Cost comparison SGR Kenya vs SGR Tanzania


Geza Ulole

Geza Ulole

JF-Expert Member
Joined
Oct 31, 2009
Messages
16,509
Likes
8,818
Points
280
Geza Ulole

Geza Ulole

JF-Expert Member
Joined Oct 31, 2009
16,509 8,818 280
Tanzania secures $7.6 billion financing deal from Chinese lender to build new railway
chinese+pic.jpg

President John Magufuli with China Exim Bank president Liu Liang after holding talks at Chamwino State Lodge in Dodoma this week. PHOTO | COURTESY

In Summary

  • Dar es Salaam is positioning itself as a regional hub, upgrading its port to attract more business from its neighbouring landlocked countries.
  • The EAC railways master plan incorporates the standard gauge railway’s Northern and Central Corridors, which are both commercially viable for landlocked countries in the region as they give them strategic access to the ports of Mombasa and Dar es Salaam.
  • The Northern Corridor Integration Projects championed by Rwanda, Kenya and Uganda spearheaded the establishment of a railway link from Mombasa to Kigali.
  • In June 2013, a Northern Corridor Integration Projects Heads of State Summit held in Kampala put in place mechanisms for fast-tracking the development of the SGR.


Tanzania has secured a $7.6 billion loan from China’s Export-Import Bank (Exim) for the construction of a railway line that will link it with Burundi, Rwanda and Democratic Republic of Congo.

President John Magufuli secured the concessional loan after meeting with the Exim Bank’s president Liu Liang.

President Magufuli, while announcing the funding, alluded to a preferential deal without providing details.

Oil and gas discoveries have turned Tanzania into an exploration hotspot, but the country’s transport infrastructure has suffered from decades of under investment. The country is also positioning itself as a regional hub, upgrading its port to attract more business from its regional landlocked neighbours.

According to Mr Liu, China Exim Bank will offer Tanzania technical support.

READ: China Exim sets terms for financing Uganda’s SGR

ALSO READ: Rwanda looks to Tanzania for rail transport as Uganda falters on SGR

Last year, Tanzania announced that it had awarded rail contracts to a consortium of Chinese firms led by China Railway Materials (CRM), which included the standard gauge rail project.

The Exim Bank is also financing a $1.2 billion, 532km natural gas pipeline in Tanzania.

On Wednesday last week, Finance and Planning Minister Dr Philip Mpango after a meeting with Dr Alberic Kacou, African Development Bank vice-president for human resources and corporate services, announced that Tanzania had secured a further $200 million loan from the AfDB to finance transport infrastructure projects.

“We will use some of this funds towards the construction of the SGR project to transform the country’s infrastructure,” Dr Mpango said.

In an interview with Bloomberg, Gerson Msigwa, a spokesman for Tanzania’s presidency, said the construction will start by July next year. Before then, Tanzania and Exim Bank China will be expected to have finalise technical issues on the contract and sign the financing deal for the 2,190km project.

Tanzania Transport Minister Samuel Sitta said the SGR will have a main line that will connect the port city of Dar es Salaam to Rwanda and Burundi, with additional branch lines running within the country.

“We expect to have two offshoots: One of them to Mwanza, which will open up the lakeside port city and link it with Uganda, while the second one will link to the coal, iron ore and soda ash mining areas in the south. Through this, we expect an increase in cargo on this route,” Mr Sitta said, adding that will be at an additional cost of $6.6 billion.

Already, Tanzania has signed contracts with China Railway No 2 Engineering Group to build a rail link between the southern port of Mtwara, which is rich in coal, iron ore and natural gas. The contract will see China Railway No 2 Engineering Group provide 10 per cent of the funding with the rest provided by the government.

Kenya is also constructing a $3.27 billion 609km new standard gauge railway line between Mombasa and Nairobi to boost the movement of cargo from the port.

However, queries have been raised over the economic viability of SGR, after key landlocked states indicated their intention to connect to the Indian Ocean through Tanzania.


The issue of cost is also bound to arise now that Tanzania’s SGR is four times longer than Kenya’s but only two times as expensive.

In a previous interview with The EastAfrican, Kenya Railways managing director Atanas Maina said that the cost of the Kenyan SGR was high because of the design adopted, which will see the train maintain an average speed of 80 kilometres irrespective of the terrain.

“We have built bridges, and raised the track in areas where we would have had corners to achieve the average speed we expect the wagons to travel at. This has increased the costs immensely as compared with the neighbouring Ethiopia and Tanzania SGER designs that haven’t taken this into account,” Mr Maina said.

Recently, a confidential World Bank report cast doubt on the region’s push for the SGR projects, saying they would only be viable with increases in cargo of between 20 tonnes and 55 million tonnes per year.

The report done by the Africa transport unit at the World Bank titled The Economics of Rail Gauge in the East Africa Community showed that the volumes of the forecasts undertaken for the EAC railway master plan and central line in Tanzania, are unattainable over the medium to longer term.

“Based on these assumptions, there is no economic or financial case for standard gauge in the EAC area at this time. A refurbished meter gauge network would appear to be the most appropriate option in economic and financial terms, and could easily accommodate forecast traffic up to 2030, with lower investment requirements,” the report concludes.

The World Bank team highlighted the rehabilitation of the existing railway network as the best alternative, which would allow a phased approach to the regions development, consistent with current and projected demand and the financing envelope available.

The SGR alternative, which the regional governments chose, involves the construction of a standard gauge railway on a new right of way, an option the World Bank team said required additional investment in land acquisition and structures, and new right-of-way construction.

“This alternative predicates axle loads in the order of 25 tons per axles and a maximum operating speed of up to 120 km per hour. Again, based on these assumptions, the estimated maximum carrying capacity of the current network would exceed 60 million tonnes per year. The estimated investment cost per km will be $ 3.25 million,” the report said.

From the estimates provided, the Tanzanian new railway line will cost an average of $3.4 million per kilometre.

MY TAKE

It is time now to look at the cost of the two rails as we know cost of construction is very important for prospect of any infrastructure! i welcome bright minds to contribute and not some propaganda in here!


nomasana, sam999, NairobiWalker, hbuyosh, msemakweli, simplemind, Kimweri, Bulldog, MK254, Kafrican, Ngongo, Ab_Titchaz, mtanganyika mpya, JokaKuu, Ngongo, Askari Kanzu, Dhuks, Yule-Msee, waltham, Mzee, mombasite gabriel, Juakali1980, Boda254, mwaswast, MwendaOmo, Iconoclastes, oneflash, Kambalanick, 1 Africa, saadeque, burukenge, nyangau mkenya, Teen-Upperhill Nairobi, kadoda11
 
Kafrican

Kafrican

JF-Expert Member
Joined
Jan 26, 2015
Messages
3,915
Likes
3,345
Points
280
Kafrican

Kafrican

JF-Expert Member
Joined Jan 26, 2015
3,915 3,345 280
Ndo maan mchina anawaibia hadi mauzo ya ticket maana ashawaona nyie n mazuzu
Kama wakenya ni mazuzu basi watanzania si watakua ngombe za mazuzu..... Vipi mlilipwa Ile $190B mliokua mnadai acacia?
 
Kafrican

Kafrican

JF-Expert Member
Joined
Jan 26, 2015
Messages
3,915
Likes
3,345
Points
280
Kafrican

Kafrican

JF-Expert Member
Joined Jan 26, 2015
3,915 3,345 280
Kwa wale ambao hawajui, Phase 2 ya Ethiopia SGR masterplan imefika mbali, sehemu hio ya reli inajengwa na Yepi Merkezi kwahivyo watz mnaeza mkaangalia finished product, mkingojea yenu iishe...

1200px-Awash-Weldiya_Railway.svg.png





1544216453118-png.959017




LF0iDoT.jpg?1



fMSAEZw.jpg?1


mPdeo2T.jpg?1



DQ2vLz2W4AENJ5S.jpg


turkish-construction-giant-eyes-more-africa-projects-after-ethiopia-tanzania-railways-1501668374171.jpg&mw=645

uUP28sI.jpg?1

zkctRWY.jpg?1


XpN4nLr.jpg?1


Systra Team in Ethiopia - AKH Railway Project - An important milestone has been achieved with the laying of the last track panel, completing the track connection between Awash and Kombolcha - the 270km of the project's first phase. Congratulations to Systra MD team and to the Contractor Yapi Merkezi!


ALOX1GJ.jpg?1
 
thisdayes

thisdayes

JF-Expert Member
Joined
Oct 28, 2016
Messages
1,912
Likes
2,039
Points
280
Age
31
thisdayes

thisdayes

JF-Expert Member
Joined Oct 28, 2016
1,912 2,039 280
Kwa wale ambao hawajui, Phase 2 ya Ethiopia SGR masterplan imefika mbali, sehemu hio ya reli inajengwa na Yepi Merkezi kwahivyo watz mnaeza mkaangalia finished product, mkingojea yenu iishe...

1200px-Awash-Weldiya_Railway.svg.png





View attachment 959017



LF0iDoT.jpg?1



fMSAEZw.jpg?1


mPdeo2T.jpg?1



DQ2vLz2W4AENJ5S.jpg


turkish-construction-giant-eyes-more-africa-projects-after-ethiopia-tanzania-railways-1501668374171.jpg&mw=645

uUP28sI.jpg?1

zkctRWY.jpg?1


XpN4nLr.jpg?1


Systra Team in Ethiopia - AKH Railway Project - An important milestone has been achieved with the laying of the last track panel, completing the track connection between Awash and Kombolcha - the 270km of the project's first phase. Congratulations to Systra MD team and to the Contractor Yapi Merkezi!


ALOX1GJ.jpg?1
Ukisoma details za hii reli ya Ethiopia ni kama mchina aliyowajengea tofauti ya Ethiopia ni ya umeme. Axle load mpaka speed mnaenda sambamba. Reli ya Tz Yerpi wamesema wanajenga rail bora zaidi Africa, ata kwa kuangalia unaona utofauti. Unaeza leta finished work zingine za Yerpi ambazo specs zake ni kama ya Tz. Najua hutoweza kwa sababu it makes your SGR to look like a dwarf.
 
Kafrican

Kafrican

JF-Expert Member
Joined
Jan 26, 2015
Messages
3,915
Likes
3,345
Points
280
Kafrican

Kafrican

JF-Expert Member
Joined Jan 26, 2015
3,915 3,345 280
Ukisoma details za hii reli ya Ethiopia ni kama mchina aliyowajengea tofauti ya Ethiopia ni ya umeme. Axle load mpaka speed mnaenda sambamba. Reli ya Tz Yerpi wamesema wanajenga rail bora zaidi Africa, ata kwa kuangalia unaona utofauti. Unaeza leta finished work zingine za Yerpi ambazo specs zake ni kama ya Tz. Najua hutoweza kwa sababu it makes your SGR to look like a dwarf.
Ha! Angalia map tena, huko Ethiopia mchina amejenga reli ya Djibouti -addis , reli ya awash ni sehemu nyengine kabisa! Na kandarasi ilipewa Yepi ambayo picha zake ndo hizo hapo... Axle load ni kitu ambacho hauezi kutofautisha Kwa kuangalia Kwa macho manake hio inahusiana na density ya chuma.... hata design speed pia hauwezi tofauti Kwa kuangalia Kwa macho.... Si Yepi alie Sema anajenga best rail in Africa, watanzania ndo walisema hivyo!!!!


Alafu ukitafuta kazi za Yepi duniani, wanajulikana Kwa tram na light rail systems... Tz ndo mmempatia yepi uwezo wa kujenga heavy rail nje ya turkey kwahivyo nyinyi ndo mnatumika kama gunie pig ama launch pad... Ndii maana unaona Yepi wametia bidii kutoa update kila wiki usifikirie wanafurahisha watz pekee... Wanajitangaza Kwa potential customers wa nchi zengine
 
thisdayes

thisdayes

JF-Expert Member
Joined
Oct 28, 2016
Messages
1,912
Likes
2,039
Points
280
Age
31
thisdayes

thisdayes

JF-Expert Member
Joined Oct 28, 2016
1,912 2,039 280
Ha! Angalia map tena, huko Ethiopia mchina amejenga reli ya Djibouti -addis , reli ya awash ni sehemu nyengine kabisa! Na kandarasi ilipewa Yepi ambayo picha zake ndo hizo hapo... Axle load ni kitu ambacho hauezi kutofautisha Kwa kuangalia Kwa macho manake hio inahusiana na density ya chuma.... hata design speed pia hauwezi tofauti Kwa kuangalia Kwa macho.... Si Yepi alie Sema anajenga best rail in Africa, watanzania ndo walisema hivyo!!!!


Alafu ukitafuta kazi za Yepi duniani, wanajulikana Kwa tram na light rail systems... Tz ndo mmempatia yepi uwezo wa kujenga heavy rail nje ya turkey kwahivyo nyinyi ndo mnatumika kama gunie pig ama launch pad... Ndii maana unaona Yepi wametia bidii kutoa update kila wiki usifikirie wanafurahisha watz pekee... Wanajitangaza Kwa potential customers wa nchi zengine
Ww vp.. mbona unayumba! Taharifa zote zipo kwani ww hizo picha ulitumiwa na mkandarasi. Wewe tafuta habari za speed na axle load mbona zote zipo online!! Ata taharifa ulizo post hujazi soma! Maana kwenye moja ya picha zako wameandika speed itakua kama yenu, halafu una niambia speed huezi ona kwa kuangalia picha! Miradi kama hii kabla haijaanza specs zote zinakua zinajulikana. Ilikua haina haja kuleta mradi wa sgr ya Ethiopia coz specs ni tofauti. Tz tunajuwa tutakacho kipata coz sisi ndiyo tume wapa kazi acha kuranda randa mitandaoni na kujifurahisha. Halafu utasemaje Tz peke yake ndiyo tumewapa kazi ya heavy rail, wewe jamaa haupo makini kabisa! Ebu wafuatilie vizuri Yepi, kwa kuanzia pitia vizuri hizo picha ulizotuma. Maana kwa mujibu wa details za hiyo project ya Ethiopia ni Heavy rail, Labda ungesema siyo heavy kama wanayo jenga Tz. Ila ata tungempa mchina aliewajengea nyie bado tungempa masharti ambayo hajawahi kutana nayo kabla kama kuto tumia nondo nyembamba kama alizo tumia Kenya, kuweka systems kwa kizungu siyo kichina, ku install mifumo ya kisasa ya umeme (european standard), workers more than 90% wawe wazawa. Material more than 65% itoke ndani na itakayo toka njee iwe the best siyo kupeana tender na wachina wenzao kama walivyo fanya Kenya, ku train wazawa e.t.c.

You just sit and take notes from us on the advantages of following the procurement regulations and skipping tenderpreneurship, Kenyans you missed this lesson.
 
Geza Ulole

Geza Ulole

JF-Expert Member
Joined
Oct 31, 2009
Messages
16,509
Likes
8,818
Points
280
Geza Ulole

Geza Ulole

JF-Expert Member
Joined Oct 31, 2009
16,509 8,818 280
From specifications alone one can see our SGR is completely different from Ethiopia's the speed for Ethiopian SGR is 120km/h PAX while Tanzanian SGR is over 160km/h. Second none of our bridges will be steel structures alone! Pretty sure ours will be superior to Ethiopia's!

Kwa wale ambao hawajui, Phase 2 ya Ethiopia SGR masterplan imefika mbali, sehemu hio ya reli inajengwa na Yepi Merkezi kwahivyo watz mnaeza mkaangalia finished product, mkingojea yenu iishe...

1200px-Awash-Weldiya_Railway.svg.png





View attachment 959017



LF0iDoT.jpg?1



fMSAEZw.jpg?1


mPdeo2T.jpg?1



DQ2vLz2W4AENJ5S.jpg


turkish-construction-giant-eyes-more-africa-projects-after-ethiopia-tanzania-railways-1501668374171.jpg&mw=645

uUP28sI.jpg?1

zkctRWY.jpg?1


XpN4nLr.jpg?1


Systra Team in Ethiopia - AKH Railway Project - An important milestone has been achieved with the laying of the last track panel, completing the track connection between Awash and Kombolcha - the 270km of the project's first phase. Congratulations to Systra MD team and to the Contractor Yapi Merkezi!


ALOX1GJ.jpg?1
 