Kisumu - Vihiga road. Kenya forgot about Wood poles long time ago.

ERJgvCwW4AEBezL.jpg
 
Aaaah weee stop that shit ,ulisema DAR haikui imekufa blindly nikaone nikupe vidonge vyako...kwann usivimeze?

Sent using Jamii Forums mobile app
We told you that your size is Mombasa. Apart from BRT everything you are doing now Nairobi did them long time ago. When it comes to modern markets Nairobi is building thrice the number is Dar es salaam is doing.
 
On going road projects in Kenya with other several roads missing.

On-Going Roads Projects
NoProject Name/ActivityRegion/ CountyLength (Lane KM)Base (31st June 2018) KMFY 2018/2019
Achievement (lane km)
Acc. Lane KmPhysical Progress
Q1Q2Q3Q4
1Loruk – Barpelo (B17)Baringo/Elgeyo Marakwet13282000 8291.0%
2Nuno-Modogashe (A13)Garissa270602637.630 153.677.5%
3Eldoret BypassUasin Gishu640000.3 0.37.1%
4Construction of Kibwezi - Mutomo - KituiMakueni/ Kitui38438.840.45522.06 156.2651.5%
5Mombasa – Mariakani Contract 1: Mombasa – Kwa Jomvu Rd (A109)Mombasa80005.4915.51 2150.0%
6MPARD Package 2: Mwache - MtezaMombasa35.840000 00%*
7MPARD Package 3: Mteza – KibundaniMombasa/Kwale27.440000 00%*
8Construction of Western bypassNairobi/Kiambu70.80000 00.0%
9Upgrading of Kalobeiyei River - NadapalTurkana1760011.46.76 18.1613.1%
10Upgrading of Lokitaung Junction - Kalobeiyei RiverTurkana1600010.410.56 20.9612.9%
11Upgrading of Lodwar - Lokitaung JunctionTurkana1600022.29.66 31.8633.3%
12Upgrading of Loichangamatak - LodwarTurkana1000010.24.6 14.818.7%
13Kisii – Ahero –Isebania (A1) Lot 1: Isebania - KisiiKisii/Migori36801216.418.18 46.5820.0%
14Kisii – Ahero –Isebania (A1) Lot 2: Kisii - AheroKisii/Kisumu38405.43853.14 96.5428.8%
15Kitale – Endebes - SuamBusia/Bungoma900000 013.5%
16Chiakariga – Meru (C92)Meru110773.8211.8 94.674.0%
17OljoOrok - Dundori (B20)Nyandarua7018 1898.0%
18Garsen – Lamu – WituLamu270046.9217 27.9230.0%
19Uplands - GithunguriKiambu940002 218.0%
20Nyaru - ItenElgeyo Marakwet640003 335.0%
21Ugunja-Nyadorera-RuambwaSiaya26.700010 1069.3%
22Mau Narok-Kisiriri (B18)Narok340000 026.6%
23Busia - MalabaBusia2804283 3553.7%
24Posta (Naibor) - Kisima - MaralalLaikipia/Samburu650000 032.0%
25Narok - SekenaniKajiado1641419727 6765.5%
26James Gichuru- RironiNairobi/kiambu1565.82.62.418.5 29.318.0%
27Kisumu - KakamegaKisumu/Kakamega152126370.3 136.399.0%
28Kakamega - Kaburengu (Webuye) NewKakamega8028.33510.658.45 52.4384.0%
29Kisumu Boys - MamboleoKisumu18.411.195.496.450 23.1386.0%
30Magogo - Kwa JomvMombasa160000 00%*
31Access Link Road to New Lamu PortLamu130000 00%*
32Dualling of Athi River - Machakos TurnoffMachakos4017.26.813.47.4 44.860.0%
33Construction of Interchange at Kericho Jn (B1/C23)KerichoN/A19%16%51%63% 63.30%63.3%
34Construction of Interchange at Ahero Jn (A1/B1)KisumuN/A15%12%50%72% 72.00%72.0%
35Wei Wei BridgeBaringoN/A0%4.00%5.00%8% 8.00%8.0%
36Marigat BridgeBaringoN/A0%8.00%10.00%16% 16.00%16.0%
37Endau BridgeBaringoN/A0%1.00%3.00%6% 6.00%6.0%
38Garden City/School of Monetary StudiesNairobiN/A2%9.00%15.00%20% 20.16%20.2%
39Witeithie/Mang'u Foot BridgeKiambuN/A10%14.00%21.00%31% 30.70%30.7%
40Lomut BridgeBaringoN/A0%2.00%6.00%8% 8.00%8.0%
 
All these planned are now under construction as at 2020.

PLANNED PROJECTS AS AT 31ST MARCH 2018
NoName of Project/Road NoFundingInterventionLocation (County)ConstituencyLength
(Km)
1Mombasa - Mariakani Contract 2: Kwa Jomvu - Mariakani (A8)KfW & EIBDuallingMombasa/KilifiRabai, Kaloleni30
2Upgrading of Loichangamatak - LokicharWorld BankUpgradingTurkanaTurkana South40
3Dualling of Kenol - Sagana -Marua DuallingMurang'a/Embu/
Kirinyaga/Nyeri
Maragwa South, Mwea West, Kirinyaga West,Mathira East84
4Malindi – Mombasa – Lunga lunga (B8/A14)-Phase 1:Mombsa-MtwapaAfDBDuallingMombasa/KilfiNyali, Kisauni, Kilifi South13
5JKIA – Likoni Road – James GichuruPPPUpgradingNairobi/MachakosWestlands/Embakasi18
 
All these planned are now under construction as at 2020.

PLANNED PROJECTS AS AT 31ST MARCH 2018
NoName of Project/Road NoFundingInterventionLocation (County)ConstituencyLength
(Km)
1Mombasa - Mariakani Contract 2: Kwa Jomvu - Mariakani (A8)KfW & EIBDuallingMombasa/KilifiRabai, Kaloleni30
2Upgrading of Loichangamatak - LokicharWorld BankUpgradingTurkanaTurkana South40
3Dualling of Kenol - Sagana -MaruaDuallingMurang'a/Embu/
Kirinyaga/Nyeri
Maragwa South, Mwea West, Kirinyaga West,Mathira East84
4Malindi – Mombasa – Lunga lunga (B8/A14)-Phase 1:Mombsa-MtwapaAfDBDuallingMombasa/KilfiNyali, Kisauni, Kilifi South13
5JKIA – Likoni Road – James GichuruPPPUpgradingNairobi/MachakosWestlands/Embakasi18
Thanks for planning 🤣🤣🤣🤣🤣🤣
 