Ulikuwa hujui brine ni nini baada ya ku-mention cycles saahii unajifanya kunifundisha

1. haya nipe process ya lithium rechargeable battery! How does it work?

2. How heat is extracted from geothermal well?
We fanya hivi, wewe endelea tu kua mjinga. 🤣🤣🤣
 
Kenya tunaproduce 944 MW of geothermal power. Soon tunatinga 1,000 MW of geothermal power. Nchi ya Ethiopia ni ya pili kuproduce geothermal power in Africa ila wao wanaproduce 5 MW pekee kwa sasa. Baadaye Ethiopia itaproduce more geothermal power wakati miradi zake miwili zitakapokamilika. Nyie lazy bones endeleeni kujenga mabwawa ya maji.
Kinyerezi 1 Extension project ...as we speak 45MW has been added out of 185 MW expected
Screenshot_20220618-144431_Chrome.jpg
Screenshot_20220619-003839_Chrome.jpg
 
Congrats. In total baada ya kuongeza hizi 185 MW, Kinyerezi itazalisha MW ngapi in total?
Kinyerezi 1 is 150 MW running since 2015
Kinyerezi 2 is 240 MW running since 2017
Kinyerezi 1 Extension 185 MW

Total =575 MW from Kinyerezi plants alone

Planned
Kinyerezi 3 600 MW
Kinyerezi 4 450MW

Plus Ubungo also has its gas Plants
Ubungo 1 110MW
Ubungo 2 100mw
Ubungo 3 ..112 MW
 
Wivu ndio inakusumbua.

still brine solution in its natural form haina lithium mpaka i-contact Lithium! FYI during geothermal energy extraction water is flashed in a brine tank before being pumped to a geothermal well!
 
Drilling is the hardest part, tutafune nyama tushindwe na mfupa. Wewe fala nini.
Drilling is the easiest part! Si unaona Baada ya kuchimba kisima Mjapan ana-set up a plant!
 
Si unaona kwa a mining country kama Tanzania ni kitu rahisi!

Successful well drilled for Kiejo-Mbaka geothermal project, Tanzania



Alexander Richter Alexander Richter
1 year ago
Tanzania Geothermal Development Company (TGDC) has successfully spud-in the first geothermal well in Tanzania at the Kiejo-Mbaka project.









It is with great enthusiasm that we were notified of the successful spudding-in of the first geothermal well in Tanzania under the state Geothermal Development Company (TGDC). The well KMB-01 was spud-in on 22nd March 2021 at around 11:09 am EAT.

The Kiejo-Mbaka shallow wells drilling project shall not only set a stage for future drilling works but also will go down in the history as a demonstration of TGDC and indeed the dedication of the Government of Tanzania towards accelerating the development of geothermal resources in Tanzania.

The commencement and successful completion of this project will substantially unlock a slice of geo-scientific comprehension of the Kiejo-Mbaka geothermal system, an important attempt towards the entire development of the prospect. Besides, the project will open doors to future possibilities particularly in research, innovation and development endeavors.

The planned work on the project currently consist of drilling of three shallow wells each to a maximum measured depth of 300 meters with a final open hole HQ diameter, and the set up of drilling infrastructure works i.e. access roads, water supply and drill pads.

The objective with the current slim-well drilling program is to precisely locate and verify the existence of geothermal resource, determine reservoir characteristics (temperature, alteration minerals, permeability and fluid chemistry) and estimate the ability of wells to produce geothermal fluids. It is further targeted to define the thermal gradient over the area and establish the configuration of the thermal anomaly and to preliminary test the conceptual model and allows planning of subsequent deep exploratory well slim wells- 1,500m depth with 4½? final diameter and full-size wells 1,800m depth with 7? final diameter.

Upon sufficient discharge of hot waters from the wells, the wells will be prematurely used for direct use projects. The drilled wells shall enable accessing the hot geothermal fluids, then transfer it through pipelines to the various direct use pilot projects, after which the fluids will be returned into the reservoir.

We thank the Project Manager of the project, Eng. Chagaka Kalimbia for sharing these great news.

 
Si unaona kwa a mining country kama Tanzania ni kitu rahisi!

Successful well drilled for Kiejo-Mbaka geothermal project, Tanzania



Alexander Richter Alexander Richter
1 year ago
Tanzania Geothermal Development Company (TGDC) has successfully spud-in the first geothermal well in Tanzania at the Kiejo-Mbaka project.









It is with great enthusiasm that we were notified of the successful spudding-in of the first geothermal well in Tanzania under the state Geothermal Development Company (TGDC). The well KMB-01 was spud-in on 22nd March 2021 at around 11:09 am EAT.

The Kiejo-Mbaka shallow wells drilling project shall not only set a stage for future drilling works but also will go down in the history as a demonstration of TGDC and indeed the dedication of the Government of Tanzania towards accelerating the development of geothermal resources in Tanzania.

The commencement and successful completion of this project will substantially unlock a slice of geo-scientific comprehension of the Kiejo-Mbaka geothermal system, an important attempt towards the entire development of the prospect. Besides, the project will open doors to future possibilities particularly in research, innovation and development endeavors.

The planned work on the project currently consist of drilling of three shallow wells each to a maximum measured depth of 300 meters with a final open hole HQ diameter, and the set up of drilling infrastructure works i.e. access roads, water supply and drill pads.

The objective with the current slim-well drilling program is to precisely locate and verify the existence of geothermal resource, determine reservoir characteristics (temperature, alteration minerals, permeability and fluid chemistry) and estimate the ability of wells to produce geothermal fluids. It is further targeted to define the thermal gradient over the area and establish the configuration of the thermal anomaly and to preliminary test the conceptual model and allows planning of subsequent deep exploratory well slim wells- 1,500m depth with 4½? final diameter and full-size wells 1,800m depth with 7? final diameter.

Upon sufficient discharge of hot waters from the wells, the wells will be prematurely used for direct use projects. The drilled wells shall enable accessing the hot geothermal fluids, then transfer it through pipelines to the various direct use pilot projects, after which the fluids will be returned into the reservoir.

We thank the Project Manager of the project, Eng. Chagaka Kalimbia for sharing these great news.

Sasa unasema nini na mumechimba shallow well ya only 300meters🤣🤣🤣 Hio nikama kuchimba a complex water borehole. Hio hiwezi toa hata mvuke ya maji ugali. If drilling was easy, mbona hizo countries wasijichimbie wenyewe. Drilling is very complex and costly.
 
Kengen wanachimba 3km deep wells. Wewe unatuonyesha 300 meters. 🤣🤣🤣
One year later you have nothing to show while KENGEN is doing wonders.

 
Kengen wanachimba 3km deep wells. Wewe unatuonyesha 300 meters. 🤣🤣🤣
One year later you have nothing to show while KENGEN is doing wonders.

Tuliza mshono drilling is not an issue to us a mining country a reason we r doing alone unlike Ethiopia that hired u people!
 