Battle: Dar es Salaam vs Nairobi

Battle: Dar es Salaam vs Nairobi

Mwanza
33795208_1818190711810825_3954249610582556672_n.jpg
 
Hii sio ppf inajengwa buda....70 floors unthani ni mchezo? foundation lazima Ikuwe 100% Tough and then the hights game begin. Hapo ndio mtajua hamjui
Burj khalifa yenye flr 162 unafaham ilitumia miaka mingap kujengwa hadi kukamilika?buda Kwani mnajenga SGR Apo?
 
Burj khalifa yenye flr 162 unafaham ilitumia miaka mingap kujengwa hadi kukamilika?buda Kwani mnajenga SGR Apo?
So untaka kuniambia Burj ilichukua 1 year ikamalizika & yet ilianza 2004 ikaisha 2010!!(6yrs).
While pinnacle inachukua 3yrs
Na unajua foundation ndio hutake the longest..
Construction began on 6 January 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010, [2][13] and is part of the 2 km 2 (490-acre) Downtown Dubai development at the 'First Interchange' along Sheikh Zayed Road , near Dubai's main business district. The tower's architecture and engineering were performed by
Souffian AL-Jabiry of Chicago , with Adrian Smith as chief architect, and Bill Baker as chief structural engineer. [14][15] The primary contractor was Samsung C&T of South Korea .[16]
At a certain point in the architectural and engineering process, the original Emaar developers had run into a financial issue, and had required more money and economic funding, therefore Sheikh Khalifa, the ruler of the United Arab Emirates, had granted monetary aid and funding, hence resulting in the changing of the name to "Burj Khalifa".
 
So untaka kuniambia Burj ilichukua 1 year ikamalizika & yet ilianza 2004 ikaisha 2010!!(6yrs).
While pinnacle inachukua 3yrs
Na unajua foundation ndio hutake the longest..
Construction began on 6 January 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010, [2][13] and is part of the 2 km 2 (490-acre) Downtown Dubai development at the 'First Interchange' along Sheikh Zayed Road , near Dubai's main business district. The tower's architecture and engineering were performed by
Souffian AL-Jabiry of Chicago , with Adrian Smith as chief architect, and Bill Baker as chief structural engineer. [14][15] The primary contractor was Samsung C&T of South Korea .[16]
At a certain point in the architectural and engineering process, the original Emaar developers had run into a financial issue, and had required more money and economic funding, therefore Sheikh Khalifa, the ruler of the United Arab Emirates, had granted monetary aid and funding, hence resulting in the changing of the name to "Burj Khalifa".
Tangu nmeingia jf 2016 hadi leo mnachimba nn sasa?
 
So untaka kuniambia Burj ilichukua 1 year ikamalizika & yet ilianza 2004 ikaisha 2010!!(6yrs).
While pinnacle inachukua 3yrs
Na unajua foundation ndio hutake the longest..
Construction began on 6 January 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010, [2][13] and is part of the 2 km 2 (490-acre) Downtown Dubai development at the 'First Interchange' along Sheikh Zayed Road , near Dubai's main business district. The tower's architecture and engineering were performed by
Souffian AL-Jabiry of Chicago , with Adrian Smith as chief architect, and Bill Baker as chief structural engineer. [14][15] The primary contractor was Samsung C&T of South Korea .[16]
At a certain point in the architectural and engineering process, the original Emaar developers had run into a financial issue, and had required more money and economic funding, therefore Sheikh Khalifa, the ruler of the United Arab Emirates, had granted monetary aid and funding, hence resulting in the changing of the name to "Burj Khalifa".
three yrs na tayar foudation imekula 2yrs😀😀😀😀.

na inazidi kuchimbwa.

🙂🙂🙂🙄🙄🙄
 
Nungu wewe kingereza kimekuja kwa meli usijifanye unakijua kumbe unaendelea kuonekana hopeless. Wewe mweusi tiii utakijulia wapi kingereza!? Usidhani hapa tupo darasa la tatu. Kwikwikwikwikwi. Akili zako ni za kitoto sana.
hawa watu ni brain washed, sishangai wanapoona sawa watu zaidi ya 2.5 million kuishi kwenye slums KIBERA angali ardhi yao wanayostahili imenyakuliwa na wazungu na wakenya wachache sana.
 
hawa watu ni brain washed, sishangai wanapoona sawa watu zaidi ya 2.5 million kuishi kwenye slums KIBERA angali ardhi yao wanayostahili imenyakuliwa na wazungu na wakenya wachache sana.
Wanashangaza sana. Nadhani wakenya siyo watu ni wanyama. Itabidi tupime DNA zao. Haiwezekani watu wanaisha maisha ya mateso halafu wanaendelea kushangilia.
 
Tangu nmeingia jf 2016 hadi leo mnachimba nn sasa?
We acha Panganga hapa... The pinnacle ilianza 2018 Officially....Ground preparation inaeza hata anza 1990 But construction ikuwe 2018...did you know where the Pinnacle n & montave are standing was once a forest?? But uzuri mtalia just a like mlilia Avic na Britam mkiziita Renders but Mlijikuta mmenyamaza wenyewe the same way mtanyamaza Pinnacle ikiisha hii ni Nairobi bana! Buildings are build due to demand not show off, infact Dar haiwezi handle Such buildings as The Pinnacle ju Occupation rate yenyu ni ndogo sana...70floors!!! Buda! Hauwezi kaa chini ujiulize why it is in Nairobi "Terror Hot Bed" & not Dar??
 
We acha Panganga hapa... The pinnacle ilianza 2018 Officially....Ground preparation inaeza hata anza 1990 But construction ikuwe 2018...did you know where the Pinnacle n & montave are standing was once a forest?? But uzuri mtalia just a like mlilia Avic na Britam mkiziita Renders but Mlijikuta mmenyamaza wenyewe the same way mtanyamaza Pinnacle ikiisha hii ni Nairobi bana! Buildings are build due to demand not show off
Kwikwikwikwikwi
 