Stiegler’s dam now near ready for the June 2022 launch​



SATURDAY AUGUST 21 2021​

Julius Nyerere Hydro-Power Project

The ongoing construction of Julius Nyerere Hydro-Power Project in Rufiji River. The project is 62.7 percent complete. PHOTO | EMMANUEL ONYANGO

Summary

  • Recently, engineers installed the draft tubes at the basement of the ninth turbine that will evacuate water from the power generation machines.
  • Energy Minister Dr Medard Kalemani recently inspected the construction work in company of visiting Egyptian Works Minister Assem Gazzer.
  • Situated in the world famous Selous Game Reserve, which is home to a wealth of flora and fauna, it has been widely criticised for its large-scale destruction of the game reserve as a Unesco World Heritage Site.
ADVERTISEMENT

General Image

By EMMANUEL ONYANGO
More by this Author

Works at the Julius Nyerere Hydro-Power Project (JNHPP) in Rufiji River, also known as the Stiegler’s dam project, are now at advanced stage, and concentrated on fixing the delicate but crucial machinery to get the dam ready for power generation. The project is 62.7 percent complete.

Recently, engineers installed the draft tubes at the basement of the ninth turbine that will evacuate water from the power generation machines. The concrete slab of the base of the dam is only 42.7 metres above sea level and will supports 27 turbines that are yet to be installed. The works now are for strengthening the concrete walls for water tunnels and the final installation of the draft tubes before the turbines are fixed, ready for the power generating machines to be tested.

The dam’s turbines individually have a capacity to generate 235 megawatts and in total, JNHPP will generate 2,115 MW to be added on the national grid, and a surplus to be sold to neighbouring countries. Johari Kashwamba of the national utility under which the dam falls, told The EastAfrican that the works are now a 24-hour operation to meet the April 2022 deadline, preceeded by the filling dam in November. Over 32.3 billion litres of water will collect behind the dam and in June 2022, full operations are expected with first supply of electricity to the country.

Energy Minister Dr Medard Kalemani recently inspected the construction work in company of visiting Egyptian Works Minister Assem Gazzer. The dam is being built by a consortium of Elsewedy Electric and Arab Construction, both from Egypt

But the JHNNP has not been without controversy. When the project was first commissioned, international environmental conservationists decalred it an ecological disaster, a threat to wildlife especially the black rhinoceros and elephants. Also about 2.6 million trees were felled to pave the way for the construction. Situated in the world famous Selous Game Reserve, which is home to a wealth of flora and fauna, it has been widely criticised for its large-scale destruction of the game reserve as a Unesco World Heritage Site. Two months ago, Selous survived being struck off the Unesco List when the government defended the project that affordable electricity is important to the economic growth.




MY TAKE
Hii figure the East African wameichomoa matakoni ama?
 
Eti world athletics zen "under" sasa ndio nn, kwnn "under" hiyo ya under nchi yoyote duniani inaweza kuandaa hata ile ambayo haina viwanja standard kama Kenya pia inaweza
Nyinyi mna infrastructure ipi kuhost tournament kama hii inavutia wanariadha zaidi ya 1000 kutoka mataifa zaida ya 115???
 
Sasa unaogopa hata kunitag😂😂😂. Kwa SGR nishakuambia how dwarf yours is compared to ours, kwa BRT, Nairobi commuter rail is a thousand times better than that failed system.

View attachment 1902338
View attachment 1902340

View attachment 1902341


Platform ya ngazi na ramps! A very poor structure, yaani engineering died in Kenya! Na all the bragging Wakunya walishindwa ku-dig out the rail track lower the rail in a such a way the commuter train to be levelled with the old platform! Kazi za kijuakali ndo mnaturingishia!? Ni tender alipewa kapuku mmoja sio?

2891818_IMG_20201127_205610.jpg
 
Platform ya ngazi na ramps! A very poor structure, yaani engineering died in Kenya! Na all the bragging Wakunya walishindwa ku-dig out the rail track lower the rail in a such a way the commuter train to be levelled with the old platform! Kazi za kijuakali ndo mnaturingishia!? Ni tender alipewa kapuku mmoja sio?

2891818_IMG_20201127_205610.jpg
Mr Methuselah these things are beyond your processing ability. Talk to me about commuter railway the day you will have one😂😂
 
JKIA terminal 1B & C under construction. Completion is due Jan 2022.