Tanzania secures $7.6 billion financing deal from Chinese lender to build new railway

President John Magufuli with China Exim Bank president Liu Liang after holding talks at Chamwino State Lodge in Dodoma this week. PHOTO | COURTESY

In Summary

  • Dar es Salaam is positioning itself as a regional hub, upgrading its port to attract more business from its neighbouring landlocked countries.
  • The EAC railways master plan incorporates the standard gauge railway’s Northern and Central Corridors, which are both commercially viable for landlocked countries in the region as they give them strategic access to the ports of Mombasa and Dar es Salaam.
  • The Northern Corridor Integration Projects championed by Rwanda, Kenya and Uganda spearheaded the establishment of a railway link from Mombasa to Kigali.
  • In June 2013, a Northern Corridor Integration Projects Heads of State Summit held in Kampala put in place mechanisms for fast-tracking the development of the SGR.


Tanzania has secured a $7.6 billion loan from China’s Export-Import Bank (Exim) for the construction of a railway line that will link it with Burundi, Rwanda and Democratic Republic of Congo.

President John Magufuli secured the concessional loan after meeting with the Exim Bank’s president Liu Liang.

President Magufuli, while announcing the funding, alluded to a preferential deal without providing details.

Oil and gas discoveries have turned Tanzania into an exploration hotspot, but the country’s transport infrastructure has suffered from decades of under investment. The country is also positioning itself as a regional hub, upgrading its port to attract more business from its regional landlocked neighbours.

According to Mr Liu, China Exim Bank will offer Tanzania technical support.

READ: China Exim sets terms for financing Uganda’s SGR

ALSO READ: Rwanda looks to Tanzania for rail transport as Uganda falters on SGR

Last year, Tanzania announced that it had awarded rail contracts to a consortium of Chinese firms led by China Railway Materials (CRM), which included the standard gauge rail project.

The Exim Bank is also financing a $1.2 billion, 532km natural gas pipeline in Tanzania.

On Wednesday last week, Finance and Planning Minister Dr Philip Mpango after a meeting with Dr Alberic Kacou, African Development Bank vice-president for human resources and corporate services, announced that Tanzania had secured a further $200 million loan from the AfDB to finance transport infrastructure projects.

“We will use some of this funds towards the construction of the SGR project to transform the country’s infrastructure,” Dr Mpango said.

In an interview with Bloomberg, Gerson Msigwa, a spokesman for Tanzania’s presidency, said the construction will start by July next year. Before then, Tanzania and Exim Bank China will be expected to have finalise technical issues on the contract and sign the financing deal for the 2,190km project.

Tanzania Transport Minister Samuel Sitta said the SGR will have a main line that will connect the port city of Dar es Salaam to Rwanda and Burundi, with additional branch lines running within the country.

“We expect to have two offshoots: One of them to Mwanza, which will open up the lakeside port city and link it with Uganda, while the second one will link to the coal, iron ore and soda ash mining areas in the south. Through this, we expect an increase in cargo on this route,” Mr Sitta said, adding that will be at an additional cost of $6.6 billion.

Already, Tanzania has signed contracts with China Railway No 2 Engineering Group to build a rail link between the southern port of Mtwara, which is rich in coal, iron ore and natural gas. The contract will see China Railway No 2 Engineering Group provide 10 per cent of the funding with the rest provided by the government.

Kenya is also constructing a $3.27 billion 609km new standard gauge railway line between Mombasa and Nairobi to boost the movement of cargo from the port.

However, queries have been raised over the economic viability of SGR, after key landlocked states indicated their intention to connect to the Indian Ocean through Tanzania.


The issue of cost is also bound to arise now that Tanzania’s SGR is four times longer than Kenya’s but only two times as expensive.

In a previous interview with The EastAfrican, Kenya Railways managing director Atanas Maina said that the cost of the Kenyan SGR was high because of the design adopted, which will see the train maintain an average speed of 80 kilometres irrespective of the terrain.

“We have built bridges, and raised the track in areas where we would have had corners to achieve the average speed we expect the wagons to travel at. This has increased the costs immensely as compared with the neighbouring Ethiopia and Tanzania SGER designs that haven’t taken this into account,” Mr Maina said.

Recently, a confidential World Bank report cast doubt on the region’s push for the SGR projects, saying they would only be viable with increases in cargo of between 20 tonnes and 55 million tonnes per year.

The report done by the Africa transport unit at the World Bank titled The Economics of Rail Gauge in the East Africa Community showed that the volumes of the forecasts undertaken for the EAC railway master plan and central line in Tanzania, are unattainable over the medium to longer term.

“Based on these assumptions, there is no economic or financial case for standard gauge in the EAC area at this time. A refurbished meter gauge network would appear to be the most appropriate option in economic and financial terms, and could easily accommodate forecast traffic up to 2030, with lower investment requirements,” the report concludes.

The World Bank team highlighted the rehabilitation of the existing railway network as the best alternative, which would allow a phased approach to the regions development, consistent with current and projected demand and the financing envelope available.

The SGR alternative, which the regional governments chose, involves the construction of a standard gauge railway on a new right of way, an option the World Bank team said required additional investment in land acquisition and structures, and new right-of-way construction.

“This alternative predicates axle loads in the order of 25 tons per axles and a maximum operating speed of up to 120 km per hour. Again, based on these assumptions, the estimated maximum carrying capacity of the current network would exceed 60 million tonnes per year. The estimated investment cost per km will be $ 3.25 million,” the report said.

From the estimates provided, the Tanzanian new railway line will cost an average of $3.4 million per kilometre.

MY TAKE

It is time now to look at the cost of the two rails as we know cost of construction is very important for prospect of any infrastructure! i welcome bright minds to contribute and not some propaganda in here!


nomasana, sam999, NairobiWalker, hbuyosh, msemakweli, simplemind, Kimweri, Bulldog, MK254, Kafrican, Ngongo, Ab_Titchaz, mtanganyika mpya, JokaKuu, Ngongo, Askari Kanzu, Dhuks, Yule-Msee, waltham, Mzee, mombasite gabriel, Juakali1980, Boda254, mwaswast, MwendaOmo, Iconoclastes, oneflash, Kambalanick, 1 Africa, saadeque, burukenge, nyangau mkenya, Teen-Upperhill Nairobi, kadoda11
 
N

ndughuri msuya

JF-Expert Member
Joined
Feb 29, 2012
Messages
725
Points
1,000
N

ndughuri msuya

JF-Expert Member
Joined Feb 29, 2012
725 1,000

Delegation kutoka Tunisian Railways yatembelea CCCC kenya kukagua SGR ya Kenya....

Inasemekana Tunisia wanataka CCCC ijenge SGR huko Tunisia kwa mfano wa SGR ya Kenya.... Najua kuna majirani flani wangetembelewa na watu/nchi ambao wako tayari kujenga SGR yao, hatunge lala humu JF, tungepigiwa story za "best in Africa" kila siku!

Watunisia wamefika kwenu nanyi mtafika kwetu kujifunza treni ya umeme
 
Kafrican

Kafrican

JF-Expert Member
Joined
Jan 26, 2015
Messages
5,063
Points
2,000
Kafrican

Kafrican

JF-Expert Member
Joined Jan 26, 2015
5,063 2,000
Evidence? Till today that thing hasn't crossed 100 km/h!
Hii hapa evidence Inaonyesha ikiwa 134km/hr... wakati wa testing walienda hadi 158km/hr, ndio maana hapo kwa mlango wa dereva imeandikwa "max speed 158km/hr" kumkumbusha dereva kwamba asiwahi kupitisha hapo hata kama speedometer inaonyesha hadi 200km/hr.

sgr-test-jpg.1180704
sgr-134-kmhr-jpg.1180705
 
Chamoto

Chamoto

JF-Expert Member
Joined
Dec 7, 2007
Messages
4,295
Points
2,000
Chamoto

Chamoto

JF-Expert Member
Joined Dec 7, 2007
4,295 2,000
Wewe huoni,inaundwa kama lami za kawaida?
Nikiangalia ya Kenya na Ethiopia naidharau hii yenu by far.
Nothing superior about it
Inaundwa kama lami za kawaida? Mbona mimi sijaona lami yoyote hapo?
 
J

Janerose mzalendo

JF-Expert Member
Joined
Oct 4, 2018
Messages
3,543
Points
2,000
J

Janerose mzalendo

JF-Expert Member
Joined Oct 4, 2018
3,543 2,000
Kwani wamemaliza?
chamoto, mi' sizungumzii reli.Tanzania is beautiful hasa yale maeneo ya ruaha. Nimeshangaa kuona dar to Moro hakupendezi kama Kenya ambako reli inapitia
 
diamond d

diamond d

JF-Expert Member
Joined
Dec 20, 2018
Messages
281
Points
500
diamond d

diamond d

JF-Expert Member
Joined Dec 20, 2018
281 500
We hiyo diesel tu, yetu itakuwa adjustable hadi 300 na zaid , hasa ile ya cross country yaan Tz, Rwanda to Congo or Burundi ila nyie doooh Nai to Kampala siku 2
 
Chamoto

Chamoto

JF-Expert Member
Joined
Dec 7, 2007
Messages
4,295
Points
2,000
Chamoto

Chamoto

JF-Expert Member
Joined Dec 7, 2007
4,295 2,000
chamoto, mi' sizungumzii reli.Tanzania is beautiful hasa yale maeneo ya ruaha. Nimeshangaa kuona dar to Moro hakupendezi kama Kenya ambako reli inapitia
Hiyo reli haipiti ruaha (TAZARA ndiyo yenye kupita huko), hata hivyo hichi ni kipindi cha kiangazi hivyo majani hukauka.
 
mwaswast

mwaswast

JF-Expert Member
Joined
May 12, 2014
Messages
10,066
Points
2,000
mwaswast

mwaswast

JF-Expert Member
Joined May 12, 2014
10,066 2,000
Weka evidence ikiwa na mzigo!
Wewe Hebu weka evidence yenu ikisonga kwa 1km/hr bila mzigo😂😂😂...oh! Nilisahau hamna SGR operational.
Punguza ujinga baba nanii, Mzigo haizuii gari/treni/Ndege/motorcycle kufika maximum speed. Kwani Hapo Tz Kuna dawa ya ujinga mnapewa kila asubuhi?
 

Forum statistics

Threads 1,326,605
Members 509,543
Posts 32,228,258
Top