Halafu kumbe mradi mkubwa kabisa wa powerline katika historia ya Tanzania ni hii 400 KV Namanga-Singida transmission line. Ndio maana mnaitangaza sana hata niliona video ya Tanesco kuihusu kwenye youtube. Sisi huku Kenya hatusifu mradi huo licha ya kwamba mradi huo pia upo kwetu. Sisi tuna 400 KV lines kadhaa zilizokamilika tayari na nyinyi hamna 400 KV hata moja iliyokamilika. Nionyeshe mradi wowote wa 400 KV iliyokamilika huko TZ na usitaje Namanga-Singida. Huoni aibu kujaribu kucompare Kenya na Tanzania? Isitoshe Nairobi tuna underground electricity cable inayozunguka Nairobi. Inaitwa Nairobi ring underground cable. This is the only underground electricity cable in East Africa surrounding a city.It depends on what u want to achieve! Get the basics first! From ur DC interconnector grid with Ethiopia u will not be able to sell power to Ethiopia whereas for us we can buy and sell to our neighbors! Whether DC or AC i believe none of the countries will buy power from Kenya as it is way expensive than what Ethiopia and Tanzania will offer in through these interconnector powergrids i.e. EAPP and SAPP.
BTW it is possible to covert AC to DC!
Halafu kumbe mradi mkubwa kabisa wa powerline katika historia ya Tanzania ni hii 400 KV Namanga-Singida transmission line. Ndio maana mnaitangaza sana hata niliona video ya Tanesco kuihusu kwenye youtube. Sisi huku Kenya hatusifu mradi huo licha ya kwamba mradi huo pia upo kwetu. Sisi tuna 400 KV lines kadhaa zilizokamilika tayari na nyinyi hamna 400 KV hata moja iliyokamilika. Nionyeshe mradi wowote wa 400 KV iliyokamilika huko TZ na usitaje Namanga-Singida. Huoni aibu kujaribu kucompare Kenya na Tanzania? Isitoshe Nairobi tuna underground electricity cable inayozunguka Nairobi. Inaitwa Nairobi ring underground cable. This is the only underground electricity cable in East Africa surrounding a city.
Google Dar-Zanzibar interconnector, then Mwanza-Ukerewe interconnector! Hivyo ni vitu tumeafanya miaka mingi tena undersea power cables!Halafu kumbe mradi mkubwa kabisa wa powerline katika historia ya Tanzania ni hii 400 KV Namanga-Singida transmission line. Ndio maana mnaitangaza sana hata niliona video ya Tanesco kuihusu kwenye youtube. Sisi huku Kenya hatusifu mradi huo licha ya kwamba mradi huo pia upo kwetu. Sisi tuna 400 KV lines kadhaa zilizokamilika tayari na nyinyi hamna 400 KV hata moja iliyokamilika. Nionyeshe mradi wowote wa 400 KV iliyokamilika huko TZ na usitaje Namanga-Singida. Huoni aibu kujaribu kucompare Kenya na Tanzania? Isitoshe Nairobi tuna underground electricity cable inayozunguka Nairobi. Inaitwa Nairobi ring underground cable. This is the only underground electricity cable in East Africa surrounding a city.
[emoji1787][emoji1787][emoji1787][emoji1787] wazee wa only , mega city,mega project...Halafu kumbe mradi mkubwa kabisa wa powerline katika historia ya Tanzania ni hii 400 KV Namanga-Singida transmission line. Ndio maana mnaitangaza sana hata niliona video ya Tanesco kuihusu kwenye youtube. Sisi huku Kenya hatusifu mradi huo licha ya kwamba mradi huo pia upo kwetu. Sisi tuna 400 KV lines kadhaa zilizokamilika tayari na nyinyi hamna 400 KV hata moja iliyokamilika. Nionyeshe mradi wowote wa 400 KV iliyokamilika huko TZ na usitaje Namanga-Singida. Huoni aibu kujaribu kucompare Kenya na Tanzania? Isitoshe Nairobi tuna underground electricity cable inayozunguka Nairobi. Inaitwa Nairobi ring underground cable. This is the only underground electricity cable in East Africa surrounding a city.
Umesahau Multi billion & multi million [emoji23][emoji23][emoji23][emoji1787][emoji1787][emoji1787][emoji1787] wazee wa only , mega city,mega project...
tunakuchora kisha tuna kuzoom halafu tunakucheka mwisho tunakudharau
Naona kwenye mambo ya kupanga mpo sawa yaani mipango za siku za usoni mpo vizuri zaidi. Pengine hata mumetushinda kwenye future plans. Lakini kwenye miradi zilizokamilika nadhani tumewashinda. Nyinyi mumeunda 5,896 km za nyaya ya umeme. Wacha nitafute kilomita za nyaya za Kenya zilizokamilika niweke hapa.Ukinionyesha miradi kama hii Kenya on Transmission line and systems, nahama! I challenge u!
TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.
TANESCO’s Future Plan( most r being carried out in 2021)
- TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha - Namanga transmission line,
- 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo,
- 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro,
- 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line,
- 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line,
- 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line),
- 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations. Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti and associated substation at Kibiti,
- 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga,
- 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga,
- 620km, 400kV line from Iringa - Kisada – Mbeya – Tunduma - Sumbawanga,
- 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,
- 414km of 220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations .
most of the projects r U/C even the transmission line btn Morogoro and Makutupora (414km of 220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations ) is already in procurement stages!Naona kwenye mambo ya kupanga mpo sawa yaani mipango za siku za usoni mpo vizuri zaidi. Pengine hata mumetushinda kwenye future plans. Lakini kwenye miradi zilizokamilika nadhani tumewashinda. Nyinyi mumeunda 5,896 km za nyaya ya umeme. Wacha nitafute kilomita za nyaya za Kenya zilizokamilika niweke hapa.
Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.
Wewe kaa kando watu wazima wazungumze. Nenda kacheze na watoto wenzako huko nje. Hiki ni kikao cha watu wazima.[emoji1787][emoji1787][emoji1787][emoji1787] wazee wa only , mega city,mega project...
tunakuchora kisha tuna kuzoom halafu tunakucheka mwisho tunakudharau
Naona kwenye mambo ya kupanga mpo sawa yaani mipango za siku za usoni mpo vizuri zaidi. Pengine hata mumetushinda kwenye future plans. Lakini kwenye miradi zilizokamilika nadhani tumewashinda. Nyinyi mumeunda 5,896 km za nyaya ya umeme. Wacha nitafute kilomita za nyaya za Kenya zilizokamilika niweke hapa.
Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.
international, state of the art, super etc😀Umesahau Multi billion & multi million [emoji23][emoji23][emoji23]
Mkunya, producer is irrelevant if u can't sell what u produce!Naona inawauma sana Malazy kwamba Kenya sisi ni the biggest producer of geothermal power in Africa and also the biggest producer of windpower in Africa. Inauma lakini itabidi mzoee. Saa hii tuna the only DC powerline in Africa.
Mkunya, producer is irrelevant if u can't sell what u produce!
View attachment 1805981
View attachment 1805982
Huna mood kwa sababu tumewashinda?huyu achana nae.. mim nipo moja ya power plants za tanesco.. kwenye transmission line za mikondo yoyote hawajatuzidi hata sekunde moja.. ni vile tu sipo na mood leo
Yaani mshikaji amekuwa mjinga sana vitu anavyo-post siku hizi ni kama kuringia ati wana DC transmission line bila kujua kuwa na AC au DC inategemea usage specifications! Amekuwa Mpumbavu kweli yaani kila anachoropoka anagundua si kitu cha maana na Tanzania inafanya zaidi yao!huyu achana nae.. mim nipo moja ya power plants za tanesco.. kwenye transmission line za mikondo yoyote hawajatuzidi hata sekunde moja.. ni vile tu sipo na mood leo
Hii umechomoa huko nyuma mkunya?Huna mood kwa sababu tumewashinda?
Ukinionyesha miradi kama hii Kenya on Transmission line and systems, nahama! I challenge u!
TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.
TANESCO’s Future Plan( most r being carried out in 2021)
- TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha - Namanga transmission line,
- 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo,
- 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro,
- 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line,
- 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line,
- 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line),
- 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations. Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti and associated substation at Kibiti,
- 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga,
- 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga,
- 620km, 400kV line from Iringa - Kisada – Mbeya – Tunduma - Sumbawanga,
- 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,
- 414km of 220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations .
UPDATED LIST
a) 400kV Transmission Lines
1) 400kV Iringa-Shinyanga TL (670km)
2) 400kV Mbeya-Iringa TL (350km)
- Iringa SS
- Dodoma SS
- Singida SS
- Shinyanga SS
3) 400kV Mbeya-Nyakanazi TL (1148km)
- Mbeya SS
- Kisada SS
- Iringa SS
3) 400kV Nyakanaz-Kigoma TL (280km)
- Mbeya SS
- Tunduma SS
- Sumbawanga SS
- Mpanda SS
- Kigoma SS
- Nyakanazi SS
4) 400kV Dar es Salaam-Dodoma TL (451km)
5) 400kV Tabora-Katavi TL (132km)
6) 400 kV Somanga- Kinyerezi TL (198km)
7) 400kV Somanga-Mtwara TL (253km)
8) 400kV Rufiji-Chalinze TL (162km)
9) 400kV Chalinze-Dodoma TL (350km)
10) 400kV Dar es Salaam (K)-Arusha TL (682km)
11) 400kV Singida-Namanga(Ar) TL (414.4km)
12) 400kV Njombe-Kisada TL (170km)
13) 400kV Tanzania-Mozambique TL
14) 400kV Mtwara-Songea TL
b) 220kV Transmssion Lines
220kV Ubungo-Morogoro TL (172km)
220kV Ubungo-Morogoro TL (179km)
220kV Kidatu-Morogoro 1 TL (116km)
220kV Kidatu-Morogoro 2 TL (130km)
220kV Kidatu-Iringa TL (160km)
220kV Iringa-Mufindi TL (130km)
220kV Mufindi-Mbeya TL
220kV Bulyanhulu-Geita TL (55km)
220kV Masaka-Mwanza TL (640km)
220kV Somanga-Kinyerezi TL (198km)
220kV Ubungo-Kinyerezi TL (15km)
220kV Mlandizi-Zinga TL (15km)
220kV Somanga-Lindi TL (154km)
220kV Mtwara-Songea TL (656km)
220kV Iringa-Dodoma TL (237km)
220kV Dodoma-Singida TL (210km)
220kV Singida-Arusha TL (212km)
220kV Singida-Shinyanga TL (200km)
220kV Shinyanga-Buzwagi TL (100km)
220kV Shinyanga-Mwanza TL (140km)
220kV Mwanza-Bulyanhulu TL (129.46km)
220kV Kihansi-Iringa TL (95.23km)
220kV Kihansi-Kidatu TL (180km)
220kV Kyaka-Nyakanazi TL (232km)
220kV Geita-Nyakanazi TL (144km)
220kV Rusumo-Nyakanazi TL (98.2km)
220kV Makambako-Songea TL (250km)
220kV Ibadakuli-Mwanza TL
- Madaba SS
- Songea SS
- Makambako SS
220kV Ibadakuli-Bulyanhulu TL
220kV Ibadakuli-Buzwagi TL
220kV Kibaha-Bagamoyo TL
220kV Kinyerezi-Morogoro TL (existing line)
220kV Kinyerezi-Morogoro/Kingolwira TL (SGR 1)
220kV Morogoro-Makutupora TL (414km, SGR 2)
- Pugu SS
- Ruvu SS
- Kidugalo SS
- Kingolwira SS
c) 132kV Transmission Lines
132kV Ibadakuli-Tabora TL
132kV Mtwara-Mahumbika TL (80km)
132kV Ubungo-Mbagala TL
132kV Ubungo-Gongo la Mboto TL
- Ubungo SS
- Kurasini SS
- Mbagala SS
132kV Tabora-Kigoma TL (395.1km)
- Ubungo SS
- Kipawa SS
- Gongo la Mboto SS
132kV Kurasini-Kigamboni TL (13.95km)
132kV Ubungo-Chalinze TL (97km)
132kV Chalinze-Morogoro TL (82km)
132kV Chalinze-Hale TL (175km)
132kV Pangani Fall-Hale TL (8.5km)
132kV Hale-Tanga TL (60km)
132kV Hale-Same TL (173km)
132kV Same-Kimungi TL (102km)
132kV Kimungi-Arusha TL (70km)
132kV Mwanza-Musoma TL (210km)
132kV Shinyanga-Tabora TL (203km)
132kV Musoma-Nyamongo TL (100km)
132kV Ubungo-Kunduchi/Tegeta TL (41km)
132kV Kunduchi-Zanzibar (Marine Cable) (38km)
132kV Ubungo-Mtoni TL
132kV Ubungo-Ilala 1 TL (11km)
132kV Ubungo-Ilala 2 TL (11km)
132kV Mtukula-Bukoba TL (84km)
132kV Tabora-Katavi TL (381km)
132kV Tabora-Kigoma TL (395km)
Afu mtu anasema tuna shida ya usambazi! Na Tanzania ilivyokubwa!!!
[emoji1787][emoji1787][emoji1787] ni wanavituko sana mkuuUmesahau Multi billion & multi million [emoji23][emoji23][emoji23]
Mzee wa Only,,,,,,Wewe kaa kando watu wazima wazungumze. Nenda kacheze na watoto wenzako huko nje. Hiki ni kikao cha watu wazima.
In Kenya Generation, Transmission na Distribution zimegawanywa Kila moja inafanywa na specific state company. Kengen, Kentraco, Kenya power all have their own network of power lines so you will have to combine them together. While in Tz everything is TANESCO.Naona kwenye mambo ya kupanga mpo sawa yaani mipango za siku za usoni mpo vizuri zaidi. Pengine hata mumetushinda kwenye future plans. Lakini kwenye miradi zilizokamilika nadhani tumewashinda. Nyinyi mumeunda 5,896 km za nyaya ya umeme. Wacha nitafute kilomita za nyaya za Kenya zilizokamilika niweke hapa.
Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.