Thika Highway ($360mln) vs Kibaha Highway ($65 mln)


Patriot

Patriot

JF-Expert Member
Joined
Feb 11, 2008
Messages
3,031
Likes
1,878
Points
280
Patriot

Patriot

JF-Expert Member
Joined Feb 11, 2008
3,031 1,878 280
Still significant precent will go through highways!
What is that significant? I like going for really numbers.

Dar is going over 5 million population, where buying a car is no longer a richman's option. like the developed, cars are becoming household tools. Will you accommodate all these roadspace requirements by widening roads? Let us be serious!
 
Kafrican

Kafrican

JF-Expert Member
Joined
Jan 26, 2015
Messages
4,164
Likes
3,621
Points
280
Kafrican

Kafrican

JF-Expert Member
Joined Jan 26, 2015
4,164 3,621 280
Sipendi kuzozana na Wapumbavu wa Wikipedia!


Thika superhighway completion set for June
Spanning 42km the Thika superhighway Project will have a 39km footpath and cyclists’ lane/FILE

NAIROBI, Kenya, Apr 10 – The completion of the Thika superhighway has been pushed to June.

Several hitches have held back the project, missing both the December 2011 and March 2012 deadlines.

Consulting Engineering firm APEC’s Managing Director Johnson Matu said besides land acquisition issues, heavy rains in the latter part of last year caused unexpected delays.
“We are having an issue with the removal and relocation of service lines, water pipes, power and some have not be relocated, so the contractor was unable to complete the works,” he said.
The relocation process and land acquisition has cost an estimated Sh5 billion, while supervision costs now stand at Sh1 billion.
So far, total costs for road works on the superhighway have reached Sh27 billion with each of the three lots of the project over 90 percent completed.
Spanning 42 kilometres (km) the Thika superhighway Project will have a 39km footpath and cyclists’ lane.


Lot 1, which is being undertaken by Chinese contractor China Wu Yi Company Limited stretches from Uhuru Highway ending at Muthaiga roundabout.
“The scope of that work includes improvement of Forest Road, Kariokor Road and Murang’a and the connection of the Globe flyover to Tom Mboya,” Matu explained.
Lot 2, under the supervision of Synohydro, is between Muthaiga roundabout and Kenyatta University, about a 14 km distance that is 93 and 94 percent complete, needing basic road furniture, lighting and signage.
Sheng Li engineering, the contractor overseeing completion of Lot 3 the last portion of the road to Thika, has already began construction of foot bridges.
“The bridges at least in our lot will be in the range of Sh20 million each. We are constructing five and the first is almost complete,” Sheng Li Engineer Zeng Xlanmin explained.


In all, there will be approximately 17 footbridges servicing pedestrians from Nairobi to Thika town.

A toll station and weigh bridge are being constructed along the highway in Lot 3 (in Ruiru), which once complete will be operationalised by Parliament.

Although fees are yet to be determined, traditional toll stations charge vehicles by type and in the case of heavy load trucks, the fee is determined by the number of axles, wheels and height of the truck.
The eight-lane highway that has re-written Kenya’s highway rulebook is expected to accommodate 300,000 cars daily.
Even though the temporary speed limit has been set between 30 and 50 kilometres as construction is on-going, Senior Superintendent of Police Leonard Katana said safety will be crucial when the speed limit is increased.


“It’s a good road so let’s not change it into a killer road. Officers will monitor drivers. The speed limit will remain. However in future we will propose to be a bit higher, but we must drive safely,” he said.

Furthermore, Information Permanent Secretary Bitange Ndemo stressed the need for motorist to respect the traffic laws.

“I have driven on Thika road only to see matatus calling for passengers at the centre of the highway; that just means they actually don’t know what a highway is,” he said.

Ndemo said the concept of a highway needs to be properly communicated to Kenyan motorists, requiring Ministry of Transport and relevant government agencies to formulate an aggressive education campaign.

“The Ministry of Transport should announce that it has cancelled all drivers’ licenses until everyone goes for another test on how to use the highway. Otherwise Thika Road will not help,” he asserted.

So far, two sections of the Sh2 million three-level Pangani interchange are operational, servicing Forest Road, Thika Road, Murang’a Road and Ring Road Ngara, as well as the recently opened Muthaiga underpass.

NAIROBI, Kenya, Apr 10 – The completion of the Thika superhighway has been pushed to June.

Several hitches have held back the project, missing both the December 2011 and March 2012 deadlines.

Consulting Engineering firm APEC’s Managing Director Johnson Matu said besides land acquisition issues, heavy rains in the latter part of last year caused unexpected delays.

“We are having an issue with the removal and relocation of service lines, water pipes, power and some have not be relocated, so the contractor was unable to complete the works,” he said.

The relocation process and land acquisition has cost an estimated Sh5 billion, while supervision costs now stand at Sh1 billion.

So far, total costs for road works on the superhighway have reached Sh27 billion with each of the three lots of the project over 90 percent completed.

Spanning 42 kilometres (km) the Thika superhighway Project will have a 39km footpath and cyclists’ lane.

Lot 1, which is being undertaken by Chinese contractor China Wu Yi Company Limited stretches from Uhuru Highway ending at Muthaiga roundabout.

“The scope of that work includes improvement of Forest Road, Kariokor Road and Murang’a and the connection of the Globe flyover to Tom Mboya,” Matu explained.

Lot 2, under the supervision of Synohydro, is between Muthaiga roundabout and Kenyatta University, about a 14 km distance that is 93 and 94 percent complete, needing basic road furniture, lighting and signage.

Sheng Li engineering, the contractor overseeing completion of Lot 3 the last portion of the road to Thika, has already began construction of foot bridges.

“The bridges at least in our lot will be in the range of Sh20 million each. We are constructing five and the first is almost complete,” Sheng Li Engineer Zeng Xlanmin explained.

In all, there will be approximately 17 footbridges servicing pedestrians from Nairobi to Thika town.

A toll station and weigh bridge are being constructed along the highway in Lot 3 (in Ruiru), which once complete will be operationalised by Parliament.

Although fees are yet to be determined, traditional toll stations charge vehicles by type and in the case of heavy load trucks, the fee is determined by the number of axles, wheels and height of the truck.

The eight-lane highway that has re-written Kenya’s highway rulebook is expected to accommodate 300,000 cars daily.

Even though the temporary speed limit has been set between 30 and 50 kilometres as construction is on-going, Senior Superintendent of Police Leonard Katana said safety will be crucial when the speed limit is increased.

“It’s a good road so let’s not change it into a killer road. Officers will monitor drivers.

The speed limit will remain. However in future we will propose to be a bit higher, but we must drive safely,” he said.

Furthermore, Information Permanent Secretary Bitange Ndemo stressed the need for motorist to respect the traffic laws.

“I have driven on Thika road only to see matatus calling for passengers at the centre of the highway; that just means they actually don’t know what a highway is,” he said.

Ndemo said the concept of a highway needs to be properly communicated to Kenyan motorists, requiring Ministry of Transport and relevant government agencies to formulate an aggressive education campaign.

“The Ministry of Transport should announce that it has cancelled all drivers’ licenses until everyone goes for another test on how to use the highway. Otherwise Thika Road will not help,” he asserted.

So far, two sections of the Sh2 million three-level Pangani interchange are operational, servicing Forest Road, Thika Road, Murang’a Road and Ring Road Ngara, as well as the recently opened
Muthaiga underpass.


Thika superhighway completion set for June - Capital Business

MY TAKE

The funny thing that 39km footpath and cyclists’ lane was never built.
It’s clear you have never been to Kenya or thika road cause everyone who has been knows there is a footpath and a cyclist lane for the whole strech


Look at the shoulders on the sides where people are walking

6fdf1b96-b54e-4a5d-90ac-a327dee04ea4-jpeg.978171
04922ed0-6688-4513-ab94-a34aa39c90df-jpeg.978172
be9ea91c-c470-49df-b6d1-696f3fc4c245-png.978173
68e62eed-923a-4a3a-8c6b-b1af388b06f0-jpeg.978174
09571fec-022c-42cf-bedd-bc734cc91f5d-jpeg.978175
 
Kafrican

Kafrican

JF-Expert Member
Joined
Jan 26, 2015
Messages
4,164
Likes
3,621
Points
280
Kafrican

Kafrican

JF-Expert Member
Joined Jan 26, 2015
4,164 3,621 280
Mwonekano wa Upanuzi na Ujenzi wa barabara ya Morogoro kuanzia Kimara- Kibaha yenye urefu wa KM 19.2 itakayokuwa na njia 8


Huo mchoro wa overpass yenu umeshindwa na hizi picha za kikweli za thika road

6c67bcf5-694a-42ca-9300-41905b9dee08-jpeg.978176
 
Dhuks

Dhuks

JF-Expert Member
Joined
Mar 15, 2012
Messages
1,577
Likes
427
Points
180
Dhuks

Dhuks

JF-Expert Member
Joined Mar 15, 2012
1,577 427 180
The highway is 40 km!
Numbers are not your strongest forte so let me help you. The Highway project covered 50km which is the 45km direct road connection and the additional kilometers in improving the other two nodes that access it from Nairobi. It can be accessed from Waiyaki way, Tom Mboya street and Kariokor area. Kando na hayo, Thika road yote ni 62 km
thika-rd-png.978499
thika-png.978500
 
Geza Ulole

Geza Ulole

JF-Expert Member
Joined
Oct 31, 2009
Messages
17,226
Likes
9,775
Points
280
Geza Ulole

Geza Ulole

JF-Expert Member
Joined Oct 31, 2009
17,226 9,775 280
Numbers are not your strongest forte so let me help you. The Highway project covered 50km which is the 45km direct road connection and the additional kilometers in improving the other two nodes that access it from Nairobi. It can be accessed from Waiyaki way, Tom Mboya street and Kariokor area. Kando na hayo, Thika road yote ni 62 km View attachment 978499 View attachment 978500
Sipendi kuzozana na Wapumbavu !


Thika superhighway completion set for June
Spanning 42km the Thika superhighway Project will have a 39km footpath and cyclists’ lane/FILE




NAIROBI, Kenya, Apr 10 – The completion of the Thika superhighway has been pushed to June.

Several hitches have held back the project, missing both the December 2011 and March 2012 deadlines.

Consulting Engineering firm APEC’s Managing Director Johnson Matu said besides land acquisition issues, heavy rains in the latter part of last year caused unexpected delays.

“We are having an issue with the removal and relocation of service lines, water pipes, power and some have not be relocated, so the contractor was unable to complete the works,” he said.

The relocation process and land acquisition has cost an estimated Sh5 billion, while supervision costs now stand at Sh1 billion.

So far, total costs for road works on the superhighway have reached Sh27 billion with each of the three lots of the project over 90 percent completed.

Spanning 42 kilometres (km) the Thika superhighway Project will have a 39km footpath and cyclists’ lane.

Lot 1, which is being undertaken by Chinese contractor China Wu Yi Company Limited stretches from Uhuru Highway ending at Muthaiga roundabout.

“The scope of that work includes improvement of Forest Road, Kariokor Road and Murang’a and the connection of the Globe flyover to Tom Mboya,” Matu explained.

Lot 2, under the supervision of Synohydro, is between Muthaiga roundabout and Kenyatta University, about a 14 km distance that is 93 and 94 percent complete, needing basic road furniture, lighting and signage.

Sheng Li engineering, the contractor overseeing completion of Lot 3 the last portion of the road to Thika, has already began construction of foot bridges.

“The bridges at least in our lot will be in the range of Sh20 million each. We are constructing five and the first is almost complete,” Sheng Li Engineer Zeng Xlanmin explained.

In all, there will be approximately 17 footbridges servicing pedestrians from Nairobi to Thika town.

A toll station and weigh bridge are being constructed along the highway in Lot 3 (in Ruiru), which once complete will be operationalised by Parliament.

Although fees are yet to be determined, traditional toll stations charge vehicles by type and in the case of heavy load trucks, the fee is determined by the number of axles, wheels and height of the truck.

The eight-lane highway that has re-written Kenya’s highway rulebook is expected to accommodate 300,000 cars daily.

Even though the temporary speed limit has been set between 30 and 50 kilometres as construction is on-going, Senior Superintendent of Police Leonard Katana said safety will be crucial when the speed limit is increased.

“It’s a good road so let’s not change it into a killer road. Officers will monitor drivers.

The speed limit will remain. However in future we will propose to be a bit higher, but we must drive safely,” he said.

Furthermore, Information Permanent Secretary Bitange Ndemo stressed the need for motorist to respect the traffic laws.

“I have driven on Thika road only to see matatus calling for passengers at the centre of the highway; that just means they actually don’t know what a highway is,” he said.

Ndemo said the concept of a highway needs to be properly communicated to Kenyan motorists, requiring Ministry of Transport and relevant government agencies to formulate an aggressive education campaign.

“The Ministry of Transport should announce that it has cancelled all drivers’ licenses until everyone goes for another test on how to use the highway. Otherwise Thika Road will not help,” he asserted.

So far, two sections of the Sh2 million three-level Pangani interchange are operational, servicing Forest Road, Thika Road, Murang’a Road and Ring Road Ngara, as well as the recently opened
Muthaiga underpass.


Thika superhighway completion set for June - Capital Business

MY TAKE

The funny thing that 39km footpath and cyclists’ lane was never built.
 
NairobiWalker

NairobiWalker

JF-Expert Member
Joined
Oct 31, 2012
Messages
4,325
Likes
2,740
Points
280
NairobiWalker

NairobiWalker

JF-Expert Member
Joined Oct 31, 2012
4,325 2,740 280
The way alivyo Magufuli hiyo ni sample tu, akiipenda utasikia "si waendelee tu mpaka Chato". Of course in his voice.
Hello my baby, I see you're back.😎😎
 
L

LexPaulsen

Member
Joined
Jul 30, 2018
Messages
16
Likes
23
Points
5
L

LexPaulsen

Member
Joined Jul 30, 2018
16 23 5
Magufuli is on another level, Even if you personally hate him, you cannot argue with his infrastructure development projects.
In just 3 years, he has done what kibaki and Uhuru have done in 20 years. Its almost impossible to count the number of projects he is doing, from SGR, superhighways, airports, ATCL planes, Bagamoyo, Crude pipeline, gas pipeline, mega bridges,mega hydro dams
Huyu Mzee angozwe angalau miaka zingine 10 hivi
Our president Magufuli is doing a very good job but not flawless. And please stop embarassing us Tanzanians with that nonsense that we add him another 10years, its this backward thoughts like yours that we need to scrap in our motherland if we are to overtake our neighbor Kenya.

Sent using Jamii Forums mobile app
 
mwaswast

mwaswast

JF-Expert Member
Joined
May 12, 2014
Messages
8,487
Likes
3,316
Points
280
mwaswast

mwaswast

JF-Expert Member
Joined May 12, 2014
8,487 3,316 280
19km ambayo haijaanza ni sawa na the old Thika road highway ama Uhuru highway hata Outering ni too much for Tanzagiza.
 
N

ndughuri msuya

JF-Expert Member
Joined
Feb 29, 2012
Messages
360
Likes
200
Points
60
N

ndughuri msuya

JF-Expert Member
Joined Feb 29, 2012
360 200 60
Lol....'.tunajenga kwa pesa zetu'
Watu wanatawaliwa kama kondoo. Eti hamkopi na hivi majuzi mlisamehewa deni Mara ya tatu.
hii ni geuri ya mtanzania pesa anayo na anafanya
ile anapenda
Tanzagiza inaongoza kwa umasikini EAC na SADC yani hata Sudan Kusini, Somalia na Burundi wapo nafuu. Uganda waliunda express way yao na hawaringi ila majamaa wanapiga kelele na bado haijakamilika.
masikini jeuri analisha hata tajiri chakupewa:D:D:D
 
tuusan

tuusan

JF-Expert Member
Joined
Jun 30, 2016
Messages
8,830
Likes
6,210
Points
280
Age
28
tuusan

tuusan

JF-Expert Member
Joined Jun 30, 2016
8,830 6,210 280
19km ambayo haijaanza ni sawa na the old Thika road highway ama Uhuru highway hata Outering ni too much for Tanzagiza.
Haijaanza kivipi...wameshachimba kutoka kimara mwisho hadi mbezi..wanaendelea hadi kibaha...tatizo lenu hua hamuamini

Sent using Jamii Forums mobile app
 