Kafrican is trying to show how expensive is tz sgr compared to the one in Kenya, but he need to know the followings,
1. Electrification
Saying tz sgr is expensive because some of the expenses are covered by Tanesco, eg TL, this is wrong
Because Kenya sgr is not electrified, so if they want to electrify it they gonna incur more cost, they will need a TL and the catenaries so the cost will jump rapidly,
2. Continuous welded
Kenya sgr is not welded, welding it means more cost.
Taking into consideration the two facts above still tz have got a better deal, if Kenya want to meet the standard of tz sgr by eg electrifying and welding their sgr the cost will increase tremendously.
So let us compare the cost at the same level without including the cost of the things Kenya sgr don't have like electrification
Kafrican is trying to show how expensive is tz sgr compared to the one in Kenya, but he need to know the followings,
1. Electrification
Saying tz sgr is expensive because some of the expenses are covered by Tanesco, eg TL, this is wrong
Because Kenya sgr is not electrified, so if they want to electrify it they gonna incur more cost, they will need a TL and the catenaries so the cost will jump rapidly,
2. Continuous welded
Kenya sgr is not welded, welding it means more cost.
Taking into consideration the two facts above still tz have got a better deal, if Kenya want to meet the standard of tz sgr by eg electrifying and welding their sgr the cost will increase tremendously.
So let us compare the cost at the same level without including the cost of the things Kenya sgr don't have like electrification
Mr Kifaru_07 alias Kafrican here is the number of wagons procured!Though you are leaving out the extra things that Kenya SGR has. In Mombasa 1km of sea bed was reclaimed for the cargo shuffling terminal and all the port cranes and equipment on it, Nairobi ICD and some of the equipment. Much better train stations and Kenya SGR has 3 times more locomotives, 54 vs 16 and more rolling stock. The figure for locomotives given by TZ seems to only account for cargo locomotives, what about the passenger trains? Are those included in the 16 and $400m cost? If so 16 trains is a very little if you expect to move alot of cargo and make a profit.
Hii SGR ya TZ inaka bei kali kushida Kenya with less revenue.
Last time this was the cost not sure if TL n electrical locomotives were also factored in!Kafrican is trying to show how expensive is tz sgr compared to the one in Kenya, but he need to know the followings,
1. Electrification
Saying tz sgr is expensive because some of the expenses are covered by Tanesco, eg TL, this is wrong
Because Kenya sgr is not electrified, so if they want to electrify it they gonna incur more cost, they will need a TL and the catenaries so the cost will jump rapidly,
2. Continuous welded
Kenya sgr is not welded, welding it means more cost.
Taking into consideration the two facts above still tz have got a better deal, if Kenya want to meet the standard of tz sgr by eg electrifying and welding their sgr the cost will increase tremendously.
So let us compare the cost at the same level without including the cost of the things Kenya sgr don't have like electrification
Kuna Kwala ICD na pia SGR Tanzania itafika Dar port pia! especially after a realignment to fit with BRT project around the area! As for ur SGR in Mombasa u probably don't know this is what happened u got right off cranes!Though you are leaving out the extra things that Kenya SGR has. In Mombasa 1km of sea bed was reclaimed for the cargo shuffling terminal and all the port cranes and equipment on it, Nairobi ICD and some of the equipment. Much better train stations and Kenya SGR has 3 times more locomotives, 54 vs 16 and more rolling stock. The figure for locomotives given by TZ seems to only account for cargo locomotives, what about the passenger trains? Are those included in the 16 and $400m cost? If so 16 trains is a very little if you expect to move alot of cargo and make a profit.
Hii SGR ya TZ inaka bei kali kushida Kenya with less revenue.
Kuna Kwala ICD na pia SGR Tanzania itafika Dar port pia! especially to fit with BRT project around the area! As for ur SGR in Mombasa u probably don't know this is what happened u got right off cranes!
The faulty standard gauge railway (SGR) gantry cranes at the Mombasa port on Thursday, May 16, 2019. The port has been forced to rely on Kenya Ports Authority cranes to load SGR containers. PHOTO | KEVIN ODIT | NATION MEDIA GROUP
In Summary
- Documents seen by the Sunday Nation reveal that in December last year, KRC asked the Chinese SGR operator to ensure the six mounted cranes were in use.
- The Chinese appeared to have ignored the instructions prompting a letter in January this year to CRBC general manager for operation Li Jiuping with similar demands that has also not been responded to.
By ALLAN OLINGO
More by this Author
Six giant cranes installed at the port of Mombasa to improve the loading and unloading of containers on the Standard Gauge Railway (SGR) have never worked since they were brought in two years ago at a cost of Sh2 billion, the Sunday Nation can reveal.
SAFETY
The rail-mounted cranes at Port Reitz were bought by the China Road and Bridge Corporation as part of the controversial SGR operations and maintenance contract to handle cargo on the Mombasa-Nairobi SGR. However, according to sources at the port, the massive equipment malfunctioned before breaking down and being abandoned by the contractor. CRBC built and operates the Chinese-funded SGR, which is Kenya’s single largest investment.
Investigations by the Sunday Nation reveal that the SGR operations at the port now largely depend on the rubber-tyred gantry cranes and those owned by the Kenya Ports Authority with little or no explanation on why the multi-billion-shillings investment is sitting idle.
Even more puzzling is that CRBC appears to have ignored communication from the Kenya Railways Corporation (KRC) to ensure that the cranes are either replaced or put in use. Each of the cranes cost Sh355 million, a figure that has also raised questions.
A port official who was present when the cranes were first tested, but who spoke in confidence, said they dropped the containers and appeared out of control, raising safety concerns.
IGNORED
“CRBC was asked to fix the problem. They brought in experts from China who failed to resolve the issue. They seemed to have given up and abandoned them,” said our source at the port.
Despite tests and inspections by China Hoisting and Conveying Equipment Quality Supervision Centre, the suppliers, in the presence of CRBC and KRC representatives in mid-October last year, the cranes have still not been put to use, putting into doubt the viability of this investment at the expense of the taxpayer.
Documents seen by the Sunday Nation reveal that in December last year, KRC asked the Chinese SGR operator to ensure the six mounted cranes were in use. The Chinese appeared to have ignored the instructions prompting a letter in January this year to CRBC general manager for operation Li Jiuping with similar demands that has also not been responded to.
On Saturday, Mr Sandy Feng, a CRBC communications official, said the company was not in a position to address the issues raised over the usage of the cranes and referred us to KRC.
“We appreciate your concerns over this matter and the operation of the SGR. However, as for the question you have raised, we suggest that you reach out to Kenya Railways Corporation to get much of the information you are seeking,” Mr Feng said despite indications in our enquiry that his company was responsible for the procurement and operations of the cranes.
KRC did not immediately respond to the questions redirected to them. However, Transport Cabinet Secretary James Macharia admitted that the cranes have never been used due to their operational challenges, adding that the country should expect new cranes in the next few months.
TARGET
“The cranes will be replaced by CRBC. We had a meeting with them on Thursday and that was the agreement. The first two cranes are expected to be replaced in the next few weeks. I am made to understand that their shipment has already started. Eventually, we shall get new replacements for the six,” Mr Macharia told Sunday Nation.
The situation has now forced Kenya Ports Authority (KPA) to move in and use its cranes to perform the tasks that CRBC was supposed to have done, depending on eight rubber-tyred gantry cranes to assist in loading, offloading and movement of containers around the yard. The port agency has also distanced its self from the non-functioning cranes, saying they are just a host of the CRBC and KRC. KPA said its six Rail Mounted Gantry (RMG) Cranes manufactured in China by ZPMC Ltd are working.
“We have an RMG station with the six cranes providing loading zones namely lines Z4, Z7, Z8, Z9 and Z10, whereby Z4 and Z9 are dedicated for loading of dangerous cargo on SGR. From these loading zones, the cranes are used to load the bloc trains. Without these six RMGs at the loading zones, then we would not be able to attain our daily target of 10-12 trains,” Mr Bernard Osero, KPA Head of Corporate Affairs, said.
Puzzle of idle Sh2bn giant SGR cranes at Mombasa port
Each of the Chinese cranes cost Sh355 million, a figure that has raised questions.www.nation.co.ke
CC: Teargass n Kafrican
Pia yetu inaweza kuhumili mzigo mzito zaidi.Kafrican is trying to show how expensive is tz sgr compared to the one in Kenya, but he need to know the followings,
1. Electrification
Saying tz sgr is expensive because some of the expenses are covered by Tanesco, eg TL, this is wrong
Because Kenya sgr is not electrified, so if they want to electrify it they gonna incur more cost, they will need a TL and the catenaries so the cost will jump rapidly,
2. Continuous welded
Kenya sgr is not welded, welding it means more cost.
Taking into consideration the two facts above still tz have got a better deal, if Kenya want to meet the standard of tz sgr by eg electrifying and welding their sgr the cost will increase tremendously.
So let us compare the cost at the same level without including the cost of the things Kenya sgr don't have like electrification
Usilete data kama hizi unawaumiza jirani zetu japo ndo hali halisi,wamebakia kushikilia kwny stations badala ya mambo muhimu kabisa ambayo ni speed na uwezo wa treni kubeba mzigo.
kuna vtu ambavyo ni unnecessary kama lile liduara la plastiki pale Mombasa la nini wastage of money tu kwny kulijenga na kulimantain,utaskia imatch na theme,loool,weka urembo unapendezesha lkn una matokeo mengine chanya kwako
Ni bora wangewekeza kwenye railroad alignment na kufanya flash-butt,kwa ajili ya speed na kusmooth,Ni rahisi sana kujenga stations kuliko njia ya reli yenyewe.Ukikosea kwny kujenga njia ya reli imekula kwako mazima.Wachina waliwasoma wakenya vizuri na kugundua wanapenda sana kujimwambafai. Wakaona wakiwajengea vituo vikubwa, watapumbazwa na kupofushwa, wasimuone shetani aliyejificha kwenye maandishi ya mikataba.
Kabisa mkuu.Na huo mnara kama hauna msaada kwa port ya Mombasa ntashaanga zaidi.View attachment 1335050
Unaongelea hili?
i thought a control tower! Mweeh so ni urembo tu! au ndo mambo ya theme ya Mnazi ku-represent the Coast in Kenya!Yeah mkuu.Na huo mnara kama hauna msaada kwa port ya Mombasa ntashaanga zaidi.
🤣🤣 eti mnazi kwikwikwikwi itakuwa Control Tower.Leo wameenda wapi mbona kimya kbs au thread imesusiwa tena kama kule.i thought a control tower! Mweeh so ni urembo tu! au ndo mambo ya theme ya Mnazi ku-represent the Coast in Kenya!
The design speed for Kenya SGR in 200kph. Passenger locomotives can be changed to increase speed. Cargo speed isn't a big issue, since it's been on water for 1 month, 1 more hour saved isn't that urgent. Kenya isn't planning to carry heavy ore and minerals so I need for high axle load.
Let's start from the start. Where is that your train, we want to see it. How many kilometres has it covered?