Your SGR is inferior, do you know why your trains will only be capable of doing 590 passengers per one way compared to Kenya's 1,440? Do you know why your freight train will do a maximum of 17M tonnes compared to Kenya's 22M?
Chinese-built modern railway in Kenya celebrates 1,500 days of safe operation
By Xinhua - Global TimesPublished: Jul 11, 2021 06:23 PM
Employees walk along the Mombasa-Nairobi Railway in Nairobi on March 22. Photos: Xinhua
The Chinese-built standard-gauge railway (SGR) linking Kenya's port city Mombasa to its capital Nairobi witnessed 1,500 days of safe operation on Friday, a milestone marking the achievements of joint development between China and African countries via the Belt and Road Initiative.
A statement from the SGR operator released in Nairobi on Friday said the modern train service has been at the forefront of Kenya's socio-economic transformation in the last four years since its operationalization, the Xinhua News Agency reported on Saturday.
"SGR's transportation indicators and its increasingly important social significance have also earned the approval of freight owners and passengers," said Africa Star Railway Operation Company Limited (AfriStar) that operates the SGR.
The Mombasa-Nairobi Railway connects Nairobi, the capital of Kenya, and Mombasa, the largest port in East Africa, with a total length of about 480 kilometers. It is a modern railway constructed with Chinese standards, Chinese technology, and Chinese equipment.
According to AfriStar, the Mombasa-Nairobi SGR is also boosting Kenya's fight against the COVID-19 pandemic by ensuring that delivery of critical supplies is not interrupted.
A total of 5,415,000 passengers have been ferried between Nairobi and Mombasa in the last 1,500 days since the SGR commenced operations and the operator estimates 1.8 million commuters could use the service this year, according to Xinhua.
The operator said 1,500 days marked safe, efficient, and quality operation of both the SGR passenger and cargo service. But the operator still considers enhancing safety as the key work of the railway operation.
Staff members have been trained to ensure risk to the passenger and cargo is mitigated to the lowest level possible.
"Through case education on railway accidents in China and other countries, staff safety awareness and quality are greatly enhanced," said the operator.
According to AfriStar, the staff has been trained to boost the safety of equipment and enforce environmental protection measures along the SGR corridor that include pristine wildlife sanctuaries.
The operator has developed guidelines to boost the safety of railway operations and in 2020 alone spent $2.8 million to improve public security through the acquisition of cutting-edge technology and hiring of personnel.
The Mombasa-Nairobi SGR, which replaced the meter-gauge railway that was constructed more than 100 years ago during British colonial rule, has been an important product that came out of the China-proposed Belt and Road Initiative and the Forum on China-Africa Cooperation held in Johannesburg, South Africa, in late 2015.
The Mombasa-Nairobi SGR is the first step in the grand plan to build an East Africa railway network that will eventually link Kenya with Uganda, Rwanda, Burundi and South Sudan.
Burundi and South Sudan.
[IMG alt="An outside view of the Nairobi Terminus
in Kenya Photos: Xinhua"]https://www.globaltimes.cn/Portals/...5f3126-df89-42e3-8af0-17a05466eea2.jpeg[/IMG]
An outside view of the Nairobi Terminus in Kenya Photos: Xinhua
Yang Ming, a Chinese train driver of the Mombasa-Nairobi Railway, and his Kenyan apprentice check the condition of the train before its departure on Saturday. Photos: Xinhua
A view of the Mombasa-Nairobi Railway in Kenya Photos: Xinhua
Xinhua - Global Times
MY TAKE
Kuna mpumbavu alikuwa anadai SGR Kenya inabeba 3 mln PAX per year hapa inasema around 1.6 mln PAX yearly!
ngoja niende kimathematically
1500 days/366days = 4.098 years = 4 yrs and 36 days
imesafirisha abiria 5.4 mil for 1500days (4 yrs)
kwa mwaka ni 5.4mil/4 yrs = 1.35 mil
kwa kipindi cha miaka minne imesafirisha abiria kwa wastan wa 1.35 mil kwa mwaka mmoja.. range ya deviation tuseme ni 0.3mil..
kwamba maximum inaweza kuwa imesafirisha 1.65 mil na minimum ni 1.05 mil kwa mwaka
na pia wanasema wana estimate watabeba 1.8 mil kwa mwaka huu wa sasa.
kwenye maneno yao 10, usichukue hata moja [emoji23]
nawasilisha!!!
You talk like a layman, the passengers number is determined by the the length of trains multiplied by the number of trips they make, most of electric trains do around 300 passengers per one way while Diesel trains can do up to 1,440 per one way like the one in Kenya. So tell me, which train will do more passengers at the end of the year? Like for the case of Kenya, the trains do 8,000 passengers per day.
I'm sorry to inform you that your SGR is designed to carry 1,100,000 passengers per year compared to Kenya's which is doing 3,000,000 passengers per year.
Delivery 2024!!!Hyundai Contracted To Deliver SGR Project To Benefit Tanzania, Rwanda
ByDaniel Sabiiti July 11, 2021 at 6:47 pm
A Hyundai Rotem train
A South Korea-based company, Hyundai Rotem has secured contracts worth $295.65m from Tanzania Railways Corporation (TRC) to deliver eco-friendly train cars.
TRC will receive 80 train cars worth $190.12m and 17 electric locomotives worth $105.53m from Hyundai Rotem, which are expected to be delivered by 2024.
As part of the Standard Gauge Railway (SGR) line project which will connect to Rwanda, the new train cars will operate on a 546km high-speed electric line spanning between Dar es Salaam and Makutupora.
Tanzania has invested around $7bn in the SGR project and expected to work on a 673km range which will connect Makutupora, Tabora, Isaka and Mwanza
The SGR project is a regional project which is also expected to connect Rwanda, Burundi and DR Congo to boost regional trade and business amongst the member states.
Rwanda is still waiting for the project to reach Isaka (dry port) side to kick start its construction activities that will connect the Rwandan capital Kigali, a move in which government in June 2021 reassured Tanzania of speedy execution of the projects.
Sources within the ministry of infrastructure indicate that the SGR project is still under discussion on investments needed but Rwanda is expected to invest more than $1.3billion to connect 521km from Isaka to Kigali.
Hyundai Rotem is an affiliate of Hyundai Motor Group, which has Hyundai Motor and Kia under its business control.
Contact the Author:
@DanielSabiiti
Hyundai Contracted to Deliver SGR Project to Benefit Tanzania, Rwanda - KT PRESS
A South Korea-based company, Hyundai Rotem has secured contracts worth $295.65m from Tanzania Railways Corporation (TRC) to deliver eco-friendly train cars. TRC will receive 80 train cars worth $190.12m and…www.ktpress.rw
So will that stop Rwanda from joining their electrical SGR at Isaka from Kigali? BTW the report says the electric trains (80 trainscars and 17 locomotives) will be delivered "by 2024"! That means there will be caoming in phases before 2024 while the last delivery will be by 2024!Delivery 2024!!!
Journalists maembe wa Tanzania vitu kama hizi ata hawawezi fuatilia wajue ukweli!!!
Usisahau a from March to August then Sept to November 2020 haikubeba ata nzingoja niende kimathematically
1500 days/366days = 4.098 years = 4 yrs and 36 days
imesafirisha abiria 5.4 mil for 1500days (4 yrs)
kwa mwaka ni 5.4mil/4 yrs = 1.35 mil
kwa kipindi cha miaka minne imesafirisha abiria kwa wastan wa 1.35 mil kwa mwaka mmoja.. range ya deviation tuseme ni 0.3mil..
kwamba maximum inaweza kuwa imesafirisha 1.65 mil na minimum ni 1.05 mil kwa mwaka
na pia wanasema wana estimate watabeba 1.8 mil kwa mwaka huu wa sasa.
kwenye maneno yao 10, usichukue hata moja [emoji23]
nawasilisha!!!
First delivery Ni 2024.So will that stop Rwanda from joining their electrical SGR at Isaka from Kigali? BTW the report says the electric trains (80 trainscars and 17 locomotives) will be delivered "by 2024"! That means there will be caoming in phases before 2024 while the last delivery will be by 2024!
Kizungu kinakupiga chenga!First delivery Ni 2024.
Hata service ya double stack wamesuspend hakuna mizigoUsisahau a from March to August then Sept to November 2020 haikubeba ata nzi
no time was ur SGR stopped!Usisahau a from March to August then Sept to November 2020 haikubeba ata nzi
siku kitu cha Hyundai Rotem electric train kinashushwa utahama humu ndani!First delivery Ni 2024.
siku kitu cha Hyundai Rotem electric train kinashushwa utahama humu ndani!
Ichoboy anasema chukua moja uende zako, ila imebainika hata hilo moja pia usichukue [emoji1787][emoji1787][emoji1787][emoji1787][emoji1787]ngoja niende kimathematically
1500 days/366days = 4.098 years = 4 yrs and 36 days
imesafirisha abiria 5.4 mil for 1500days (4 yrs)
kwa mwaka ni 5.4mil/4 yrs = 1.35 mil
kwa kipindi cha miaka minne imesafirisha abiria kwa wastan wa 1.35 mil kwa mwaka mmoja.. range ya deviation tuseme ni 0.3mil..
kwamba maximum inaweza kuwa imesafirisha 1.65 mil na minimum ni 1.05 mil kwa mwaka
na pia wanasema wana estimate watabeba 1.8 mil kwa mwaka huu wa sasa.
kwenye maneno yao 10, usichukue hata moja [emoji23]
nawasilisha!!!
In order to increase carrying capacity for each slot and to relief pressure from Mombasa port, from 1 July 2021 onwards the SGR began operating 75-car 150 TEU extra long freight trains. Each extra long train has 1.4 times the carrying capacity of normal trains.为提高单列运输能力,满足肯尼亚铁路局业主疏解蒙巴萨港口集装箱运输需求,减缓公司运输压力,7月1日起,运营公司从赖茨港站向内罗毕终点站单向组织开行集装箱运输“新产品”—“超长列车”(编组75辆,计长不超96.0,总重不超4000吨),“超长列车”平均一列运送150TEU,是普通货物列车单列运输能力的1.4倍。
In order to minimize the impact on passenger service and satisfy the non-stop requirement of the extra long trains, these trains are dispatched daily from Port Retiz Station at 3:30 am and arrives at Nairobi ICD at 12:30 pm. Up to the date of this writing, thirteen sets of extra long freight trains have already operated safely since 1 July.尽量避开白天客车开行主要时段,减小对客车运行影响,同时为满足“超长列车”中途不停车的运行需求,调整客车N2次在辛巴站停车会让“超长列车”。运输部门一是始发车站赖茨港站使用2条到发线,将2组重车车列在始发前组合成1列“超长列车”;二是终到车站内罗毕终点站选定车站最长到发线5道为“超长列车”固定接车线,列车终到后,利用调车机车分2次将“超长列车”分别送入ICD场2条股道完成卸车工作。
......
在公司运输各部门的通力协作下,从7月1日起“超长列车”每天3:30分从赖茨港站始发,沿途各站一路绿灯通行,12:30分终到内罗毕终点站,全程运行9小时,目前每天组织开行1列。这是蒙内铁路开通运营以来真正意义上组织开行的长编组、大重量的运输产品,意义深远。截至7月13日,赖茨港至内罗毕终点站已经成功安全开行了13列集装箱“超长列车”。...
Click to expand...
1.) Hamna DC powerline.Wanaumia kusikia hakuna infrastructure ipo Kenya then haipo Tz ila kuna infrastructures kibao Tz lkn Kenya hamna [emoji1787][emoji1787][emoji1787][emoji1787][emoji1787]
waaaaah🇰🇪🔥🔥Ni ndefu kwelikweli150 TEU Extra Long Freight Trains
视频 <= Video
In order to increase carrying capacity for each slot and to relief pressure from Mombasa port, from 1 July 2021 onwards the SGR began operating 75-car 150 TEU extra long freight trains. Each extra long train has 1.4 times the carrying capacity of normal trains.
In order to minimize the impact on passenger service and satisfy the non-stop requirement of the extra long trains, these trains are dispatched daily from Port Retiz Station at 3:30 am and arrives at Nairobi ICD at 12:30 pm. Up to the date of this writing, thirteen sets of extra long freight trains have already operated safely since 1 July.
source