Zack Abdul
JF-Expert Member
- Mar 9, 2026
- 857
- 757
Processing bottlenecks at the Tanzania Ports Authority hub have fallen from 10 days to 48 hours. This sharp speed increase applies strictly to on-site clearance, drastically cutting delays for the port’s largest regional transit market.
# Bilateral Trade Surge: Fuelled by a record 7.77 million tonnes of cargo, a new 90-day pact aims to boost the DRC’s port share to 60%.
# Regional Connectivity: Tanzania is constructing an electrified standard-gauge railway (SGR) network to link Tanzania, the DRC, Rwanda and Burundi.
# Bilateral Trade Surge: Fuelled by a record 7.77 million tonnes of cargo, a new 90-day pact aims to boost the DRC’s port share to 60%.
# Regional Connectivity: Tanzania is constructing an electrified standard-gauge railway (SGR) network to link Tanzania, the DRC, Rwanda and Burundi.