At least you have spoken sense unlike that grandfather, Geza Ulole[emoji23][emoji23][emoji23]Wee ndio hujaelewa, unaonekana ni mwanafunzi mbaya, ngoja niandike kwa swahili ya huko Kenyaland.
Kwenye ujenzi wa SGR kuna transmission line yenye kubeba stima ya msongo mkubwa wenye Kv 220 kutoka kwenye power generation plants hadi kwenye SGR substations. Halafu kuna overheard catenary power line ambayo inachukua stima iliyopoozwa na substations kutoka msongo mkubwa kua msongo mdogo wa Kv 25 suitable kwa matumizi ya treni. Hizi catenary lines ndio zile unazoziona pale pembeni na juu ya reli kwa ajili ya kulisha train.
Sasa TANESCO wao kwa pesa zao wanajenga, wanamiliki transmission line na watatoa huduma za stima kutoka kwenye generation plant zao kupitia hio transmission line yao.
Budget ya ujenzi wa SGR kwa serikali inahusisha gharamia ujenzi wa reli, stations, catenary power lines na vitu vingine lakini sio transmission line.
Baada ya ujenzi kukamiika na shughuli kuanza, TRC watakua wananunua stima ya kendesha trani kutokaTANESCO.
Bantu-Gumborooo!!!!!Wee ndio hujaelewa, unaonekana ni mwanafunzi mbaya, ngoja niandike kwa swahili ya huko Kenyaland.
Kwenye ujenzi wa SGR kuna transmission line yenye kubeba stima ya msongo mkubwa wenye Kv 220 kutoka kwenye power generation plants hadi kwenye SGR substations. Halafu kuna overheard catenary power line ambayo inachukua stima iliyopoozwa na substations kutoka msongo mkubwa kua msongo mdogo wa Kv 25 suitable kwa matumizi ya treni. Hizi catenary lines ndio zile unazoziona pale pembeni na juu ya reli kwa ajili ya kulisha train.
Sasa TANESCO wao kwa pesa zao wanajenga, wanamiliki transmission line na watatoa huduma za stima kutoka kwenye generation plant zao kupitia hio transmission line yao.
Budget ya ujenzi wa SGR kwa serikali inahusisha gharamia ujenzi wa reli, stations, catenary power lines na vitu vingine lakini sio transmission line.
Baada ya ujenzi kukamiika na shughuli kuanza, TRC watakua wananunua stima ya kendesha trani kutokaTANESCO.
Bantu-Gumborooo!!!!!
Utoro ndio nini Bantu-Gumborooo?
Once again mna confuse mambo The transmission line is not the catenary line......hivi kwani wewe unapotumia stima hapo kwako ni nani mwenye wajibu wa kuhakikisha kuwa the transmission infrastructure ipo ili upate hio stima?
The SGR electricity transmission line will be build, owned and operated by TANESCO in such a way that TRC will be paying the cost of using electricity....However, the cost of installing catenary poles along the line will be covered by the government as part of the overall SGR build cost.
Once again mna confuse mambo The transmission line is not the catenary line....
The Catenary line is part of the project built by Yepi........ it is the one that would provide the overhead line 1m above the train. This is not the line that will be built and operated by TANESCO! this one belongs to yepi/TRC.
But that catenary line will need to be powered by a power source, so because of reliability issues TRC/YEPI requested TANESCO to build a separate transmission line along the route in order to provide reliable power along the route, this transmission line is separate from the catenary line.
As shown in the video, this is the TANESCO TL, without this TL the project would not be posible as said in the ESIA report by YEPI
And for the sake of saving time so we don't spend all day arguing from a confused point of view
these are the catenary lines, these one are in the $1.9B budget, no arguments here
While the first pic by TRC is the transmission line that will be exclusively used by the SGR
Here is another pic that shows the TL (which is not the catenary line)
View attachment 1332921
when complete the TL will look like this
without the TL, the centenary line would not get dedicated power to run the train, which would mean the substations will depend only on the power connection from the nearby town where the sub-station is located, that would mean if the local town experiences a blackout, the substation will have to be powered by generators in order to feed power to the catenery line. And hence the need for the TL which runs along the route providing dedicated power to every sub-station along the route.
This TL is the one that i'm saying is not part of the $1.9B project, its a separate project with a separate budget for which if the TL did not exists, the SGR would be very unreliable. So when you count the cost of your project,do'nt forget to add the cost o that TL.
Hebu rudia tena kusoma post zangu, I have explained to you all of that, punguza ujuaji...
Sent using Jamii Forums mobile app
Now tell us why should SGR Tanzania cover the cost of TL while Tanesco is legally binded to transmit power across Tanzania as a sole distributor of power?Once again mna confuse mambo The transmission line is not the catenary line....
The Catenary line is part of the project built by Yepi........ it is the one that would provide the overhead line 1m above the train. This is not the line that will be built and operated by TANESCO! this one belongs to yepi/TRC.
But that catenary line will need to be powered by a power source, so because of reliability issues TRC/YEPI requested TANESCO to build a separate transmission line along the route in order to provide reliable power along the route, this transmission line is separate from the catenary line.
As shown in the video, this is the TANESCO TL, without this TL the project would not be posible as said in the ESIA report by YEPI
And for the sake of saving time so we don't spend all day arguing from a confused point of view
these are the catenary lines, these one are in the $1.9B budget, no arguments here
While the first pic by TRC is the transmission line that will be exclusively used by the SGR
Here is another pic that shows the TL (which is not the catenary line)
View attachment 1332921
when complete the TL will look like this
without the TL, the centenary line would not get dedicated power to run the train, which would mean the substations will depend only on the power connection from the nearby town where the sub-station is located, that would mean if the local town experiences a blackout, the substation will have to be powered by generators in order to feed power to the catenery line. And hence the need for the TL which runs along the route providing dedicated power to every sub-station along the route.
This TL is the one that i'm saying is not part of the $1.9B project, its a separate project with a separate budget for which if the TL did not exists, the SGR would be very unreliable. So when you count the cost of your project,do'nt forget to add the cost o that TL.
This is not a question of who is the distributor of power in Tz, this is a question of who pays for a transmission line that is used by 1 single customer.Now tell us why should SGR Tanzania cover the cost of TL while Tanesco is legally binded to transmit power across Tanzania as a sole distributor of power?
But Tanzania Railways is a customer right? BTW the cost of Dar-Morogoro is $1.2 bln n not $1.9bln! $1.9bln is the cost for Morogoro to Makutupora! As we speak Tanesco is building not less than 4 TL across the country n longer than Dar-Moro!This is not a question of who is the distributor of power in Tz, this is a question of who pays for a transmission line that is used by 1 single customer.
TANESCO's job would have been to get power the SGR, e.g to Dar substation, pugu substation, ruvu substation....etc using existing power distribution lines found nearby - however they see fit.
However in this case, TANESCO was basically ordered to build a separate dedicated transmission line using its own money to be used exclusively by the SGR. Therefore the cost of building the TL can be added on top of the $1.9B project since no other customer can use the transmission line.
This is not a question of who is the distributor of power in Tz, this is a question of who pays for a transmission line that is used by 1 single customer.
TANESCO's job would have been to get power the SGR, e.g to Dar substation, pugu substation, ruvu substation....etc using existing power distribution lines found nearby - however they see fit.
However in this case, TANESCO was basically ordered to build a separate dedicated transmission line using its own money to be used exclusively by the SGR. Therefore the cost of building the TL can be added on top of the $1.9B project since no other customer can use the transmission line.
anajulikana maumivu ya kupigwa mradi wao wa mtambo wa chang'aa yanamfanya aanze kulazimisha mambo! BTW inaonekana daraja la Ruvu ni refu! Litakuwa na urefu gani in total? Maana structures zinazojengwa ni hatari!kwanza nakushauri punguza ujuaji kwanza!!
pili, una uhakika hio transmission line inajengwa exclusively kwa ajili ya SGR tu?? .. kukujuza mim ni engineer nipo kinyerezi! .. nakushauri punguza ujuaji!!
anajulikana maumivu ya kupigwa mradi wao wa mtambo wa chang'aa yanamfanya aanze kulazimisha mambo! BTW inaonekana daraja la Ruvu ni refu! Litakuwa na urefu gani in total? Maana structures zinazojengwa ni hatari!
Ohk sasa nimeelewa!sihusiki na ujenzi wa SGR ila partially nahusika na umeme wa Kinyerezi kwenda SGR.
Engineers tuliwahi kufanya ziara kutembelea huo mradi, eneo la Ruvu tuliambiwa kuna madaraja mengi yatajengwa hapo (sio daraja moja tu, ni madaraja mengi) ila total ya madara hayo yatakuwa zaidi ya kilometer 3
ukiangalia video ya Yerp.. hii picha ya chini inaonyesha eneo la Ruvu.. na hizo kilometers ni za eneo la Ruvu tu kweny madaraja
km 76+500 - 80+000 maana yake hilo eneo lipo kati km 76.5 na km 80.0 kutoka Dar es Salaam (0.0 km)
View attachment 1333152
Si nilikwambia mimi usubiri mwishowe tutaona ukweli, ukabaki ukinitukana ukisema sijui kitu. Nikakwambia mimi nilitoa information kutoka kwa ripoti ya Yepi kwahivyo ukinipinga ulikua unapinga ripoti ya yepi markezi wenyewe!!!!
NIlikwambia kwamba 220kv dedicated transmission line ya SGR haiko ndani ya ile $1.9B garama ya ujenzi wa SGR yenu inayojengwa na Yepi, Yepi wenyewe walisema hio garama iko kando, ya kwamba ni TANESCO ndo watajenga na kugaramia ...
Sasa angalia hii video kutoka kwa TRC wenyewe From 3:24 wanaonngelea kuhusu hio transmission line inayojengwa na TANESCO kutoka Dar hadi Moro.. Kumbuka hii ni dedicated line kwahivyo itatumika exclusively kwa SGR operations.
View attachment 1331787
Kutoka kwa ripoti ya Yepi
View attachment 1331795
---------------
Kwahivyo ukipiga hesabu zenu za ujenzi wa reli, kumbuka kando na hio $1.9B ya ujenzi bado kuna
1. Garama ya 220kv transmission line from Dar to Kingolwira
2. Garama ya vichwa 16 vya treni
3. Garama ya mabehewa 1,400
etc
Ukijumlisha hivyo vyote ambavyo kwa sasa hatujaambiwa gharama yake ndo utapata garama halisi ya SGR yenu!
Jamaa kaelezea vivyo hivyo we unarudia tu hapa..hivi kwa nini nyie wakenya mna kichwa ngumu kuelewa?Once again mna confuse mambo The transmission line is not the catenary line....
The Catenary line is part of the project built by Yepi........ it is the one that would provide the overhead line 1m above the train. This is not the line that will be built and operated by TANESCO! this one belongs to yepi/TRC.
But that catenary line will need to be powered by a power source, so because of reliability issues TRC/YEPI requested TANESCO to build a separate transmission line along the route in order to provide reliable power along the route, this transmission line is separate from the catenary line.
As shown in the video, this is the TANESCO TL, without this TL the project would not be posible as said in the ESIA report by YEPI
And for the sake of saving time so we don't spend all day arguing from a confused point of view
these are the catenary lines, these one are in the $1.9B budget, no arguments here
While the first pic by TRC is the transmission line that will be exclusively used by the SGR
Here is another pic that shows the TL (which is not the catenary line)
View attachment 1332921
when complete the TL will look like this
without the TL, the centenary line would not get dedicated power to run the train, which would mean the substations will depend only on the power connection from the nearby town where the sub-station is located, that would mean if the local town experiences a blackout, the substation will have to be powered by generators in order to feed power to the catenery line. And hence the need for the TL which runs along the route providing dedicated power to every sub-station along the route.
This TL is the one that i'm saying is not part of the $1.9B project, its a separate project with a separate budget for which if the TL did not exists, the SGR would be very unreliable. So when you count the cost of your project,do'nt forget to add the cost o that TL.