Ongoing projects in Kenya

Teargas

JF-Expert Member
Mar 28, 2021
12,805
16,543
There is a reason why Uhuru is the best performing President in East Africa when it comes to infrastructure. There's no President both past and present in the entire region that can stand shoulder to shoulder with Uhuru in this sector. Below are top 20 list of ongoing NATIONAL PROJECTS in Kenya.

1. LAPSSET $25B
2. KONZA CITY $14.5B
3. Galanà Kulalu $4.5B
4. TATU CITY $2.5M
5. ELDORET -NADEPAL -JUBA HIGHWAY $1B
6. Nothern Water Collector $743M
7. Expressway $650M
8. Thwake Dam $630M
Koru Soin Dam $400M
9. Mombasa Port expansion $320M
10. Mombasa -Mariakani Highway $298M
11. Kenol - Isiolo road $297M
12. Itare Dam $280M
13.Dongo Kundu phase 2 $250M
14. Karumenu Dam $240M
15. Thiba Dam $200M
16. Western Bypass $173M
17. Kipevu oil terminal $400M
 
kenya mikopo itawaua, kenya sold out believe or not
There is a reason why Uhuru is the best performing President in East Africa when it comes to infrastructure. There's no President both past and present in the entire region that can stand shoulder to shoulder with Uhuru in this sector. Below are top 20 list of ongoing NATIONAL PROJECTS in Kenya.

1. LAPSSET $25B
2. KONZA CITY $14.5B
3. Galanà Kulalu $4.5B
4. TATU CITY $2.5M
5. ELDORET -NADEPAL -JUBA HIGHWAY $1B
6. Nothern Water Collector $743M
7. Expressway $650M
8. Thwake Dam $630M
Koru Soin Dam $400M
9. Mombasa Port expansion $320M
10. Mombasa -Mariakani Highway $298M
11. Kenol - Isiolo road $297M
12. Itare Dam $280M
13.Dongo Kundu phase 2 $250M
14. Karumenu Dam $240M
15. Thiba Dam $200M
16. Western Bypass $173M
 
kenya mikopo itawaua, kenya sold out believe or not
That's why Kenya is ahead of Tanzania in everything except witchcraft and poverty. There is no country that can survive without loans in this era.
 
Kuna hii barabara sijaiona hapo
Busia-Siaya-Kisumu-Homa bay-Migori dual carriage highway (450 km)
Ishaanza kweli? I was only listing the ones that are ongoing costing more than $100M.
 
Hii iko under the LAPSSET project na ndio maana sijaitaja.

Yaani hii LAPSET bonge la mradi, utafunika sana huu...

Tujaribu sana kuwahi kwenye bandar ya Lamu maana Watanzania wameanza kuongea ongea kuhusu Bagamoyo, ambayo kiukweli ni yaani dah! ni bonge la show kama ukisoma mahesabu ya akina Zito Kabwe, hivyo tukamate soko mapema.
 
There is a reason why Uhuru is the best performing President in East Africa when it comes to infrastructure. There's no President both past and present in the entire region that can stand shoulder to shoulder with Uhuru in this sector. Below are top 20 list of ongoing NATIONAL PROJECTS in Kenya.

1. LAPSSET $25B
2. KONZA CITY $14.5B
3. Galanà Kulalu $4.5B
4. TATU CITY $2.5M
5. ELDORET -NADEPAL -JUBA HIGHWAY $1B
6. Nothern Water Collector $743M
7. Expressway $650M
8. Thwake Dam $630M
Koru Soin Dam $400M
9. Mombasa Port expansion $320M
10. Mombasa -Mariakani Highway $298M
11. Kenol - Isiolo road $297M
12. Itare Dam $280M
13.Dongo Kundu phase 2 $250M
14. Karumenu Dam $240M
15. Thiba Dam $200M
16. Western Bypass $173M
All loans right? BTW most of the projects r Kibaki's era!

VS

5 years JPM`s

  1. Kimara Kibaha superhighway,
  2. Magufuli Bus Terminal,
  3. Mwanza South Port slipway,
  4. The 4th largest hydropower project (Rufiji's JNHPP 2115 MW) in Africa!
  5. The construction of at least 20 Ship and ferries construction around the country's big lakes Mwanza, Lake Tanganyika, Lake Nyasa and Indian ocean for Mafia Island,
  6. Mpanda's Karema and Kigoma ports constructio and other 4 jettiesn along Lake Tanganyika,
  7. Rehabilitation of At least 4 jetties and ports in Lake Victoria,
  8. Brand new 4 port and jetties Lake Nyasa.
  9. The construction of lot 3 n 1 of SGR Dar to Mwanza,
  10. The construction of $300 mln JPM bridge Mwanza,
  11. The construction of PAX Terminal Mwanza airport, Kigoma Airport, Tabora Airport, Chato Airport.
  12. The construction of Government city Mtumba (Magufuli city),
  13. The construction of over 50 km of tarmac roads in Government city,
  14. The construction of ministries offices (phase II) after phase I,
  15. The construction of Ikulu at Chamwino,
  16. The Dodoma airport expansion and modernization project,
  17. The construction of Uhuru hospital Dodoma and access road,
  18. The construction of Government Agencies Headquarters in Dodoma e.g. Immigration, NEMC, Statistics Agency, Electroral Body, Tanroads, TPDF Headquarters, Police Headquarters, TARURA, TCCB n so many (over 20)!
  19. The construction of 92 hospitals and 400 health centers around the country (phase II current underway).
  20. Rehabilitation of government schools aside colleges and universities ( also new dormitories, libraries and lecture halls).
  21. The construction of several state of the art bus terminals around the country (around 20).
  22. The construction of state of the art slaughter houses and markets around the country (around 15).
  23. The rehabilitation and expansion of Tanga and Mtwara ports,
  24. Rehabilitation of Tanga-Moshi-Arusha MGR rehabilitation? Aside rehabilitation of at least 600 wagons and 20 engines! While a procurement of at least brand new 37 PAX coaches and 800 cargo wagons.
  25. The installation of at least 4 state of the art radars aside a purchase of at least 12 brand new aircraft!
  26. At least 2 gold refinery by STAMICO n at least 20 mineral trading centers around the country! Aside several factories by GoT agencies and parastatals from Karanga leather factory to NSSF Mkulazi sugar factory to cotton ginneries and so many!
  27. Government civil servants houses esp. for police, army and other government officials undes NHC, NSSF, PSPF like Watumishi Housing,
  28. Dodoma's city Hotel, shopping center, Trucks parking area, Dodoma Football stadium(in planning) n Dodoma city recreation park,
  29. Several TPA ICDs in Kwala, Kigoma, Mbeya n Dodoma,
  30. New Headquarters for PAPU in Arusha, new TBC Headquarters in Dar and soon in Dodoma,
  31. New state of the art national health laboratory for infectious disease, DAWASA, TBS in Dar.
 
All loans right? BTW most of the projects r Kibaki's era!
You will continue crying about loans wakati is moving forward. Those loans have made Kenya to be the country with the best infrastructure in the region. All the projects in that list were initiated by Uhuru except Lamu Port, Konza City and Tatu City. You can add any project was not initiated by Uhuru and is in the list.
 
Na huwezi skia wakenya wakimuabudu uhuru
Kwanza wanamkashifu
Kwingine mtu anafanya kitu kidogo anaitwa mtakatifu.
Na in reality ameiba nchi kurukaa
In Tanzania mtu anajenga interchange moja then imediately he becomes a god. Five years of Magufuli could not even rival one year of uhuru's term when it comes to development.
 
There is a reason why Uhuru is the best performing President in East Africa when it comes to infrastructure. There's no President both past and present in the entire region that can stand shoulder to shoulder with Uhuru in this sector. Below are top 20 list of ongoing NATIONAL PROJECTS in Kenya.

1. LAPSSET $25B
2. KONZA CITY $14.5B
3. Galanà Kulalu $4.5B
4. TATU CITY $2.5M
5. ELDORET -NADEPAL -JUBA HIGHWAY $1B
6. Nothern Water Collector $743M
7. Expressway $650M
8. Thwake Dam $630M
Koru Soin Dam $400M
9. Mombasa Port expansion $320M
10. Mombasa -Mariakani Highway $298M
11. Kenol - Isiolo road $297M
12. Itare Dam $280M
13.Dongo Kundu phase 2 $250M
14. Karumenu Dam $240M
15. Thiba Dam $200M
16. Western Bypass $173M
17. Kipevu oil terminal $400M
Eti konza city $25b
Hehehe, mkishanusa gundi huko majalalani mnakuwa wehu kama mbuzi
 
Eti konza city $25b
Hehehe, mkishanusa gundi huko majalalani mnakuwa wehu kama mbuzi
Hakuna tofauti kati yako na mbuzi. You are even smelling alike. No wapi penye nimeandika Konza $25B na hata kama ni 25 shida iko wapi? Ni project ya Tanzania ama Kenya. Nyinyi endeleeni kungoja Kawe City which will never get built.
 
Hakuna tofauti kati yako na mbuzi. You are even smelling alike. No wapi penye nimeandika Konza $25B na hata kama ni 25 shida iko wapi? Ni project ya Tanzania ama Kenya. Nyinyi endeleeni kungoja Kawe City which will never get built.
Umekasirika sana
 
Na huwezi skia wakenya wakimuabudu uhuru
Kwanza wanamkashifu
Kwingine mtu anafanya kitu kidogo anaitwa mtakatifu.
Na in reality ameiba nchi kurukaa
Umelishwa tango pori kama mtoto wa kike anavyolishwa dudu....umebaki kunyonya ndude tu you can't think
 
There is a reason why Uhuru is the best performing President in East Africa when it comes to infrastructure. There's no President both past and present in the entire region that can stand shoulder to shoulder with Uhuru in this sector. Below are top 20 list of ongoing NATIONAL PROJECTS in Kenya.

1. LAPSSET $25B
2. KONZA CITY $14.5B
3. Galanà Kulalu $4.5B
4. TATU CITY $2.5M
5. ELDORET -NADEPAL -JUBA HIGHWAY $1B
6. Nothern Water Collector $743M
7. Expressway $650M
8. Thwake Dam $630M
Koru Soin Dam $400M
9. Mombasa Port expansion $320M
10. Mombasa -Mariakani Highway $298M
11. Kenol - Isiolo road $297M
12. Itare Dam $280M
13.Dongo Kundu phase 2 $250M
14. Karumenu Dam $240M
15. Thiba Dam $200M
16. Western Bypass $173M
17. Kipevu oil terminal $400M
Gundi iliyochanganywa na ugoro!
 
Back
Top Bottom