Utakuwa na matatizo kwa ubongo giant wa fake giidiipi labda lakini sivinginevyo...km stendi tu ni tatizo [emoji1787][emoji1787][emoji1787] can you tell me how long wll take you to have a proper and decenty bus terminal leave aside electric train , BRT or sufficience electricity[emoji1787][emoji1787][emoji1787]poor youEthiopia is emerging while Kenya is already the giant. Kingerez ndio shida ama?
Hiyo ndio iliyokuwepo katika mkataba, ila baadae ikaongezeka (Variation) ikafika $146M. Sasa hako ka overpass mnakoita interchange onyesha kaligharimu bei gani?Acha uongo wewe hiyo barabar ni $86m. Ni lini utajua to convert currencies?
Ubungo interchange 2020 progress with photos - CCE l ONLINE NEWS.
ichoboy01 ebu rudi hapa 😂 😂 😂 . Hii article yako inasema kuwa as of 2020 Tanzania only connected 2.7 million customers to the national electricity grid. How many households do you have in Tanzania? ALafu tukiachana na hiyo,unafaa kujua kuwa by 2018 Kenya walishaunganisha 6.8 million customers to the national grid.
Tanzania records highest percentage in access to electricity
May 11, 2020
Featured image: Stock
Energy Minister Dr Medard Kalemani has announced that Tanzania has recorded its highest percentage in access to electricity so far with 84.6% in 2020.
Dr Kalemani said the number of villages with access to electricity rose to 9,112 in April 2020 from 2,018 in 2015, reports Tanzania Daily News.
Read more about:
Tanzania
Energy access
Energy mix
The number of customers connected to the main source of power also reached over 2.766 million, up from 1.473 million, or an increase of 1.293 million new connections.
According to the minister, power generation in the country had also increased to 1,601.84 megawatts as of last April from only 1,308MW in 2015.
The increase in power capacity is attributed to the completion of Kinyerezi I and II natural gas-powered station generating a combined capacity of 398.22MW.
Sign up for the ESI Africa newsletter
Natural gas in the country’s largest source of power mix accounting to 892.72MW of the national grid.
Hydropower contributes 573.70MW, while heavy oil and biomass make up of 88.80MW and 10.50MW, respectively.
Dr Kalemani also revealed that works on the construction of the Julius Nyerere Hydropower Project (JNHPP), which will pump an additional 2,115MW into the national grid, has reached 85% and will be completed in 2022.
“We are planning to continue implementing other electricity-generating projects during the forthcoming financial year,” he said.
Energy projects underway
The lined-up projects include the ongoing Rusumo Hydropower Project – a shared project between Tanzania, Rwanda and Burundi whose work has now reached 61%.
The energy minister listed other projects that will be implemented in 2020/21 as Ruhudji project (358MW), Kakono (87MW), Rumakali (222MW), Malagarasi (45MW), Kikonge (300MW), Kinyerezi I Extension (185MW), Mtwara (300MW) and renewable energy projects (solar 150 megawatts, wind 200MW and coal 600MW).
“We’re committed to increasing our power distribution networks,” he added.
He cited some projects including the 400kV Singida-Arusha- Namanga, 220kV Makambako- Songea, 220kV Bulyanhulu- Geita, 220kV Geita-Nyakanazi, 220kV Rusumo-Nyakanazi, and 400kV Iringa-Mbeya-Tunduma- Sumbawanga-Mpanda- Kigoma-Nyakanazi, which is commonly known as Northwest grid.
Join the discussions on Power S
kenya-economic giant – Strategic Intelligence ServiceUtakuwa na matatizo kwa ubongo giant wa fake giidiipi labda lakini sivinginevyo...km stendi tu ni tatizo [emoji1787][emoji1787][emoji1787] can you tell me how long wll take you to have a proper and decenty bus terminal leave aside electric train , BRT or sufficience electricity[emoji1787][emoji1787][emoji1787]poor you
Must be typing error I think, you cant talk about 9,000 villages and 2.7M People, that is impossible.ichoboy01 ebu rudi hapa [emoji23] [emoji23] [emoji23] . Hii article yako inasema kuwa as of 2020 Tanzania only connected 2.7 million customers to the national electricity grid. How many households do you have in Tanzania? ALafu tukiachana na hiyo,unafaa kujua kuwa by 2018 Kenya walishaunganisha 6.8 million customers to the national grid.
Tanzania records highest percentage in access to electricity
May 11, 2020
Featured image: Stock
Energy Minister Dr Medard Kalemani has announced that Tanzania has recorded its highest percentage in access to electricity so far with 84.6% in 2020.
Dr Kalemani said the number of villages with access to electricity rose to 9,112 in April 2020 from 2,018 in 2015, reports Tanzania Daily News.
Read more about:
Tanzania
Energy access
Energy mix
The number of customers connected to the main source of power also reached over 2.766 million, up from 1.473 million, or an increase of 1.293 million new connections.
According to the minister, power generation in the country had also increased to 1,601.84 megawatts as of last April from only 1,308MW in 2015.
The increase in power capacity is attributed to the completion of Kinyerezi I and II natural gas-powered station generating a combined capacity of 398.22MW.
Sign up for the ESI Africa newsletter
Natural gas in the country’s largest source of power mix accounting to 892.72MW of the national grid.
Hydropower contributes 573.70MW, while heavy oil and biomass make up of 88.80MW and 10.50MW, respectively.
Dr Kalemani also revealed that works on the construction of the Julius Nyerere Hydropower Project (JNHPP), which will pump an additional 2,115MW into the national grid, has reached 85% and will be completed in 2022.
“We are planning to continue implementing other electricity-generating projects during the forthcoming financial year,” he said.
Energy projects underway
The lined-up projects include the ongoing Rusumo Hydropower Project – a shared project between Tanzania, Rwanda and Burundi whose work has now reached 61%.
The energy minister listed other projects that will be implemented in 2020/21 as Ruhudji project (358MW), Kakono (87MW), Rumakali (222MW), Malagarasi (45MW), Kikonge (300MW), Kinyerezi I Extension (185MW), Mtwara (300MW) and renewable energy projects (solar 150 megawatts, wind 200MW and coal 600MW).
“We’re committed to increasing our power distribution networks,” he added.
He cited some projects including the 400kV Singida-Arusha- Namanga, 220kV Makambako- Songea, 220kV Bulyanhulu- Geita, 220kV Geita-Nyakanazi, 220kV Rusumo-Nyakanazi, and 400kV Iringa-Mbeya-Tunduma- Sumbawanga-Mpanda- Kigoma-Nyakanazi, which is commonly known as Northwest grid.
Join the discussions on Power S
Tanzania only has 2.7 million customers connected to power in 2020 while Kenya had 6.9 million customers connected to power in 2018. As for households, each electricity customer represents a household.Fool, get to know the meaning oif households first (an household can have 10 people) and what main source of power mean for Tanzania (It there can be on grid connection n yet there can be offgrid connections too)!
You can connect a village with electricity but people living in those villages hawana stima kwa nyumba zao and that`s what brings 2.7 million customers and 32% electricity access rate.Must be typing error I think, you cant talk about 9,000 villages and 2.7M People, that is impossible.
What is important here is the number of village connected which is about 85% of all villages in Tanzania.
Stop show me your stupidity....so support from diaspora make kunya giant real?so iyo msada wa 700+mill usd toka kwa ndug zenu ndio habari umeina unilete fool[emoji706]
Tanzania only has 2.7 million customers connected to power in 2020 while Kenya had 6.9 million customers connected to power in 2018. As for households, each electricity customer represents a household.
Fool, get to know the meaning of households first (an household can have 10 people) and what main source of power mean for Tanzania (It can be on grid connection n yet there can be offgrid connections too)!
Hakuna cha typing error, should I show you another article with same number?Must be typing error I think, you cant talk about 9,000 villages and 2.7M People, that is impossible.
What is important here is the number of village connected which is about 85% of all villages in Tanzania.
Kwahiyo vijiji zaidi ya Elfu 9 kwa watu 3M ni wastani kila kijiji wameunga watu 100 pekee?, it doesnt make sense.You can connect a village with electricity but people living in those villages hawana stima kwa nyumba zao and that`s what brings 2.7 million customers and 32% electricity access rate.
So that 2.7M, out of howmany villagers?Hakuna cha typing error, should I show you another article with same number?
Za moto kabisa
You should ask me the number of households, not villages. Household ni kama nyumba moja ,yani baba, mama na watoto. plus any other person that live that house.So that 2.7M, out of howmany villagers?
It makes sense ukilinganisha na hile 32% access rate.Kwahiyo vijiji zaidi ya Elfu 9 kwa watu 3M ni wastani kila kijiji wameunga watu 100 pekee?, it doesnt make sense.
Wewe stick to your low and old models, next time understand the topic. "on average"., nyie your level ni akina cameroon, Togo, Ghana na akina Uganda pia kwa hiyo sector, old model dala dalas ni kama 80%.,Kaaa na wakunya wenzio ndio mjipe moyo....hebu angalia picha yako mwenyew inakumbua[emoji1787][emoji1787][emoji1787][emoji1787][emoji23][emoji23][emoji23][emoji23][emoji117][emoji116]kile kiuchafu cha kwanza kule ni nini? [emoji1787][emoji1787][emoji1787]View attachment 1600959