Look at South Africa, US, Brazil, China, Morocco, Algeria .
Look at how Addis is starting to look, look at Abidjan.
This highway will change Nairobi for ever. I hope it wont be the only highway in the future sisi raisi anabwabaja pumba na kuuza sura kwenye TV
Location: Kenyatta University (KU) - Thika
Distance: 23.9km
Contractor: Sheng Li Engineering Construction Co.
Cost: 9.4 Billion
Percentage Done: 26%
Lot 3 is the longest in terms of overall road length and it involves less construction of complex interchanges. As of now most of the overpasses that were to replace all roundabouts are complete so whats remaining is the road itself.The project is fully in Central Province starting at the border of Nairobi Province to Central Province and ending in Thika.
The Major works on this section include:
1. Widening the dual carriage way from KU to 6 lanes upto Juja.
2. Construction of a standard 4 lane road with paved shoulders from Juja till Thika.
3. Construction of a 6 lane overpass at the Bypass section and provision of service roads and footpaths.
4. Street Lighting and Junction improvements.
5. Storm drains.
6. Road Markings and Highway Signage.
7. Construction of 3 Railway Bridges.
8. Construction of Flyovers at places which had roundabouts.
Mnaona? wenzetu hawaongei hawana perepere wanafanya mambo.....
wazee hii ni nairobi-thika road project alafu si mnajua wenzetu hawategemei hata senti toka kwa wafadhili?
Look at how Addis is starting to look, look at Abidjan.
This highway will change Nairobi for ever. I hope it wont be the only highway in the future sisi raisi anabwabaja pumba na kuuza sura kwenye TV
Location: Kenyatta University (KU) - Thika
Distance: 23.9km
Contractor: Sheng Li Engineering Construction Co.
Cost: 9.4 Billion
Percentage Done: 26%
Lot 3 is the longest in terms of overall road length and it involves less construction of complex interchanges. As of now most of the overpasses that were to replace all roundabouts are complete so whats remaining is the road itself.The project is fully in Central Province starting at the border of Nairobi Province to Central Province and ending in Thika.
The Major works on this section include:
1. Widening the dual carriage way from KU to 6 lanes upto Juja.
2. Construction of a standard 4 lane road with paved shoulders from Juja till Thika.
3. Construction of a 6 lane overpass at the Bypass section and provision of service roads and footpaths.
4. Street Lighting and Junction improvements.
5. Storm drains.
6. Road Markings and Highway Signage.
7. Construction of 3 Railway Bridges.
8. Construction of Flyovers at places which had roundabouts.
Mnaona? wenzetu hawaongei hawana perepere wanafanya mambo.....
wazee hii ni nairobi-thika road project alafu si mnajua wenzetu hawategemei hata senti toka kwa wafadhili?