?[emoji23][emoji23][emoji23]
Tony254

Sent from my itel L5007 using JamiiForums mobile app
 
CC Geza Ulole hiyo stima yenu mtauzia nani.., naona muEthiopia amenyakua soko la Kenya..,

Kenya inks cheap power deal with Ethiopia​

Thursday, July 28, 2022
View attachment 2307090
Kenya Power technicians at work.

By Brian Ambani
Nation Media Group
Kenya on Tuesday officially inked the contract with Ethiopia for the purchase of cheap hydroelectric power even as Nairobi nears completing the transmission line to evacuate power from its northern neighbor.

The two countries have been hammering out details of the power purchase agreement (PPA) over the past year with its official signing this week bringing fresh hope over lower cost of electricity once the line is completed and energized.
Kenya is expected to purchase 200 megawatts (MW) from Ethiopia in the first phase of the multi-phased project before it is scaled up to 400MW in the next phase.
A senior source at Kenya Power yesterday told Nation that the PPA was signed by the company’s acting Chief Executive Geoffrey Muli and his Ethiopian counterpart from the Ethiopian Electric power (EEP) in Naivasha in the presence of senior officials from both countries.
President Uhuru Kenyatta was making a tour of Nakuru County where he commissioned five projects including the 172MW Olkaria 5 and 86 megawatts Olkaria 1 Additional Unit (AU) 6 geothermal power plants in Naivasha.
The other projects he commissioned during his visit includes the Standard Gauge Railway (SGR) - Metre Gauge Rail (MGR) passenger rail link at the Mai-Mahiu Station that links the SGR and the MGR, the Naivasha Inland Container Depot (ICD) and the Suswa water project that will serve the Naivasha industrial park.
“The energy we are generating is not only to power this industrial park but it is also for powering other industries across our nation, our cities, our towns and our homes,” President Kenyatta said.
The Head of State was accompanied by Ethiopian Energy Minister Dr Eyob Tolina, Energy Cabinet Secretary Monica Juma, Transport CS James Macharia, and Turkish Industry Holdings President Mehmet Coşkun.

The African Development Bank (AfDB) funded Ethiopia-Kenya Electricity Highway Project involves the construction of an electricity highway between the two countries made up of about 1,068 kilometres of transmission line.
About 631km of transmission line is being built by the Kenya Electricity Transmission Company (Ketraco) that will allow for transmission of power of up to 2,000MW between Kenya and Ethiopia in either direction.
The state-owned company this week told Nation it would complete construction of the line “within the next few months”.
The project is part of the Eastern African Power Pool (EAPP) Master Plan that aims to interconnect the power grids of five countries in the region namely Ethiopia, Kenya, Tanzania, Uganda and Rwanda.
The deal is set to increase Kenya’s power imports, which cushion consumers from supply hitches in case of local generation challenges.
Kenya also imports electricity from Uganda, which has for decades served the Western region that is traditionally served by the small capacity hydros and co-generation stations such as the Muhoroni Gas Turbine (GT) located in the region.
Kenya imported 34.14 million kilowatt-hours (kWh) of electricity from Uganda in February – the highest amount imported from that country on record – up from imports of 30.34 million units in January amid low local power generation from geothermal and hydro dams.
On Tuesday evening, the Muhoroni GT power station, was hit by technical faults that tripped the electricity grid, temporarily affecting power supply to parts of Nyanza, Western and the Rift Valley.
Ninyi si mnawachimbia visima vya Geothermal hao Ethiopia?, Mbona mnanunua umeme toka kwao?, Sasa hivyo visima vyenu vya Geothermal mtavifukia au mtafanyia nini?[emoji23][emoji23][emoji23]
Tony254

Sent from my itel L5007 using JamiiForums mobile app
 
It’s funny because I’m in the United States right now, and I have an air conditioner in my home. That doesn’t mean my house doesn’t have a central heating system!

If you don’t mind me asking, where exactly in New York and London did you live?
New York - Brooklyn, London - Notting Hill, Limehouse next to Canary wharf hapo ndio nyumba yangu ya kununua mwenyewe ipo, Peckham briefly and canning town.
 
Back
Top Bottom