Ondoa huo uchafu kama ni mgeni kwenye uzi huu tafuta namna bora ya kujiunga na wachangiaji,pia utakuwa na homework hata ya mwezi mmoja na nusu ya kupitia kurasa zote za uzi huu maana unaweza jikuta unarudia vitu vya kale ukiwa na bashasha..mshamba mwingine huyo kutoka Mathare..anayefikiri ngo'mbe ndo mnyama mkubwa duniani..bro kuna Elephant..Dar is an Elephant.Hands down.🙌
tuna the whole of SADC to sell to! and Southern Africa power pool btn Tanzania and Zambia is currently U/C! BTW just like Lamu port 3 berths, GERD is in its 10th year of construction without completion!
Sadc working towards increasing power generation and transmission
THE Southern African Development Community (Sadc) continues to seek ways of increasing power generation across the Region to surpass the 3 595 megawatts (MW), out of a targeted 4 000MW, contributed in 2019 by Angola, the Democratic Republic of Congo, Malawi, Mozambique, Namibia, South Africa and the United Republic of Tanzania.
Energy is a key enabler of economic development and that is why there has been notable progress across the Region in power generation, and interconnector projects that seek to connect countries to the region’s power pool.
Under Sadc Vision 2050’s Second Pillar of Infrastructure Development in Support of Regional Integration, the target is that by 2050, the Region would have efficient and effective cross-border infrastructure apparatus, services and networks to support and facilitate deeper regional integration and reduce or avoid transboundary conflicts. The region envisions integrated and quality seamless infrastructure and networks, including improved capacity for construction, maintenance and operation of affordable regional infrastructure and services.
As part of the measures to increase power generating in the Region and given the nexus between energy and development, Sadc Ministers of Energy recently met to consider various energy projects.
Among key issues, the Ministers approved a draft agreement to amend the Sadc Protocol on Energy of 1996 and recommended legal clearance of the draft by the Ministers responsible for Justice and Attorneys General, and subsequent submission to the Council of Ministers for consideration and approval in March 2021.
The Ministers met in a meeting virtually hosted by Mozambique on October 30, 2020, during which they deliberated on programmes of regional dimensions in support of the implementation of the recently approved Sadc Regional Indicative Strategic Development Plan (RISDP) 2020-30 and Sadc Vision 2050, particularly programmes for infrastructure development.
The Ministers commended progress achieved on the roadmap for finalisation of the review and amendment of the Protocol, which is based on 10 principles under which Member States work collectively to ensure that energy in different forms is used efficiently to support economic growth and sustainable development; utilise energy to promote self-reliance; and promote and encourage participation of citizens, communities and the private sector in the development of energy infrastructure and services.
The rationale for review of the Protocol on Energy of 1996 is based on eliminating inconsistencies, correcting inadequacies, emerging institutional reforms and promoting private sector participation in infrastructure development.
The amendment of the Protocol on Energy is expected to unlock value in the energy sector in the Region, resulting in more private players coming on board with infrastructure projects in energy and power generation.
Sadc is targeting to commission 16 515 megawatts of new electricity generation capacity over the next three years as the region moves to strengthen its energy infrastructure as an enabler for its industrialisation agenda. Of that amount, nearly 5 900MW is expected to come from South Africa, while the United Republic of Tanzania plans to commission about 4 900MW. Other significant contributions to the regional power pool are expected from Angola (2 499MW) and Zambia (1 186MW).
However, of the 16,515MW additional generation capacity planned for commissioning, only 9 731MW, or about 59 percent, will be available to the regional grid since Sadc is not yet fully integrated in terms of energy trading.
All mainland Sadc Member States, with the exception of Angola, Malawi and Tanzania, are interconnected through the Southern Africa Power Pool (SAPP) regional grid, allowing them to share surplus energy. New generation capacity installed in any of the three non-participating countries is not accessible to the nine other members of SAPP — Botswana, the Democratic Republic of Congo, Eswatini, Lesotho, Mozambique, Namibia, South Africa, Zambia and Zimbabwe.
In terms of interconnector projects, there has been notable progress on preparation and implementation of priority interconnector projects that aim to connect Angola, Malawi and Tanzania to the SAPP grid.
The Mozambique-Malawi interconnector attained financial closure and is at construction stage and is expected to be commissioned in 2022.
The Zambia-Tanzania interconnector is divided into several components and it is at construction phase from the Zambian side and Tanzania side where the two transmission lines are designed to converge near Nakonde Border by 2022.
The Angola-Namibia Interconnector is at feasibility studies stage and is also expected to be commissioned by 2022 following expression of commitment by the two Member States by signing the Inter-Governmental Memorandum of Understanding.
On the north-western side of the region, Angola and the DRC are also considering to develop an interconnector project which is still at pre-feasibility stage.
To unlock and leverage the development of the interconnector projects, SAPP is undertaking, with support from the World Bank, a study on establishment of a Regional Transmission Infrastructure Financing Facility. The recommendations of the study are expected to be presented to Council of Ministers for consideration and approval in March 2021.
The Secretariat is advocating for the development of the Western transmission corridor along DRC, Angola, Namibia Botswana and, Central transmission corridor along South Africa, Botswana, Zimbabwe and Zambia and Tanzania and Eastern corridors along South Africa, Mozambique, Malawi and Tanzania of SAPP network in order to relieve congestion from the existing central corridor.
To enhance investments in power projects in the region, the Ministers responsible for Energy approved the Market and Investment Framework for Sadc Power Projects as an instrument to guide investors who want to venture into power generation and transmission projects. – Sardc
The largest hydropower project in Africa, is set to be operational by 2023. Ethiopia’s Minister of Water, Irrigation and Energy Eng. Seleshi Bekele revealed the report and said that the Grand Ethiopian Renaissance Dam (GERD) will be operational as per the reschedule.
The minister said that the news follows following the successful completion of the first round filling, second filling is going to be held during the coming rainy season-on July 2021. According to him, construction of GERD has reached 78.3% and it is expected to be completed up to 82% until the upcoming rainy season.
“Ethiopia is keenly working on completing the construction of GERD by 2023 and considering the dam as water security threat is unfounded and unscientific. The overall construction of the dam has seen rapid development following the swift measures taken by the reformist administration to ensure professionalism. The administrative adjustments have solved the most critical problems related to decision making and follow-up system,” said Eng. Seleshi Bekele.
Africa’s biggest power exporter
The minister further added that, the new administration and the board jointly with the Ministry and Ethiopian Electric Power (EEP) have solved the factors that led for the delay of the construction before the reform in 2018. Solving the major problems, undertaking continuous follow-up, assessment and evaluation has enabled the country to return the process of the construction of the massive power plant on the right truck.
The GERD project has been under construction since 2011. It is in the Benishangul-Gumuz Region of Ethiopia, about 15 km (9 mi) east of the border with Sudan. It is expected to produce 6,000-megawat which will be the centerpiece of Ethiopia’s bid to become Africa’s biggest power exporter. GE Alstom, a US-French joint venture was previously awarded US $61m to install and commission the six turbine units. Two are being finalized to help early generation of 750MW.
Kenya's military budget is bigger than that of Uganda and Tanzania combined. KDF has more than 150 planes currently in service, not like the lazy bongolalas with a mere 30 planes. Zingine hata ni scrap metal haziwezi kufly. Hatuko level Moja. If you are in doubt just check Global firepower military rankings.
wivu? sisi au nyie mna wivu wa mpaka kutengeneza stats za kupika ati Kenya ina 70 vehicles per capita na Tanzania ina 7 vehicles per capita! Angalia miradi ya kifalafala isiyokuwa planned ahead! Kisa Mchina katoa mkopo!
Mchina hajatoa mkopo wowote kwa huu mradi. Huu mradi ni PPP. Kama hujui maana ya PPP sema uelezewe. Serikali ya Kenya haijaomba mkopo wowote ili kujenga mradi huu. Investor mwenyewe ametoa pesa yake mfukoni na kujenga mradi huu. Atarudisha pesa yake baadaye kupitia toll fees.
Halafu hakuna data tumepika, hio statistic ni Mtanzania mwenzako aliyepost. Sisi tumekuja tu kuchangia. Muulize yeye katoa wapi data hio.
JamiiForums uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.