Geza Ulole
JF-Expert Member
- Oct 31, 2009
- 59,296
- 79,676
better in what ways ?? see my comment pleaseCorrupt kenya again. It means kenyans built theirs for $9m per km while ours will be $3.2 per km and Tanzanian road will be much better ie flyivovers will be included
Ikizinduliwa utatutag sio kuleta upussy hapa ya Tanzagiza.It's time again to look at the value for taxpayers' money in these two projects. Though three Chinese contractors i.e. Synohydro, Wu Yi n Shengli Engineering built Thika's 40 km Highway that claimed to be superhighway by Kenyans, Kibaha's 19 km Highway is to be built by native Tanzanians.
Tafuta renders zake,unaeza Cheka...kitu inakaa local sana...Ikizinduliwa utatutag sio kuleta upussy hapa ya Tanzagiza.
Tafuta renders zake,unaeza Cheka...kitu inakaa local sana...
Tafuta renders zake,unaeza Cheka...kitu inakaa local sana...
10 years ago n at $360 mln? N by Chinois? Again! 😂😩☝ wanawafinya kila mahala n yet mna-claim mna most skilled manpower in EA!You are comparing a 40kms road built 10yrs ago, with a road yet to be built... without even giving the specifications of the roads..
at least state main and service lanes, under-passes and overpasses , flyovers etc of the 2 roads..
Mchina anawagonga kila mahala!Umefikiria kama failed state....
Watu kama hao wa failed state lazima waweke Chinese wajenge ndio mradi isionekane local, ata kama chinese wanawaiba.
Si mnakumbuka mambo ya Chinese class 1 trains??
U mean thisYou are comparing a 40kms road built 10yrs ago, with a road yet to be built... without even giving the specifications of the roads..
at least state main and service lanes, under-passes and overpasses , flyovers etc of the 2 roads..
Ever seen he "superb-crakes" of the so called low cost UDSM "dormitories"? Think again, boss!It's time again to look at the value for taxpayers' money in these two projects. Though three Chinese contractors i.e. Synohydro, Wu Yi n Shengli Engineering built Thika's 40 km Highway that claimed to be superhighway by Kenyans, Kibaha's 19 km Highway is to be built by native Tanzanians.
U mean this
Duh! Geza Ulole this one is hideousMwonekano wa Upanuzi na Ujenzi wa barabara ya Morogoro kuanzia Kimara- Kibaha yenye urefu wa KM 19.2 itakayokuwa na njia 8
Thika road ni 6 lanes ukiondoa service roadswhy post one only
View attachment 972694
View attachment 972695
View attachment 972696
View attachment 972699
View attachment 972697
When your so called Highway is complete please post pics, not "Kuzindua" na "Kutenga pesa"