Kiwanda cha Gesi chajengwa baharini

Kiwanda cha Gesi chajengwa baharini

Bahati furaha

JF-Expert Member
Joined
Jul 11, 2012
Posts
3,077
Reaction score
1,439
Prelude is a staggering 488m long and the best way to grasp what this means is by comparison with something more familiar.

Four football pitches placed end-to-end would not quite match this vessel's length - and if you could lay the 301m of the Eiffel Tower alongside it, or the 443m of the Empire State Building, they wouldn't do so either.

In terms of sheer volume, Prelude is mind-boggling too: if you took six of the world's largest aircraft carriers, and measured the total amount of water they displaced, that would just about be the same as with this one gigantic vessel.

Under construction for the energy giant Shell, the dimensions of the platform are striking in their own right - but also as evidence of the sheer determination of the oil and gas industry to open up new sources of fuel.
To exploit the Prelude gas field more than 100 miles off the northwest coast of Australia, Shell has opted to bypass the step of bringing the gas ashore, instead developing a system which will do the job of liquefaction at sea.

Hence Prelude will become the world's first floating LNG plant - or FLNG in the terminology of the industry.

In Shell's view, this means avoiding the costly tasks of building a pipeline to the Australian coast and of constructing an LNG facility that might face a long series of planning battles, and require a host of new infrastructure on a remote coastline.

So Prelude will be parked above the gas field for a projected 25 years and become not merely a rig, harvesting the gas from down below, but also a factory and store where tankers can pull alongside to load up with LNG.

Kwa habari timilifu:

http://www.bbc.com/news/science-environment-30394137
 
Nina wasiwasi wa maandalizi ya kurahisisha kamchezo fulani.Wanaojengewa hiyo kitu wajichunge sana!
 
Uzuri kwenye sheria yetu ya mafuta na gesi inasema uchakataji na shughuli zote za kuendeleza miradi itafanyikia nchi kavu.
 
Uzuri kwenye sheria yetu ya mafuta na gesi inasema uchakataji na shughuli zote za kuendeleza miradi itafanyikia nchi kavu.
Vizuri maana kuna watu hatufuatilii viyu Sheria imweka wazi SECTION 149 Inasema "All gas processing facilities shall be located onshore"
 
Back
Top Bottom