CS James Macharia, EGH (@JamesMacharia_) Tweeted:
Inspecting construction of the James Gichuru Jn - Rironi Road, which we are upgrading into a 6-lane dual carriageway with 4 lanes of Service Roads, and 17.5km of Collector Roads. This road is critical to facilitating movement between the eastern and western parts of Kenya.
https://t.co/5ZaobiBWvt (
)
CS James Macharia, EGH (@JamesMacharia_) Tweeted:
Assessing the progress of rehabilitation of the 67.7 Km Thika – Mang’u – Magumu (flyover) Road, which traverses Kiambu and Nyandarua counties. This is one of the ring roads that will decongest the Nairobi Metropolitan Area by linking Thika Road to the Nairobi – Nakuru highway.
https://t.co/lXfsbDtaWt (
)