Battle: Dar es Salaam vs Nairobi

kinyerezi 3 cost yake ni ngap??? na kinyerezi 4 ????

Kwa vyovyote vile cost ya Kinyerezi 3 na 4 haiwezi kuwa chini ya huu mradi! I challenge him to produce the figures! Ikumbukwe huu mradi wa Songwe river basin unaambatana na aspects za irrigation ambazo ni benefits pia!
 
hapa kwa kweli nasema big NO.. hio gharama inatosha kujenga kinyerezi 3 & 4 za 900MW
Ila huu mradi hauinvolve production ya umeme tu una sub project 26
Including hio ya umeme tho ya umeme ndo itacost kama 80% ya hela yote..bado naona ku spend around 1trillion kisa umeme tu ni Boko...

Nimeona wanasema wanajenga na dam na labda pia associated supply sysytem ila duh..550mil usd ni bora kinyerezi 3 inayokuwa estimated ku cost 700mil usd itazalisha 600mw

Kinyerezi 2 246MW ilicost 345million usd

Kinyerezi 1 extension 185MW 188mil usd

Sasa kutumia almost 550mil usd kwa bwawa la 180mw sio plan nzuri
 
Hii si ndo walisema hakuna ukanda huu..Aibu [emoji23][emoji23][emoji23]
 
Kwa vyovyote vile cost ya Kinyerezi 3 na 4 haiwezi kuwa chini ya huu mradi! I challenge him to produce the figures! Ikumbukwe huu mradi wa Songwe river basin unaambatana na aspects za irrigation ambazo ni benefits pia!
kwa ufahamu niliosikia kinyerezi three alone sio chini ya 300usd
 
Gharama za uendeshaji kinyerezi III n IV? Mind u gas has to be bought n regular maintenance needed!
 
Gharama za uendeshaji kinyerezi III n IV? Gas has to be bought!
Yeah..gas has to be bought..thats what keeps the cost per unit juu..despite ni the cheapest in EA...

Ila tunanunua Gas TPDC yani tanesco ananunua from tpdc..ambao wao wana hisa kwenye hizo wells of course sio big % ila wana hisa ..

My strong argument..is TpDc used almost _500+ mil usd na nying ni mkopo from Exim China...kujenga bomba la gas amabalo wanasema utilization yake iko below 20% ...so whats the aim ya kufanya hvyo kama hatutatumia kwa kuongezea mitambo ya gas ..?..viwanda vitazidi kuungwa bado ila havitumii gas kama powe plants
 

katika hiyo $550 mln, umeangalia value chain yake? Ukijenga gas to electricity generation plant ni una-import generators na kufunga! Pretty sure over 90% of the project cost is to be outsourced i.e from abroad that includes the procurement of manpower with the necessary skills (gas to electrical power generatorion).

Unlike gas-electric power generation when one does hydropower plant, steel bars, quarries and cement plus civil engineers r from within the country (Tanesco has been doing hydropower projects since 1970s) only generators n few engineers r to be procured from outside! While hydropower is civil workers intensive n readily local available, hence economic multiplying effect!


BTW u mentioned Kinyerezi III and IV but u r listing Kinyerezi III and Kinyerezi I extension! which is which mzee? Can u tell us Kinyerezi I cost before extension? How about lifespan of the power generators? Kingine Songwe hydropower project is to produce up to +300 MW that 180 MW is all year round figure!
 