Battle: Dar es Salaam vs Nairobi

Battle: Dar es Salaam vs Nairobi

tuusan i hope umejionea na bado kunazo za Nairobi hazijakua added kwa hio final list. Probably wata add by September.
 
African cities by number of 20+ floor buildings. Complete or U/C


Update August 2017
1.Cairo --------------------------69------Egypt
2. Johannesburg incl. Sandton---61------South Africa
--Johannesburg------------------54------South Africa
3. Durban incl. Umhlanga-------59------South Africa
--Durban-------------------------45------South Africa
4.Luanda-------------------------52------Angola
5.Nairobi-------------------------44------Kenya
6.Lagos incl. EAC-----------------36------Nigeria
7.Cape Town---------------------32------South Africa
8.Dar es Salaam----------------29------Tanzania
9.Oran---------------------------25------Algeria
10.Pretoria------------------------24------South Africa
11 Algiers-------------------------22-----Algeria
12.Abidjan------------------------15------Cote d'Ivoire
13.Kinshasa----------------------10------D.R. Congo
14.Eko Atlantic---------------------8------Nigeria
14.Alexandria---------------------8------Egypt
14.Maputo-------------------------8------Mozambique
15.Abuja---------------------------7------Nigeria
15.Addis Ababa-------------------7------Ethiopia
15.Casablanca--------------------7------Morocco
--Sandton------------------------7------South Africa
16.Khartoum----------------------6------Sudan
17.Kampala-----------------------5------Uganda
17.Harare-------------------------5------Zimbabwe
--Umhlanga---------------------4------South Africa
18.Tripoli-------------------------4------Libya
19.Port Elizabeth-----------------3------South Africa
__________________
[emoji12] [emoji12] [emoji12] [emoji12] [emoji1] [emoji1] [emoji1] [emoji1]

Sent using Jamii Forums mobile app
 
these are completes 20+ floors in Nairobi

1. Britam tower complete 33flrs
2. UAP/Old Mutual Tower complete 33Flrs
3. Times Tower complete- 38flrs
4. Teleposta Tower complete - 27 - (These are 3 towers of 27, 25 and 23)
5. NSSF complete - 28flrs (two towers)
6. Cooperative bank tower complete - 25flrs
7. KICC complete - 28flrs
8. Hilton hotel complete- 24flrs
9. Anniversary Towers complete - 28flrs
10. Nyayo house complete - 27flrs
11. Rahimtula Tower complete - 22flrs
12. Ambank House complete - 22flrs
13. Delta Center complete - 21flrs
14.Delta corner tower A complete - 21flrs
15.Delta corners tower B complete - 21flrs
16. KCB Tower complete 23flrs
17. National Bank Tower complete 21flrs
18. Uchumi House complete - 21flrs
19. Hazina tower complete - 25flrs
20. Lonrho House complete - 22flrs
21. Reinsurance Plaza complete - 20flrs
22. Viewpark Tower complete - 20flrs
23. Ecobank Tower complete - 20flrs
24. the Bazaar complete - 20flrs
25. Afya center complete- 21 floors
26. fourth Ngong avenue tower complete 25flrs
27. University of Nairobi tower complete 22 flrs
28. Golf course hotel complete 21flrs

These are topped out 20+ floors towers

30. prism tower t/o 34flrs
31. First community bank tower 25flrs
32. Lemac tower t/o 26flrs
33. parliament tower t/o 26flrs
34. Kings dinstinction t/o 20flrs

Under Construction

35. one africa place u/c- 23 flrs
36. Upper Hill Chambers - 28flrs
37. the pinacle Tower 1 - 60flrs
38. the pinacle tower 2 - 45flrs
39. Avic tower 1 - 43 flrs
40. Avic tower 2 - 35 flrs
41. Avic tower 3 - 28 flrs
42. Avic tower 4 - 25 flrs
43. Avic tower 5 - 24 flrs
44. Avic tower 6 - 24 flrs

In addition
-Montave 3 towers(40,30,22) floors at site preparation and excavation
-CBK pension house 27 floors at excavation level
-88 Nairobi tower 44 floors ( Developer has made regulatory filings to NEMA for approval within 1 month with site office for marketing already built)
-Akili tower 30 floors(Now at approval stage,developer in project update says construction starts in the last quarter of this year)
-Uon parklands school of law building

Dar Es Salaam ,Updated ..Noof towers completed,t/o,u/c
Completed

emoji1484.png

1.Tpa 40flrs
2.Pspf B 35flrs
3.Pspf A 35flr
4.BOT north 20flr
5.Bot south 20flr
6.Mafuta house Benjamin Mkapa Pension tower 22flrs
7.Golden jubilee 22flrs
8.Uhuru heights 27flrs
9.Rita tower 30flrs
10.Viva tower A 21flrs
11.Viva tower B 21flrs
12.Ushirika tower 21flrs
13.Mafao House 21flrs
14.Lapf Millenium towers 30flrs
15.Samora house 21flrs
16.City Piaza 21flrs
17.Umoja Wa Vijana 1 25flrs
18.Umoja wa Vijana 2 25flrs
19.Quality Bouvierlard 20flrs
20.Dar Marine Tower 22flrs
Topped Out
emoji1484.png

21.MNF tower 1 30flr 145m
22.MNF tower 2 30flr 145m
23.Sky Tower 22flr
24.NHC square office tower 22flr
25.NHC square residential tower 20flrs

under construction
26.Ppf Hq 35flrs ..now on 26th flr
27.Mzizima office tower 35flrs now on 31st flr
28.Mzizma residential tower 33flrs ..now on 28th flr
29.Al Karimo Plaza 20flrs ..now 10th flr
__________________
 
these are completes 20+ floors in Nairobi

1. Britam tower complete 33flrs
2. UAP/Old Mutual Tower complete 33Flrs
3. Times Tower complete- 38flrs
4. Teleposta Tower complete - 27 - (These are 3 towers of 27, 25 and 23)
5. NSSF complete - 28flrs (two towers)
6. Cooperative bank tower complete - 25flrs
7. KICC complete - 28flrs
8. Hilton hotel complete- 24flrs
9. Anniversary Towers complete - 28flrs
10. Nyayo house complete - 27flrs
11. Rahimtula Tower complete - 22flrs
12. Ambank House complete - 22flrs
13. Delta Center complete - 21flrs
14.Delta corner tower A complete - 21flrs
15.Delta corners tower B complete - 21flrs
16. KCB Tower complete 23flrs
17. National Bank Tower complete 21flrs
18. Uchumi House complete - 21flrs
19. Hazina tower complete - 25flrs
20. Lonrho House complete - 22flrs
21. Reinsurance Plaza complete - 20flrs
22. Viewpark Tower complete - 20flrs
23. Ecobank Tower complete - 20flrs
24. the Bazaar complete - 20flrs
25. Afya center complete- 21 floors
26. fourth Ngong avenue tower complete 25flrs
27. University of Nairobi tower complete 22 flrs
28. Golf course hotel complete 21flrs

These are topped out 20+ floors towers

30. prism tower t/o 34flrs
31. First community bank tower 25flrs
32. Lemac tower t/o 26flrs
33. parliament tower t/o 26flrs
34. Kings dinstinction t/o 20flrs

Under Construction

35. one africa place u/c- 23 flrs
36. Upper Hill Chambers - 28flrs
37. the pinacle Tower 1 - 60flrs
38. the pinacle tower 2 - 45flrs
39. Avic tower 1 - 43 flrs
40. Avic tower 2 - 35 flrs
41. Avic tower 3 - 28 flrs
42. Avic tower 4 - 25 flrs
43. Avic tower 5 - 24 flrs
44. Avic tower 6 - 24 flrs

In addition
-Montave 3 towers(40,30,22) floors at site preparation and excavation
-CBK pension house 27 floors at excavation level
-88 Nairobi tower 44 floors ( Developer has made regulatory filings to NEMA for approval within 1 month with site office for marketing already built)
-Akili tower 30 floors(Now at approval stage,developer in project update says construction starts in the last quarter of this year)
-Uon parklands school of law building

Dar Es Salaam ,Updated ..Noof towers completed,t/o,u/c
Completed

emoji1484.png

1.Tpa 40flrs
2.Pspf B 35flrs
3.Pspf A 35flr
4.BOT north 20flr
5.Bot south 20flr
6.Mafuta house Benjamin Mkapa Pension tower 22flrs
7.Golden jubilee 22flrs
8.Uhuru heights 27flrs
9.Rita tower 30flrs
10.Viva tower A 21flrs
11.Viva tower B 21flrs
12.Ushirika tower 21flrs
13.Mafao House 21flrs
14.Lapf Millenium towers 30flrs
15.Samora house 21flrs
16.City Piaza 21flrs
17.Umoja Wa Vijana 1 25flrs
18.Umoja wa Vijana 2 25flrs
19.Quality Bouvierlard 20flrs
20.Dar Marine Tower 22flrs
Topped Out
emoji1484.png

21.MNF tower 1 30flr 145m
22.MNF tower 2 30flr 145m
23.Sky Tower 22flr
24.NHC square office tower 22flr
25.NHC square residential tower 20flrs

under construction
26.Ppf Hq 35flrs ..now on 26th flr
27.Mzizima office tower 35flrs now on 31st flr
28.Mzizma residential tower 33flrs ..now on 28th flr
29.Al Karimo Plaza 20flrs ..now 10th flr
__________________
endelea kujipa moyo hvohvo😀😀😀😀😀😀😀😀😀
safari hii vichwa vitapata moto sana
 
Hahahaha yani total complete in Nairobi is more than everything you have in Dar.
 
Back
Top Bottom