Kwani hizo render ungepost ni tall?π€£π€£πUmeanza visingizio vya dwarf ππ
let us remind you what modern buildings look likeConstruction of this building started in 2013, upto date haijawaishaπππ.
This one started in 2019 by 2021 mambo ilikuwa ishaisha.
View attachment 3622184
Hawaelewi anything.I know the process of buying an apartment.
The render/model is supposed to be 100% accurate.
Client akitaka apartment, they are literally pointed to the exact unit on the plastic scale model. No surprises.
Kama ni corner house 6th floor unit 6B.. whatever. You see it in front of your eyes.
These Tandale natives don't have any clue.
Actually it's 13 years, construction of Mzizima started in 2013.Mzizima ambayo imekuwa under construction for 9 years! π€£π€£π€£π€£
It's been under construction tangu nijiunge na hili jukwaa
Kwahio wewe na akili zako unafikiri Mzizima tower ilisimama kwasababu ya ukosefu wa fedha? Acheni kujitia ujuaji kwa vitu msivyovijua.Jumba limejengwa kwa mwendo wa kobe πππ.
Ldc ni ldc tu
but still here are the feedbacksActually it's 13 years, construction of Mzizima started in 2013.
sawa tumekuskiaActually it's 13 years, construction of Mzizima started in 2013.
It was actually 2 branches in Nakuru on the same day.
au huna macho πYou call GTC a slum? ππ
Is that how low you've stooped? If GTC is a slum hii hapa tuitaje?View attachment 3622161
BTW apa ndo heart of Nairobi hatujapost sehem sasa mnaishi nyieYou call GTC a slum? ππ
Is that how low you've stooped? If GTC is a slum hii hapa tuitaje?View attachment 3622161
wenzenu wanakuja tz kujifunza nyie mnapiga keleleAta umewapatia mbali.
The entire TZ has less than 5 buildings under construction over 20 floors. ππ
Sio visingizio. Majumba za 10-19 floors hatuna hamu nazo tena. Yamejaa Nairobi. We no longer document them. Huko kwenu ndio bado zinatumika kama yardstickUmeanza visingizio vya dwarf ππ