ZOMBA: 11,154 KM Ziko wapi ndugu yangu!

Kibanga Ampiga Mkoloni

JF-Expert Member
Aug 9, 2007
18,697
8,843
President Jakaya Kikwete said in Arusha on Thursday that at the moment the total length of tarmacked roads in Tanzania is 6,000 kilometres. The president was officially opening the 47th African Development Bank (AfDB) meeting when he said this. "Tanzania has a total road network that covers 80,000 kilometres.
However, there is a need to reduce the length of unpaved roads," he said. He added that there are ongoing efforts to pave 11,000 kilometres of the road network -- a job that is expected to be completed in three years' time. After construction projects are completed in 2015 the total length of paved roads will increase from 6,000 to 17,000 kilometres.
Source: Tanzania Daily News.
Fanya tena hesabu upya

Hii ndio janja mpya ya Magufuri na CCM waliyo kujanayo ya kuweka wakandarasi site wakati hela hakuna, kinachofanyika sasa ni kupeka wakandarasi site na kuanza kuzuga hapo huku siku zina enda ukiuliza utaambiwa ujenzi unaendelea na ndio maana vilio vimekuw avingi sana bungeni kuwa wakandarasi hawalipwi .

Ikumbukwe kumbeleka Mkandarasi site hata 5Bilioni inatosha, na ndio maann juzi MKOSAMALI alipolalamika kuw ahela azitoshi kwa ujenzi wa barabara magufuli alimuambiwa kuwa zinatoisha sana , kwani kitakachofanyika ni kumpa mkandarasi 6 Bilion afanye mobilisation ambayo itafanyika kwa mwaka mzima, pia kumbuka ili mkandarasi alipwe ina bidi afanyekazi ndio apeleke madai ambayo kulipwa kwake ni mpaka bajeti ijayo ya mwakani kama ilivyofanyika mwezi huu 300 Bilioni zimelipwa kwa Certificate za sikunyingisana zingine ni za mwaka jana. na kuna mbunge wa DAR aliuliza ni ngapi zipo mezani kwa magufuli zinangoja malipo, alijibu kuwa ni 50+ Bilion , mimi na mini kuna zaidi ya hizo bado zinasubiri malipo mezani kwa magufuli ila hela hakuna.

Kuna bara bara nyingi san zime simama mfano ni hile ya kwenda kwao KIKWETE ya bagamoyo iliyo chini ya mkandarasi RZ1, Ya Kilosa,Turiani zote hizi zime simama kitambo kw akuw ahela hakuna.




Zomba umekuwa ukinandi sana kuwa JK kajenga km 11,154, Je unaweza kunionyesha ziko wapi? na kajenga kwa hela ipi? Maana si mchezo hizi kwa gharama.
SHUKURU KAWAMBWA hii ni sawa na 11,154 x 1.2 Bilion = 13.3 Trilion.
MAGUFULI hi ni sawa na 11,154 x 0.8 Bilion = 8.9 Trilion.


Kwa mujibu wa Tanroads: http://www.tanroads.org/#

Classified Road Network
The total classified road network in Tanzania Mainland is estimated to be 86,472 km based on the Road Act 2007. The Ministry of Works through TANROADS is managing the National road network of about 33,891 km comprising 12,786 km of Trunk and 21,105 km of Regional roads. The remaining network of about 53,460 km of Urban, District and Feeder Roads is under the responsibility of the Prime Minister's Office Regional Administration and Local Government (PMO-RALG). The National Road Network
The National Road Network consists of:

  • Trunk roads 12,786 km out of which 5,130 km are paved and 7,656 km are unpaved.
  • Regional Roads: 21,105 km out of which 840 km are paved and 20,265 km are unpaved.



Tanzania Road Network Length (km)
Road Class
Paved (km)
Unpaved
Total
%Paved
Trunk Roads
5,478​
7,308​
12,786​
43​
Regional Roads
840​
20,265​
21,105​
4​
District, Urban, Feeder, Roads
774​
51,807​
52,581​
1.5​
TOTAL
7,092
79,380
86,472
9

Mbona ni 7,092 tu?

map.jpg
 
Huenda walikuwa wakimaanisha yale mambo ya spot improvement kwa kutumia changarawe mkuu!
 
Mkuu Kibanga acha na huyu jamaa ni mdini sana halafu amekaririshwa na magufuli ndio analeta hapa jamvin Hebu muulize ni lini Kigoma itabadilika iwe dubai kwasababu hata maandalizi bado miaka miwili na nusu itatosha kweli?
 
Zomba umekuwa ukinandi sana kuwa JK kajenga km 11,154, Je unaweza kunionyesha ziko wapi? na kajenga kwa hela ipi? Maana si mchezo hizi kwa gharama.
SHUKURU KAWAMBWA hii ni sawa na 11,154 x 1.2 Bilion = 13.3 Trilion.
MAGUFULI hi ni sawa na 11,154 x 0.8 Bilion = 8.9 Trilion.

zomba ni nani?
 
Last edited by a moderator:
Huenda walikuwa wakimaanisha yale mambo ya spot improvement kwa kutumia changarawe mkuu!

Sitaki kuamini hivyo kwa vyovyote anahoja nzuri tu!
Ngoja jae hapa!

Mkuu Kibanga acha na huyu jamaa ni mdini sana halafu amekaririshwa na magufuli ndio analeta hapa jamvin Hebu muulize ni lini Kigoma itabadilika iwe dubai kwasababu hata maandalizi bado miaka miwili na nusu itatosha kweli?

Hapana kaka sio vizuri kumuacha mtu kama huyu, Ni vizuri kujadiliana naye na kuelimishana, hana udini, by the way ni MUISLAM mwenzangu kwahiyo aiswii kumuacha apotee.
 
Hapana kaka sio vizuri kumuacha mtu kama huyu, Ni vizuri kujadiliana naye na kuelimishana, hana udini, by the way ni MUISLAM mwenzangu kwahiyo aiswii kumuacha apotee.
Mkuu huyu jamaa anakesha kwenye mtandao yeye yupo kazini huwa analipwa kwa hili analolifanya sasa kama unataka abadilike maana yake unataka aache kazi
 
  • Trunk roads 12,786 km out of which 5,130 km are paved and 7,656 km are unpaved.
  • Regional Roads: 21,105 km out of which 840 km are paved and 20,265 km are unpaved.

Mbona ni 5,970 tu?
Kweli mkuu!.
Lakini sijaelewa, hizo zote hizi zimejengwa katika uongozi wa Baba Mwanaasha peke yake?.
 
Kweli mkuu!.
Lakini sijaelewa, hizo zote hizi zimejengwa katika uongozi wa Baba Mwanaasha peke yake?.

KAKA CHAMBUA MWENYEWE HAPO MIMI SITAKI UNAFIKI.
[h=1]Completed Projects[/h]
NO:
PROJECT NAME
LENGTH (KM)
COST
COMMENCEMENT DATE
COMPLETION DATE
CONTRACTOR
FINANCIER
1​
TINDE - MWANZA/SHY BOARDER (Shinyanga)​
96.0​
53.23​
11-Feb-04​
30-June-2007​
GRENAKER LTA​
EU/GOT​
2​
NZEGA - TINDE - ISAKA (Shinyanga)​
73.0​
41.55​
26-May-04​
24-May-2007​
GRENAKER LTA​
EU/GOT​
3​
BACKLOG MAINTENANCE OF MOROGORO - DODOMA ROAD (Morogoro)​
256.0​
EU 42.5MIL​
29-Jun-2004​
30-Jun-2007​
NCC INTERNATIONAL DENMARK A/S​
EU/GOT​
4​
MKURANGA - KIBITI (Coast)​
60.0​
17.52​
July- 2003​
2008​
INHOUSE​
OPEC/GOT​
5​
PACKAGE 1: SINGIDA - IGUGUNO (Singida)​
34.0​
19.35​
23-May-05​
19-Oct-2008​
CHICO​
IDA & GOT​
6​
PACKAGE 2: IGUGUNO - SEKENKE (Singida)​
42.0​
14.44​
12-May-05​
11-Nov-2007​
CHICO​
IDA & GOT​
7​
PACKAGE 3: SEKENKE - SHELUI (Singida)​
33.0​
20.61​
11-Feb-05​
10-Feb-2007​
CHICO​
IDA & GOT​
8​
ROMBO MKUU - TARAKEA (Kilimanjaro)​
32.0​
15.78​
14-Sept-2006​
13-Apr-2009​
GENERAL NILE -DOTT JV​
BADEA/GOT​
9​
SHELUI - NZEGA​
(Tabora)​
112.0​
20.723​
8-Apr-2002​
08-Oct-2005​
CHINA GEO​
ADB/GOT​
10​
MASASI - MANGAKA PHASE I (Mtwara)​
15.0​
6.8​
2/11/2007​
31-Mar-2009​
TOKURA CORPORATION​
JICA & GOT​
11​
MASASI – MANGAKA PHASE II (Mtwara)​
17.6​
11.4​
28/11/2008​
31-Mar-2010​
TOKURA CORPORATION​
JICA/GOT​
12​
DODOMA - MANYONI​
127.0​
103.40​
1-Apr-03​
11-Sep-2009​
KONOIKE CONSTR. CO. LTD / ESTIM​
GOT​
13​
ISUNA - SINGIDA (Singida)​
63.0​
30.42​
14-Feb-03​
02-July-2008​
SIETCO​
GOT​
14​
MBWEMKURU - MINGOYO (Lindi)​
95.0​
51.49​
25-Feb-03​
10-Dec-2007​
M.A KHARAFI & SONS​
GOT​
15​
NANGURUKURU - MBWEMKURU* (Lindi0​
95.0​
39.24​
25-Feb-03​
25-Jan-2008​
CICO​
GOT*​
16​
TARAKEA - RONGAI - KAMWANGA (Kilimanajro)​
32.0​
14.42​
25-Oct-04​
2-Mar-2007​
SIETCO​
GOT​
17​
UNITY BRIDGE and Approach roads (Mtwara)​
10.7​
24.55​
10-Nov-05​
10-Nov-2008​
CHINA GEO ENGINEERING​
GOT​
18​
KYAMYORWA - BUZIRAYOMBO (Kagera)​
120.0​
49.13​
10-Feb-05​
9 - February -2008​
CHINA GEO ENGINEERING​
GOT​
19​
SENGEREMA - USAGARA​
40.0​
35.786​
07-Jan- 2008​
07-Aug-2010​
SINOHYDRO​
GOT​
20​
MANYONI-ISUNA​
54.0​
30.24​
07-Jan-2007​
07-Jan-2011​
CHINA GEO ENGINEERING​
GOT​
21​
MWANDIGA-MANYOVU​
60.0​
53.600​
05-Aug-2008​
31/Oct/2010​
CHICO​
GOT​
22​
NELSON MAMNDELA​
15.6​
41.222​
01-Oct-2007​
21-july-2011​
MSS Jv​
EU​
23​
KIGOMA-KIDAHWE​
35.7​
32.543​
12-Jun-2008​
08-June-2010​
CHICO​
GOT​
24​
MASASI-MANGAKA PHASE II​
17.6​
11.400​
28-Nov-2008​
31-Mar-2010​
TOKURA​
JAPAN/GOT​
25​
KILWA ROAD PHASE II​
5.1​
15.780​
13-Apr-2008​
30-Sept-2009​
KAJIMA​
JAPAN/GOT​
26​
BUZIRAYOMBO-GEITA(MWANZA)​
100.0​
41.14​
10-Feb-2005​
31-Jan -2008​
SINOHYDRO​
GOT​
27​
SAM NUJOMA(DSM)​
4.0​
12.97​
08-Jun-2006​
07-Apr-2008​
CHIKO​
GOT​
28​
RUVU BRIDGE​
(COAST)​
4.43​
18-May-2006​
09-Oct-2008​
CHINA HENAN​
GOT​
29​
GEITA-SENGEREMA​
50​
39.592​
01-Feb-2008​
31-Jan-2010​
SINOHYDRO​
GOT​
GRAND TOTAL1741.824913.309
 
achana nae ni mke mdogo wa makufuli .....eti ukipeleka barabara za tz rwanda watakosa mahali pa kulima
 
KAKA CHAMBUA MWENYEWE HAPO MIMI SITAKI UNAFIKI.
Completed Projects

NO:
PROJECT NAME
LENGTH (KM)
COST
COMMENCEMENT DATE
COMPLETION DATE
CONTRACTOR
FINANCIER
1​
TINDE - MWANZA/SHY BOARDER (Shinyanga)​
96.0​
53.23​
11-Feb-04​
30-June-2007​
GRENAKER LTA​
EU/GOT​
2​
NZEGA - TINDE - ISAKA (Shinyanga)​
73.0​
41.55​
26-May-04​
24-May-2007​
GRENAKER LTA​
EU/GOT​
3​
BACKLOG MAINTENANCE OF MOROGORO - DODOMA ROAD (Morogoro)​
256.0​
EU 42.5MIL​
29-Jun-2004​
30-Jun-2007​
NCC INTERNATIONAL DENMARK A/S​
EU/GOT​
4​
MKURANGA - KIBITI (Coast)​
60.0​
17.52​
July- 2003​
2008​
INHOUSE​
OPEC/GOT​
5​
PACKAGE 1: SINGIDA - IGUGUNO (Singida)​
34.0​
19.35​
23-May-05​
19-Oct-2008​
CHICO​
IDA & GOT​
6​
PACKAGE 2: IGUGUNO - SEKENKE (Singida)​
42.0​
14.44​
12-May-05​
11-Nov-2007​
CHICO​
IDA & GOT​
7​
PACKAGE 3: SEKENKE - SHELUI (Singida)​
33.0​
20.61​
11-Feb-05​
10-Feb-2007​
CHICO​
IDA & GOT​
8​
ROMBO MKUU - TARAKEA (Kilimanjaro)​
32.0​
15.78​
14-Sept-2006​
13-Apr-2009​
GENERAL NILE -DOTT JV​
BADEA/GOT​
9​
SHELUI - NZEGA​
(Tabora)​
112.0​
20.723​
8-Apr-2002​
08-Oct-2005​
CHINA GEO​
ADB/GOT​
10​
MASASI - MANGAKA PHASE I (Mtwara)​
15.0​
6.8​
2/11/2007​
31-Mar-2009​
TOKURA CORPORATION​
JICA & GOT​
11​
MASASI – MANGAKA PHASE II (Mtwara)​
17.6​
11.4​
28/11/2008​
31-Mar-2010​
TOKURA CORPORATION​
JICA/GOT​
12​
DODOMA - MANYONI​
127.0​
103.40​
1-Apr-03​
11-Sep-2009​
KONOIKE CONSTR. CO. LTD / ESTIM​
GOT​
13​
ISUNA - SINGIDA (Singida)​
63.0​
30.42​
14-Feb-03​
02-July-2008​
SIETCO​
GOT​
14​
MBWEMKURU - MINGOYO (Lindi)​
95.0​
51.49​
25-Feb-03​
10-Dec-2007​
M.A KHARAFI & SONS​
GOT​
15​
NANGURUKURU - MBWEMKURU* (Lindi0​
95.0​
39.24​
25-Feb-03​
25-Jan-2008​
CICO​
GOT*​
16​
TARAKEA - RONGAI - KAMWANGA (Kilimanajro)​
32.0​
14.42​
25-Oct-04​
2-Mar-2007​
SIETCO​
GOT​
17​
UNITY BRIDGE and Approach roads (Mtwara)​
10.7​
24.55​
10-Nov-05​
10-Nov-2008​
CHINA GEO ENGINEERING​
GOT​
18​
KYAMYORWA - BUZIRAYOMBO (Kagera)​
120.0​
49.13​
10-Feb-05​
9 - February -2008​
CHINA GEO ENGINEERING​
GOT​
19​
SENGEREMA - USAGARA​
40.0​
35.786​
07-Jan- 2008​
07-Aug-2010​
SINOHYDRO​
GOT​
20​
MANYONI-ISUNA​
54.0​
30.24​
07-Jan-2007​
07-Jan-2011​
CHINA GEO ENGINEERING​
GOT​
21​
MWANDIGA-MANYOVU​
60.0​
53.600​
05-Aug-2008​
31/Oct/2010​
CHICO​
GOT​
22​
NELSON MAMNDELA​
15.6​
41.222​
01-Oct-2007​
21-july-2011​
MSS Jv​
EU​
23​
KIGOMA-KIDAHWE​
35.7​
32.543​
12-Jun-2008​
08-June-2010​
CHICO​
GOT​
24​
MASASI-MANGAKA PHASE II​
17.6​
11.400​
28-Nov-2008​
31-Mar-2010​
TOKURA​
JAPAN/GOT​
25​
KILWA ROAD PHASE II​
5.1​
15.780​
13-Apr-2008​
30-Sept-2009​
KAJIMA​
JAPAN/GOT​
26​
BUZIRAYOMBO-GEITA(MWANZA)​
100.0​
41.14​
10-Feb-2005​
31-Jan -2008​
SINOHYDRO​
GOT​
27​
SAM NUJOMA(DSM)​
4.0​
12.97​
08-Jun-2006​
07-Apr-2008​
CHIKO​
GOT​
28​
RUVU BRIDGE​
(COAST)​
4.43​
18-May-2006​
09-Oct-2008​
CHINA HENAN​
GOT​
29​
GEITA-SENGEREMA​
50​
39.592​
01-Feb-2008​
31-Jan-2010​
SINOHYDRO​
GOT​
GRAND TOTAL1741.824913.309
Mkuu hapa lazima zomba anyamaze hapa umeuwa
 
KAKA CHAMBUA MWENYEWE HAPO MIMI SITAKI UNAFIKI.
Completed Projects

NO:
PROJECT NAME
LENGTH (KM)
COST
COMMENCEMENT DATE
COMPLETION DATE
CONTRACTOR
FINANCIER
1​
TINDE - MWANZA/SHY BOARDER (Shinyanga)​
96.0​
53.23​
11-Feb-04​
30-June-2007​
GRENAKER LTA​
EU/GOT​
2​
NZEGA - TINDE - ISAKA (Shinyanga)​
73.0​
41.55​
26-May-04​
24-May-2007​
GRENAKER LTA​
EU/GOT​
3​
BACKLOG MAINTENANCE OF MOROGORO - DODOMA ROAD (Morogoro)​
256.0​
EU 42.5MIL​
29-Jun-2004​
30-Jun-2007​
NCC INTERNATIONAL DENMARK A/S​
EU/GOT​
4​
MKURANGA - KIBITI (Coast)​
60.0​
17.52​
July- 2003​
2008​
INHOUSE​
OPEC/GOT​
5​
PACKAGE 1: SINGIDA - IGUGUNO (Singida)​
34.0​
19.35​
23-May-05​
19-Oct-2008​
CHICO​
IDA & GOT​
6​
PACKAGE 2: IGUGUNO - SEKENKE (Singida)​
42.0​
14.44​
12-May-05​
11-Nov-2007​
CHICO​
IDA & GOT​
7​
PACKAGE 3: SEKENKE - SHELUI (Singida)​
33.0​
20.61​
11-Feb-05​
10-Feb-2007​
CHICO​
IDA & GOT​
8​
ROMBO MKUU - TARAKEA (Kilimanjaro)​
32.0​
15.78​
14-Sept-2006​
13-Apr-2009​
GENERAL NILE -DOTT JV​
BADEA/GOT​
9​
SHELUI - NZEGA​
(Tabora)​
112.0​
20.723​
8-Apr-2002​
08-Oct-2005​
CHINA GEO​
ADB/GOT​
10​
MASASI - MANGAKA PHASE I (Mtwara)​
15.0​
6.8​
2/11/2007​
31-Mar-2009​
TOKURA CORPORATION​
JICA & GOT​
11​
MASASI – MANGAKA PHASE II (Mtwara)​
17.6​
11.4​
28/11/2008​
31-Mar-2010​
TOKURA CORPORATION​
JICA/GOT​
12​
DODOMA - MANYONI​
127.0​
103.40​
1-Apr-03​
11-Sep-2009​
KONOIKE CONSTR. CO. LTD / ESTIM​
GOT​
13​
ISUNA - SINGIDA (Singida)​
63.0​
30.42​
14-Feb-03​
02-July-2008​
SIETCO​
GOT​
14​
MBWEMKURU - MINGOYO (Lindi)​
95.0​
51.49​
25-Feb-03​
10-Dec-2007​
M.A KHARAFI & SONS​
GOT​
15​
NANGURUKURU - MBWEMKURU* (Lindi0​
95.0​
39.24​
25-Feb-03​
25-Jan-2008​
CICO​
GOT*​
16​
TARAKEA - RONGAI - KAMWANGA (Kilimanajro)​
32.0​
14.42​
25-Oct-04​
2-Mar-2007​
SIETCO​
GOT​
17​
UNITY BRIDGE and Approach roads (Mtwara)​
10.7​
24.55​
10-Nov-05​
10-Nov-2008​
CHINA GEO ENGINEERING​
GOT​
18​
KYAMYORWA - BUZIRAYOMBO (Kagera)​
120.0​
49.13​
10-Feb-05​
9 - February -2008​
CHINA GEO ENGINEERING​
GOT​
19​
SENGEREMA - USAGARA​
40.0​
35.786​
07-Jan- 2008​
07-Aug-2010​
SINOHYDRO​
GOT​
20​
MANYONI-ISUNA​
54.0​
30.24​
07-Jan-2007​
07-Jan-2011​
CHINA GEO ENGINEERING​
GOT​
21​
MWANDIGA-MANYOVU​
60.0​
53.600​
05-Aug-2008​
31/Oct/2010​
CHICO​
GOT​
22​
NELSON MAMNDELA​
15.6​
41.222​
01-Oct-2007​
21-july-2011​
MSS Jv​
EU​
23​
KIGOMA-KIDAHWE​
35.7​
32.543​
12-Jun-2008​
08-June-2010​
CHICO​
GOT​
24​
MASASI-MANGAKA PHASE II​
17.6​
11.400​
28-Nov-2008​
31-Mar-2010​
TOKURA​
JAPAN/GOT​
25​
KILWA ROAD PHASE II​
5.1​
15.780​
13-Apr-2008​
30-Sept-2009​
KAJIMA​
JAPAN/GOT​
26​
BUZIRAYOMBO-GEITA(MWANZA)​
100.0​
41.14​
10-Feb-2005​
31-Jan -2008​
SINOHYDRO​
GOT​
27​
SAM NUJOMA(DSM)​
4.0​
12.97​
08-Jun-2006​
07-Apr-2008​
CHIKO​
GOT​
28​
RUVU BRIDGE​
(COAST)​
4.43​
18-May-2006​
09-Oct-2008​
CHINA HENAN​
GOT​
29​
GEITA-SENGEREMA​
50​
39.592​
01-Feb-2008​
31-Jan-2010​
SINOHYDRO​
GOT​
GRAND TOTAL1741.824913.309
Mkuu hapa lazima zomba anyamaze hapa umeuwa
 
Mkuu hapa lazima zomba anyamaze hapa umeuwa

Kwanza mwambie akueleze hizo takwimu zimekuwa updated lini? ukipata jibu nifahamishe, maana nyie mna data za zamaaaani, mimi nna data zilizowasilishwa bungeni juzi na Magufuli. Kinaga Ubaga na hakuna Mbunge hata mmoja aliyezipinga, si wa CCM si wa Magwanda.
 
don't take zoba bin zombie seriously, this guy think m.kwere and apparently his fellow islamists can do no wrong..such complex bigotry can never be overturned, coz it is a combination of stupidity+ignorance+false zealotry +delusion+...<jaza mwenyewe>
 