Sawa. But we have the resources not fully utilized. We have so many power plants projects coming. By next yr we will have 3000 and we will have 10000kh by the time sgr is cmpletedMko na 1344 mW iyo haiezi tumika kwa electric train...
Sawa. But we have the resources not fully utilized. We have so many power plants projects coming. By next yr we will have 3000 and we will have 10000kh by the time sgr is cmpletedMko na 1344 mW iyo haiezi tumika kwa electric train...
What's your problems, guys, just wait and see. Nimegundua kuwa wewe una stamina ya ubishi, unabishana kwenye kila kitu ili uonenake unaweza bishana...Mko na 1344 mW iyo haiezi tumika kwa electric train...
Kw or mwSawa. But we have the resources not fully utilized. We have so many power plants projects coming. By next yr we will have 3000 and we will have 10000kh by the time sgr is cmpleted
Hakuna kitu unajua kuhusu Tanzania alafu bad unajifanya wajua!!Mko na 1344 mW iyo haiezi tumika kwa electric train...
How will you add 9000mw in 2.5 years...give me references on thisSawa. But we have the resources not fully utilized. We have so many power plants projects coming. By next yr we will have 3000 and we will have 10000kh by the time sgr is cmpleted
MwKw or mw
Nimzuri kujua...kujielimishana ni mzuri...Tanzania ikiendelea ni raha yangu same na UG ,Rwanda etcWhat's your problems, guys, just wait and see. Nimegundua kuwa wewe una stamina ya ubishi, unabishana kwenye kila kitu ili uonenake unaweza bishana...
I can't argue with you...
Give me references on this..achieving 9000 mw in a short period is only possible by nuclear eneegy..about 4 yrs
We have the feedstock. What else you want?How will you add 9000mw in 2.5 years...give me references on this
Give me a reference or a screenshotWe have the feedstock. What else you want?
A feedstock needs to pass several processes before being consumed that's why I need referencesWe have the feedstock. What else you want?
We have a number of power stations coming up. Gas is already in place. We dont depend on HEP like you guys.How will you add 9000mw in 2.5 years...give me references on this
We have a number of power stations coming up. Gas is already in place. We dont depend on HEP like you guys.How will you add 9000mw in 2.5 years...give me references on this
Kenya depends on Geothermal,HEP, and now building a mega Wind power in turkana..we also have plans for nuclear in order to achieve vision 2030...I need references to the amount of energy you would produceWe have a number of power stations coming up. Gas is already in place. We dont depend on HEP like you guys.
Ni kama vile mimi ninavyopenda kuijua Nairobi. I have been there two times lakini siwezi kusema kuwa naijua vizuri... Natamani kujua maeneo mengi ili nikija nitembelee...Nimzuri kujua...kujielimishana ni mzuri...Tanzania ikiendelea ni raha yangu same na UG ,Rwanda etc
Im plannig all these activities here. So my comments are reliable than the articles you want. Take it from me.Give me a reference or a screenshot
70% Kenyans are connected to the grid..Tz 30%...how can you have an electric train before connecting citizens to power..that misplaced prioritiesWe have a number of power stations coming up. Gas is already in place. We dont depend on HEP like you guys.
U said you were in Town..westie...uko westie side gani I really doubt uIm plannig all these activities here. So my comments are reliable than the articles you want. Take it from me.
We also have the sources you mentioned but love clean energy most, which is gasKenya depends on Geothermal,HEP, and now building a mega Wind power in turkana..we also have plans for nuclear in order to achieve vision 2030...I need references to the amount of energy you would produce
Hizo ni data za 199070% Kenyans are connected to the grid..Tz 30%...how can you have an electric train before connecting citizens to power..that misplaced priorities