Tanroads: Damage caused by overloading cost the nation 77bn/- this year, up from 62bn/- 2011/12.

Bogot'aa

Member
Oct 9, 2013
28
3
Tanzania National Roads Agency (Tanroads) plans to install Weigh in Motion equipment to screen heavy trucks so as to reduce the congestions and save time at weighbridges, it has been learnt.

The plans are contained in a report released in Dar es Salaam by Tanroads titled: "Vehicle Overload Control on Trunk Roads in Tanzania................."

The report was compiled senior Tanroads engineers Joseph Lwiza, Lucian Kilewo, Boniface Malisa and Japhet Kivuyo, who noted that vehicle damage due to overloading has increased by 25 percent.

"While the engineers say damage caused by overloading cost the nation 77bn/- this year, up from 62bn/- 2011/12....................."

Kwa mtindo huu barabara zetu hazitadumu hata kama zikidumu sana sana ni miaka mitatu tu (3) badala ya miaka ishirini (20) inayotakiwa kuwa (Pavement Life Span). Ili kupata uharibifu unavyofanyika katika barabara zinazosimamiwa na TANROADS, naomba pata taswira mbalimbali za picha kadhaa kutoka kwa wapenda maendeleo na wazarendo wenzangu:

d98ee19394b376a327103b4e836ae3d0.jpg d95d285256a74899715e42f02020c392.jpg e0436b8aa2cecc22b27b4455ff2aee7f.jpg d159869658c703eef11d4dce012051ae.jpg 0bca992dbcad7949f6a6aaa88f2accb2.jpg 14ce17405623acddb794183f2a94c459.jpg 16bc47af40385ba7d4c7859f52d81f90.jpg 42d867518b9bae0905daa3b27fa1da58.jpg 50f43f702247113397e88df1378017d5.jpg 0082a63857b2b0db8e45b611c24cc420.jpg 0228c30f6c34e1633d872cd1e3343d24.jpg 39888d6327cd0af20c2c83cf53a5c1bd.jpg a23eec1cd68c40344521aa010e99137e.jpg a45dab3d33d94d8cdca2f1883cf41d9c.jpg b9653b1131c8030f0583259485dfbf8b.jpg c646808113da18dc028b9c27a3947b85.jpg ca0495f5eee515db9c8f5b36d0753308.jpg
 
Tanzania National Roads Agency (Tanroads) plans to install Weigh in Motion equipment to screen heavy trucks so as to reduce the congestions and save time at weighbridges, it has been learnt.

The plans are contained in a report released in Dar es Salaam by Tanroads titled: "Vehicle Overload Control on Trunk Roads in Tanzania................."

The report was compiled senior Tanroads engineers Joseph Lwiza, Lucian Kilewo, Boniface Malisa and Japhet Kivuyo, who noted that vehicle damage due to overloading has increased by 25 percent.

"While the engineers say damage caused by overloading cost the nation 77bn/- this year, up from 62bn/- 2011/12....................."

Kwa mtindo huu barabara zetu hazitadumu hata kama zikidumu sana sana ni miaka mitatu tu (3) badala ya miaka ishirini (20) inayotakiwa kuwa (Pavement Life Span). Ili kupata uharibifu unavyofanyika katika barabara zinazosimamiwa na TANROADS, naomba pata taswira mbalimbali za picha kadhaa kutoka kwa wapenda maendeleo na wazarendo wenzangu:

Nikifika tu hapo mimi najiamulia kurudi kwenye Lugha yangu ya Kiswahili tu basi!
 
Tanzania National Roads Agency (Tanroads) plans to install Weigh in Motion equipment to screen heavy trucks so as to reduce the congestions and save time at weighbridges, it has been learnt.

The plans are contained in a report released in Dar es Salaam by Tanroads titled: “Vehicle Overload Control on Trunk Roads in Tanzania.................”

The report was compiled senior Tanroads engineers Joseph Lwiza, Lucian Kilewo, Boniface Malisa and Japhet Kivuyo, who noted that vehicle damage due to overloading has increased by 25 percent.

"While the engineers say damage caused by overloading cost the nation 77bn/- this year, up from 62bn/- 2011/12....................."

Kwa mtindo huu barabara zetu hazitadumu hata kama zikidumu sana sana ni miaka mitatu tu (3) badala ya miaka ishirini (20) inayotakiwa kuwa (Pavement Life Span). Ili kupata uharibifu unavyofanyika katika barabara zinazosimamiwa na TANROADS, naomba pata taswira mbalimbali za picha kadhaa kutoka kwa wapenda maendeleo na wazarendo wenzangu:

View attachment 125694View attachment 125695View attachment 125696View attachment 125697View attachment 125698View attachment 125699View attachment 125700View attachment 125701View attachment 125703View attachment 125704View attachment 125705View attachment 125706View attachment 125707View attachment 125708View attachment 125709View attachment 125710View attachment 125711

Nilishawahi kutoa thread inafanana na hii humu jamvini, nachosema ni barabara zitatoboka si muda mrefu kwa vile uwezo wa barabara zetu kuhimili traffic loading hauendani na design yake. Tegemea kitu kinaitwa "Structural Deformation"

Na ni aibu kubwa kwa taifa masikini kama Tanzania kujenga barabara kwa gharama kubwa mfano kwa sasa 1km/1billion(Tshs) harafu wanashindwa kuzihifadhi ili zidumu kwa design life span yake, hizi mbwembwe za kuzindua mabarabara na kuweka mawe ya msingi zitakuwa useless kabisa, hali ikiendelea hivi, yangu macho.
 
Back
Top Bottom