Kampala Mayor Uncovers Substandard Culverts on Road Project

Eronda

JF-Expert Member
Joined
Dec 16, 2025
Posts
992
Reaction score
540
Civil engineer Eng. Ronald Balimwezo revealed that an inspection of a road project found the Chinese contractor had installed culverts smaller than those required under the project's original drainage design.

Your browser is not able to display this video.
 
Cookies are required to use this site. You must accept them to continue using the site. Learn more…