Hello Great thinkers!
I am looking to sub-contract the finishing of a 2-storey, 4 bedroom Residential house with a total building gross area of 256.5 sqm.
The superstructure of the house is scheduled to be complete in 1 month; when done the work done would be 1) Substructure (Foundation), Frame, Walling, Roofing.
Work required to be complete includes:
[TABLE="width: 298"]
[TR]
[TD]# Windows and Exterior Doors[/TD]
[/TR]
[TR]
[TD]# Plumbing, Mechanical, and Electrical Roughs[/TD]
[/TR]
[TR]
[TD]# Exterior Trim[/TD]
[/TR]
[TR]
[TD]# Insulation and Drywall[/TD]
[/TR]
[TR]
[TD]# Interior Doors and Trim[/TD]
[/TR]
[TR]
[TD]# Cabinets, Tile, and Glass[/TD]
[/TR]
[TR]
[TD]# Painting, Paper, and Floor Coverings[/TD]
[/TR]
[TR]
[TD]# Hardware, Equipment, and Fixtures[/TD]
[/TR]
[TR]
[TD]# Finish Plumbing, Mechanical, and Electrical[/TD]
[/TR]
[TR]
[TD]# Finish Grading and Landscaping[/TD]
[/TR]
[/TABLE]
The Total Budget for the above mentioned work excluding the Grading & Landscaping is TZS 60 million which includes Labour, Material, Supervision, Sub-Contractors fees.
If you are interested in pursuing or proposing for this project; please email me the following to saronga112@yahoo.co.uk:
I am looking to sub-contract the finishing of a 2-storey, 4 bedroom Residential house with a total building gross area of 256.5 sqm.
The superstructure of the house is scheduled to be complete in 1 month; when done the work done would be 1) Substructure (Foundation), Frame, Walling, Roofing.
Work required to be complete includes:
[TABLE="width: 298"]
[TR]
[TD]# Windows and Exterior Doors[/TD]
[/TR]
[TR]
[TD]# Plumbing, Mechanical, and Electrical Roughs[/TD]
[/TR]
[TR]
[TD]# Exterior Trim[/TD]
[/TR]
[TR]
[TD]# Insulation and Drywall[/TD]
[/TR]
[TR]
[TD]# Interior Doors and Trim[/TD]
[/TR]
[TR]
[TD]# Cabinets, Tile, and Glass[/TD]
[/TR]
[TR]
[TD]# Painting, Paper, and Floor Coverings[/TD]
[/TR]
[TR]
[TD]# Hardware, Equipment, and Fixtures[/TD]
[/TR]
[TR]
[TD]# Finish Plumbing, Mechanical, and Electrical[/TD]
[/TR]
[TR]
[TD]# Finish Grading and Landscaping[/TD]
[/TR]
[/TABLE]
The Total Budget for the above mentioned work excluding the Grading & Landscaping is TZS 60 million which includes Labour, Material, Supervision, Sub-Contractors fees.
If you are interested in pursuing or proposing for this project; please email me the following to saronga112@yahoo.co.uk:
- Your profile and standard work approach.
- Work done or Projects done with references.
- Company profile if possible.
- Contact Details.