Sama boy 255
JF-Expert Member
- Mar 5, 2021
- 13,806
- 41,703
The addition of BRT lanes mean more qulity, more lanes(from two lanes to 6 lanes) more efficiency.Itβs like saa hii Kenya iamue kujenga BRT in Jogoo road and Outering Road. There will be no increase in paved roads number cause those roads aware already paved beforeππ
Marsabit county has only 2km of paved Tarmac roads...au nimesoma vibaya.....Just a reminder that Nakuru has more than double the paved roads than Dar is Slumππππ
View attachment 3127510
View attachment 3127511
Does it increase the length of paved roads? ππThe addition of BRT lanes mean more qulity, more lanes(from two lanes to 6 lanes) more efficiency.
Paved roads in Kundustan less than Paved roads in Juba. π€£ π€£ π€£ π€£Does it increase the length of paved roads? ππ
Acha uongo. Kama Dar ndio Tanzanian most important region yet it only have 400km of paved roads. Hiyo kagera sasa itowe 1000km of paved roads wapi? I doubt hata kama yao imefika 1kmπππππMarsabit county has only 2km of paved Tarmac roads...au nimesoma vibaya.....
Mkoa wa Kagera tu upo located km 1000+ from Dar es Salaam...una 1053km of paved tarmac roads.
Aisee nyingi mnapika data hasa linapokuja suala la international data.
Yes, inaongeza urefu wa barabara zetu pana with in the city, hapo awali tulikua na barabara pana zenye urefu mdogo kulinganisha na sasa. Kwasasa barabara zetu kubwa with Dar zote ni za 6-14 lanes.Does it increase the length of paved roads? ππ
Read to understand. They say National grid. Kagera alone 80% inatumia umeme nje ya GridWakati 80% of Kenyans are connected to electricity, huko Tanzania bado wako at 37%ππππ
View attachment 3127586
Bukombe to Mtukula is 400kmAcha uongo. Kama Dar ndio Tanzanian most important region yet it only have 400km of paved roads. Hiyo kagera sasa itowe 1000km of paved roads wapi? I doubt hata kama yao imefika 1kmπππππ
View attachment 3127609
Lol, the Kwacha was weaker than even the Tanzanian shilling before they redenominated (dropped 3 zeroes). Since then it's value has been dropping seriously. At the time of their redonimination, the kwacha was equal to about 20 KES, currently it's only 5. In 10 years time it'll be lower than the shilling. Same with Ghanaian cedi.Tembea muone...even Zambian kwacha is stronger than Kenyan shilling. 1kwacha is like 5ksh.
There are a lot of projects going on in zambia like Lusaka to Ndola Dual carriageway which is 327km and the longest in East and central Africa
Nyinyi endeleeni kujipiga kifua mtajikuta ni the poorest in Africa
Dar has 400km of paved roads, are you aware of that?ππRead to understand. They say National grid. Kagera alone 80% inatumiz
Bukombe to Mtukula is 400km
Nyakanazi to Rusumo is 107km
Nyakanazi to kobelo is 137km
Bukoba to Rubafu is 50km
Muhutwe to Kamachumu, nshamba 50km
Kyamyorwa to Muganza 65km
Bukoba to karagwe 100km
Bukoba Mugana via katoma 25km
Total 934km
Those are just Main roads in Kagera... don't count other street roads that are tarmac
Nyinyi mnapika data tu
Marsabit country has 2km of Road are you aware of thatDar has 400km of paved roads, are you aware of that?ππ
Do you know what length is? Does length and upana the same? You are always a baboonππYes, inaongeza urefu wa barabara zetu pana with in the city
Are you aware that Nakuru has double the number of paved roads than Dar?πππ€£Marsabit country has 2km of Road are you aware of that
Barabara za Dar unazijua au unatupigia tu pangβaa zako.? πππDar has 400km of paved roads, are you aware of that?ππ
Hawa nyang'au wamebaki kupiga mateke ya punda anayekufa, ha ha haπMarsabit country has 2km of Road are you aware of that
Nilikua najua kama usingeelewa chochote since wew ni zuzu na kiswahili hujui..ππππ kuliko uonekana andazi you better delete your comment poor boy.Do you know what length is? Does length and upana the same? You are always a baboonππ
The part of Nairobi - Moyale road (A2) that is in Marsabit County alone is 365km and it's all tarred. Bro, are you just arguing to keep the argument going?π€£π€£Marsabit country has 2km of Road are you aware of that
Hilo jinga. Teargas anatafuta faraja π€£ π€£ π€£ π€£Read to understand. They say National grid. Kagera alone 80% inatumiz
Bukombe to Mtukula is 400km
Nyakanazi to Rusumo is 107km
Nyakanazi to kobelo is 137km
Bukoba to Rubafu is 50km
Muhutwe to Kamachumu, nshamba 50km
Kyamyorwa to Muganza 65km
Bukoba to karagwe 100km
Bukoba Mugana via katoma 25km
Total 934km
Those are just Main roads in Kagera... don't count other street roads that are tarmac
Nyinyi mnapika data tu
Normal in TanzaniaThe part of Nairobi - Moyale road (A2) that is in Marsabit alone is 365km and it's all tarred. Bro, are you just arguing to keep the argument going?π€£π€£
View attachment 3127632
Sasa umeanza kushift goal post, umetoka kwa malls tena baada ya kugundua we ni fala.π€£ π€£Tembea muone...even Zambian kwacha is stronger than Kenyan shilling. 1kwacha is like 5ksh.
There are a lot of projects going on in zambia like Lusaka to Ndola Dual carriageway which is 327km and the longest in East and central Africa
Nyinyi endeleeni kujipiga kifua mtajikuta ni the poorest in Africa
Kama huamini taarifa za Mama Ngina, basi amini za Tanesco π π€£ π€£Mama Ngina News π€£π€£π€£ππππ