Geza Ulole
Platinum Member
- Oct 31, 2009
- 72,894
- 103,759
JKIA is a damn ugly airport
![]()
MY TAKE
Looks like a
The airport will look like this after completion of rehabilitation.👇👇👇🤣👇ort in the era of sleek glass and steel around the World! 🤣 🤣 🤣 🤷♂️
still an ugly concrete fortification, a medieval era style! Mshike adabu kujifananaisha na Dar au Tanzania as far as airport facilities r concerned! Mind u Msalato International Airport is loading!
Hatuezikuwa tunashindana na nchi inapata shida kuhudumia air travellers milioni moja 🤣🤣😂still an ugly concrete fortification, a medieval era style! mshike adabu kujifananaisha na Dar au Tanzania as far as airport facilities r concerned! Mind u Msalato International Airport is loading!
Malindi ni international yet haina flights hata moja toka overseas? Na mbona control tower ipo juu ya PAX terminal?
![]()
Wapi radar?
Wapi Hangar?
![]()
![]()
HANGARAGE
The Giant Kilimanjaro Hangar Space
The terminal interior does its best to emulate the mood lighting concept. Kilimanjaro International Airport has one of the biggest hangar facility in the history African aviation on its day. Not even a debate. This facility can accommodates Boeing 787 or two ATRs at the same time. However, the nose pocket adjustment gives this facility upper hand to absorb the as large as an A32O.
The hangar facility trigonometred on 85 meters width, 63 meters length, and 33 meters heights. It orchestrated by two electric doors weigh 40 tons each. They are very heavy, for them to move to require 48 kilowatts from motors installed on each door. Nevertheless, thanks to this radian gear technology, which gives the ability to push them even with bare hands. The project started in October 1978 for the architect design and drawing. After two years, in 1980 all initial procedures ended. After that, it was handed-over to a Holland company J.W Rador and B.V Holland where collaboratively they started stated the project. After five years of hardworking (1980-1985), the project ended with the following amenities.
Training Room
Quality Control Room
Budget Control Room
Production Room
Spare Parts Room
Maintenance & Eng. Manager Room
Secretariats Room
Director of Operation Room
Operation and Communication Room
Chief Pilot Room
Crew Room
Spare Room
Store Room
Canteen Hall etc.
View attachment 1867463
Kilimanjaro International airport hangar facility remains to be extraordinary features until today. You won't see this kind of facility at a normal airport. Thus why all we agree whenever the future holds, even in this limbo of technology and moderation, but this facility remains to be one of the turning point, a flagship, in hangar history in Africa.
Why You Should Hangar With Us
Massive hangarage space. Able to accommodates Boeing 787
Excellent infrastructures
Few meters walk to the hotel facilities
Located in the heart of the busiest aviation hub in the region
Adjacent to the VIP lounge
Prestigious terminal building
Ukinionyesha hangar kama hii Malindi local airport nahama!
![]()
Maana hangar kama hii huwezi pata
![]()
Mind u hii hangar ipo Moshi airstrip!
Donated by Japan and not working at the moment!Kuna wajinga wanajaribu kulinganisha ujinga na JKIA.
View attachment 1867446View attachment 1867447View attachment 1867449View attachment 1867450View attachment 1867452
Malindi ni international yet haina flights hata moja toka overseas? Na mbona control tower ipo juu ya PAX terminal?
![]()
Wapi radar?
Wapi Hangar?
![]()
![]()
HANGARAGE
The Giant Kilimanjaro Hangar Space
The terminal interior does its best to emulate the mood lighting concept. Kilimanjaro International Airport has one of the biggest hangar facility in the history African aviation on its day. Not even a debate. This facility can accommodates Boeing 787 or two ATRs at the same time. However, the nose pocket adjustment gives this facility upper hand to absorb the as large as an A32O.
The hangar facility trigonometred on 85 meters width, 63 meters length, and 33 meters heights. It orchestrated by two electric doors weigh 40 tons each. They are very heavy, for them to move to require 48 kilowatts from motors installed on each door. Nevertheless, thanks to this radian gear technology, which gives the ability to push them even with bare hands. The project started in October 1978 for the architect design and drawing. After two years, in 1980 all initial procedures ended. After that, it was handed-over to a Holland company J.W Rador and B.V Holland where collaboratively they started stated the project. After five years of hardworking (1980-1985), the project ended with the following amenities.
Training Room
Quality Control Room
Budget Control Room
Production Room
Spare Parts Room
Maintenance & Eng. Manager Room
Secretariats Room
Director of Operation Room
Operation and Communication Room
Chief Pilot Room
Crew Room
Spare Room
Store Room
Canteen Hall etc.
View attachment 1867463
Kilimanjaro International airport hangar facility remains to be extraordinary features until today. You won't see this kind of facility at a normal airport. Thus why all we agree whenever the future holds, even in this limbo of technology and moderation, but this facility remains to be one of the turning point, a flagship, in hangar history in Africa.
Why You Should Hangar With Us
Massive hangarage space. Able to accommodates Boeing 787
Excellent infrastructures
Few meters walk to the hotel facilities
Located in the heart of the busiest aviation hub in the region
Adjacent to the VIP lounge
Prestigious terminal building
Ukinionyesha hangar kama hii Malindi local airport nahama!
![]()
Maana hangar kama hii huwezi pata
![]()
Mind u hii hangar ipo Moshi airstrip!
believe me the over half of PAX hawajashuka! Wameenda Zanzibar!Maiden flight, EUROWING(MOMBASA)
View attachment 1867475View attachment 1867478View attachment 1867481View attachment 1867483