Tanzania is to upgrade the current largest data center in EA to a tier a 4 with a completion of Dar-Dodoma-Makutupora SGR! Tanzania has had tier 3 national internet data center since 2017!
MY TAKE
Mind u a second Transmission Line from Dar to Mwanza is being constructed and since the SGR will use high tech signalling and train control ETCS level 2 the data center will have to be linked to NIDC.
MY TAKE
Mind u a second Transmission Line from Dar to Mwanza is being constructed and since the SGR will use high tech signalling and train control ETCS level 2 the data center will have to be linked to NIDC.