The New Julius Nyerere International Airport Terminal 3


game over

game over

JF-Expert Member
Joined
Jan 1, 2016
Messages
4,862
Points
2,000
Age
49
game over

game over

JF-Expert Member
Joined Jan 1, 2016
4,862 2,000
Capacity
7mn pax annually,

Plus 3mn pax in Terminal 2,

Plus 500 in Terminal 1,

Total capacity 10mn pax capacity Annual passengers,

The Largest Airport Terminal in East and Central Africa
 
BlietzKrieg

BlietzKrieg

JF-Expert Member
Joined
Mar 9, 2017
Messages
1,556
Points
2,000
BlietzKrieg

BlietzKrieg

JF-Expert Member
Joined Mar 9, 2017
1,556 2,000
Capacity
7mn pax annually,

Plus 3mn pax in Terminal 2,

Plus 500 in Terminal 1,

Total capacity 10mn pax capacity Annual passengers,

The Largest Airport Terminal in East and Central Africa
Hahaha but it handles less than 3million.
 
tuusan

tuusan

JF-Expert Member
Joined
Jun 30, 2016
Messages
9,673
Points
2,000
Age
28
tuusan

tuusan

JF-Expert Member
Joined Jun 30, 2016
9,673 2,000
Capacity
7mn pax annually,

Plus 3mn pax in Terminal 2,

Plus 500 in Terminal 1,

Total capacity 10mn pax capacity Annual passengers,

The Largest Airport Terminal in East and Central Africa
Kufikia full capacity itachukua muda ,jitihada zifanyike kuwavutia wageni wengi kuja kutalii ,Na kuongeza uwezo wa shirika letu ili domestic flight nazo ziongezeke cause watu hukosa ticket sometimes. ...

Ingefaa zaidi waongeze pia KIA Ambayo hupata wageni wengi sana wanaoenda mbugani na kupanda mlima...

Napongeza jitihada zilizofanyika kufikia hatua hyo, kazi nzuri inatia moyo sana
 
K

kennedy0000

JF-Expert Member
Joined
Apr 14, 2012
Messages
2,753
Points
2,000
K

kennedy0000

JF-Expert Member
Joined Apr 14, 2012
2,753 2,000
You had a chance to design a new terminal from scratch, and you came up with such an ugly thing? 😂 😂 😂 😂 Apart from the exterior glass, inside it looks like a terminal from the 80s.
Can't even compare with Nairobi SGR.

This is how serious airports are building their new terminals.

air1-jpg.1097902


air2-jpg.1097903


air3-jpg.1097904


air4-jpg.1097905


air5-jpg.1097906


air6-jpg.1097907
 
K

kennedy0000

JF-Expert Member
Joined
Apr 14, 2012
Messages
2,753
Points
2,000
K

kennedy0000

JF-Expert Member
Joined Apr 14, 2012
2,753 2,000
Capacity
7mn pax annually,

Plus 3mn pax in Terminal 2,

Plus 500 in Terminal 1,

Total capacity 10mn pax capacity Annual passengers,

The Largest Airport Terminal in East and Central Africa
Congratulations to your government for being forward thinking.
Instead of having to build another terminal in 5 years, they built one that will reach capacity in 50 years. 😂😂
 
Oii

Oii

JF-Expert Member
Joined
Sep 8, 2017
Messages
2,394
Points
2,000
Oii

Oii

JF-Expert Member
Joined Sep 8, 2017
2,394 2,000
game over

game over

JF-Expert Member
Joined
Jan 1, 2016
Messages
4,862
Points
2,000
Age
49
game over

game over

JF-Expert Member
Joined Jan 1, 2016
4,862 2,000
You had a chance to design a new terminal from scratch, and you came up with such an ugly thing? Apart from the exterior glass, inside it looks like a terminal from the 80s.
Can't even compare with Nairobi SGR.

This is how serious airports are building their new terminals.

View attachment 1097902

View attachment 1097903

View attachment 1097904

View attachment 1097905

View attachment 1097906

View attachment 1097907
Hii ya uturuki ni world’s Largest Airport,
Leave it, Lete ya Kenya tuone
 
T

Tz_one

JF-Expert Member
Joined
Jun 6, 2017
Messages
1,006
Points
2,000
T

Tz_one

JF-Expert Member
Joined Jun 6, 2017
1,006 2,000
Kufikia full capacity itachukua muda ,jitihada zifanyike kuwavutia wageni wengi kuja kutalii ,Na kuongeza uwezo wa shirika letu ili domestic flight nazo ziongezeke cause watu hukosa ticket sometimes. ...

Ingefaa zaidi waongeze pia KIA Ambayo hupata wageni wengi sana wanaoenda mbugani na kupanda mlima...

Napongeza jitihada zilizofanyika kufikia hatua hyo, kazi nzuri inatia moyo sana
KIA imepanuliwa just last Year...we need Mwanza expansion na Good cargo terminal..na Mbeya expansion na Good cargo terminal ..itakuwa ni rahisi kwa Cargo planes kutua Mbeya na Mwanza ..na kuchukua Matunda ,Mboga na Samaki..Nakua mwanza wanajenga cargo terminal
 
much know

much know

JF-Expert Member
Joined
Oct 22, 2017
Messages
2,327
Points
2,000
much know

much know

JF-Expert Member
Joined Oct 22, 2017
2,327 2,000
Congratulations to your government for being forward thinking.
Instead of having to build another terminal in 5 years, they built one that will reach capacity in 50 years.
Duuu naona unauchugu zaidi ya mwanamke anayetaka kujifungua.
 
K

kennedy0000

JF-Expert Member
Joined
Apr 14, 2012
Messages
2,753
Points
2,000
K

kennedy0000

JF-Expert Member
Joined Apr 14, 2012
2,753 2,000
Leta ya kenya buda, hata mchoro tu.
Tafuta michoro ya Greenfield JKIA. 100 times better than that shack you've constructed.
The designs and plans are ready. When the traffic numbers necessitate its construction, things will move fast.
 
K

kennedy0000

JF-Expert Member
Joined
Apr 14, 2012
Messages
2,753
Points
2,000
K

kennedy0000

JF-Expert Member
Joined Apr 14, 2012
2,753 2,000
Leta ya kenya buda, hata mchoro tu.
Mimi siongei kuhusu size. Naongea kuhusu kuvutia kwake.
Old JKIA looks almost better than what you've build in 2019.
 
tuusan

tuusan

JF-Expert Member
Joined
Jun 30, 2016
Messages
9,673
Points
2,000
Age
28
tuusan

tuusan

JF-Expert Member
Joined Jun 30, 2016
9,673 2,000
You had a chance to design a new terminal from scratch, and you came up with such an ugly thing? Apart from the exterior glass, inside it looks like a terminal from the 80s.
Can't even compare with Nairobi SGR.

This is how serious airports are building their new terminals.

View attachment 1097902

View attachment 1097903

View attachment 1097904

View attachment 1097905

View attachment 1097906

View attachment 1097907
Ungeweka yenu acha kushadadia ya instabul
 

Forum statistics

Threads 1,296,167
Members 498,559
Posts 31,237,004
Top