wakuu nahitaji msaada namna ya kufunga single phase change over switch nina contractor na auxiliary Generator yangu ina supply 6kVA ni portable generator ni install vp hii change over switch msaada pls
 
contractor au contactor...kama una contactor yabidi uweke auto back up system otherwise unatumia iyo chang over switch kwa manual....kwa single phase angalia vizuri ina 2inputs..one frm genset n ingine frm tanesco...na 1output going to the load @fed with L and N
 

na je ukitaka kufunga na contactor?
 
kwa contactor utatengeneza automatic change over switch..apo inabidi contactor iwe na ampacity kubwa kuliko amperage ya load yako na generator lazima iwe ya electric start..sio za recoil start...
 
Ni electrical start mkuu apo kwenye ampcity kubwa kuliko load sijakupata poa maelezo zaidi,nashukuru
 
kwa contactor utatengeneza automatic change over switch..apo inabidi contactor iwe na ampacity kubwa kuliko amperage ya load yako na generator lazima iwe ya electric start..sio za recoil start...

Ni electrical start mkuu apo kwenye ampcity kubwa kuliko load sijakupata poa maelezo zaidi,nashukuru
 
kama una loads say fan ya 2A..lighting ya 3A..kettle ya 5A..makes a total ya 10A iyo ni amperage au siyo..ampacity ya contactor yako iwe above 10A..labda 15A ivi..kila contactor ina label kwa pembeni kuonesha rating yake...umesema ni electric start ya aina gani 2wire au 3wire..ya 2 wire ni ile yenye on/off toggle switch..yaani unawasha na kuzima tu no other complication..ya 3wire una modes 3 yaani off,start na run mode....kama ni ya 2wire..then connection ni straight forward..ila kama ni ya 3wire..unabadili kua 2wire kwanza...
 
ni ya 3 wire mkuu hapo nabadili vipi
 