Uganda Brings Forward Pipeline Final Investment Decision to 2018

Geza Ulole

JF-Expert Member
Oct 31, 2009
59,322
79,797
Uganda Brings Forward Pipeline Final Investment Decision to 2018
By
Fred Ojambo
Mon Apr 30 2018 08:13:30 GMT+0200 (CEST)
Uganda has brought forward its final investment decision for a planned 1,445-kilometer (900-mile) crude-export pipeline to the end of 2018 from June 2019, according to its Energy Ministry.

Intergovernmental accords with Tanzania, where the bulk of the conduit will pass through, are still expected to be signed by the end June, to pave way for early works on the project, the ministry said on its Facebook page.

Uganda opted to route its crude via Tanzania two years ago instead of earlier plans of transiting through Kenya. France’s Total SA is the lead sponsor of the project known as the East African Crude-Oil Pipeline. Uganda targets the conduit to start operations in 2020.

Total, China’s Cnooc Ltd. and London-based Tullow Oil Plc are jointly developing Uganda’s crude finds of up to 6.5 billion barrels of oil.

Before it's here, it's on the Bloomberg Terminal.

Uganda Brings Forward Pipeline Final Investment Decision to 2018
 
Uganda Brings Forward Pipeline Final Investment Decision to 2018
By
Fred Ojambo
Mon Apr 30 2018 08:13:30 GMT+0200 (CEST)
Uganda has brought forward its final investment decision for a planned 1,445-kilometer (900-mile) crude-export pipeline to the end of 2018 from June 2019, according to its Energy Ministry.

Intergovernmental accords with Tanzania, where the bulk of the conduit will pass through, are still expected to be signed by the end June, to pave way for early works on the project, the ministry said on its Facebook page.

Uganda opted to route its crude via Tanzania two years ago instead of earlier plans of transiting through Kenya. France’s Total SA is the lead sponsor of the project known as the East African Crude-Oil Pipeline. Uganda targets the conduit to start operations in 2020.

Total, China’s Cnooc Ltd. and London-based Tullow Oil Plc are jointly developing Uganda’s crude finds of up to 6.5 billion barrels of oil.

Before it's here, it's on the Bloomberg Terminal.

Uganda Brings Forward Pipeline Final Investment Decision to 2018
Inaoneka Museveni anajikakamua vizuri by 2020 atakuwa anuza mafuta na mwenzake JPM atkuwa anatoza kodi ya $12 per barrel pesa ya rahisi
 
When will this Project ever kick off
2015 jiwe la msingi
2016 oh tutaanza mwezi wa nane
2017 tutaanza december
2018 tutaanza june
2019 tuta.....
IMG_20180424_124137.jpg

Hadi kero:D:D:D:D:D:D:D:D:D:D:D:D:D:D
 
When will this Project ever kick off
2015 jiwe la msingi
2016 oh tutaanza mwezi wa nane
2017 tutaanza december
2018 tutaanza june
2019 tuta.....
View attachment 762160
Hadi kero:D:D:D:D:D:D:D:D:D:D:D:D:D:D

Teh teh teh tihiii
Sindano imekuingia mpaka umeanza kuweweseka na kuanza kuimba mapambio sijui ya wapi vile.
Pipeline line ndiyo hivyo tena imeshawaponyoka. Iko bongo SASA.
 
Teh teh teh tihiii
Sindano imekuingia mpaka umeanza kuweweseka na kuanza kuimba mapambio sijui ya wapi vile.
Pipeline line ndiyo hivyo tena imeshawaponyoka. Iko bongo SASA.
Hi pipelineIlituponyoka tangu 2015 hivi naomba tu picha moja ya ujenzi na staki kuskia tuki, tuta bla bla na kwa kweli ukileta nahama jamii forum nyie wavivu wa kutupwa maneno mengi actions zero:D:D:D:D
 
wacha kushughulika na mfa maji. JPM hapo 2020 atakuwa anachua dollar $12 kwa kila pipa ambalo Uganda wanauza nje ya nchi yao. Kumbuka hakuna hata shillingi moja ya Tz itatumika kwa pipline
Dah na kwa siku pipa laki mbili zinasafirishwa. Inamaana TZ itakuwa inachukuwa inachukua dola 2400000 kwa siku. Kwa pesa ya kitanzania, TZ itakuwa inaingiza sh bil 5.3.
 
Teh teh teh tihiii
Sindano imekuingia mpaka umeanza kuweweseka na kuanza kuimba mapambio sijui ya wapi vile.
Pipeline line ndiyo hivyo tena imeshawaponyoka. Iko bongo SASA.
Ukiona emoji zimekuwa nyingi kupitiliza jua ni maumivu.
 
Dah na kwa siku pipa laki mbili zinasafirishwa. Inamaana TZ itakuwa inachukuwa inachukua dola 2400000 kwa siku. Kwa pesa ya kitanzania, TZ itakuwa inaingiza sh bil 5.3.
Museveni ameshajitoa kwa Kenya zamani sana. Kwa sasa hadi usafirishaji wa mafuta yalio kuwa refined yatapita Lake Victoria
 
Uganda Brings Forward Pipeline Final Investment Decision to 2018
By
Fred Ojambo
Mon Apr 30 2018 08:13:30 GMT+0200 (CEST)
Uganda has brought forward its final investment decision for a planned 1,445-kilometer (900-mile) crude-export pipeline to the end of 2018 from June 2019, according to its Energy Ministry.

Intergovernmental accords with Tanzania, where the bulk of the conduit will pass through, are still expected to be signed by the end June, to pave way for early works on the project, the ministry said on its Facebook page.

Uganda opted to route its crude via Tanzania two years ago instead of earlier plans of transiting through Kenya. France’s Total SA is the lead sponsor of the project known as the East African Crude-Oil Pipeline. Uganda targets the conduit to start operations in 2020.

Total, China’s Cnooc Ltd. and London-based Tullow Oil Plc are jointly developing Uganda’s crude finds of up to 6.5 billion barrels of oil.

Before it's here, it's on the Bloomberg Terminal.

Uganda Brings Forward Pipeline Final Investment Decision to 2018
Annual TZ total collection from this project will be equal to the Kenyan annual budget.
 
Back
Top Bottom