Una matatizo ya kuelewa Kiingereza?
Hiki ni nini, haya ni maoni ya Mhariri?
according to Canadian consultancy firm, Canarail The Dar es Salaam- Isaka-Kigali/Keza-Gitega-Musongoti railway project, which is set to cost US$5.2bn and will take four years to complete, is expected to lower Rwanda and Burundi's transport costs.
"It will be to up the governments to solicit funds for the construction to commence," said Donald Gillstrom, senior vice president and chief engineer at Canarail, during the presentation of a feasibility study.
Au ulitaka "presentation" nzima ya "feasibility study" iwekwe?
Soma hapa uelewe Canarail wamefanya nini: Tanzania 09-064 - Canarail
CANARAIL is responsible for the following activities:
- See more at: Tanzania 09-064 - Canarail
- Review of existing technical reports completed by BNSF and CPCS;
- Develop technical specifications for various gauge alternatives for the upgrade of an existing railway and construction of two new railways;
- Review and refine DBI design of two new railways (to Rwanda and Burundi) to minimize earthworks volumes;
- Develop Capital cost estimate (CAPEX) and operating cost estimate (OPEX);
- Environmental and Social Impact Analysis;
- Economic and financial analyses for both freight and passenger traffic on existing line (Tanzania) and future lines (Rwanda and Burundi);
- Institutional analysis.
CANARAIL is responsible for the following activities:
- See more at: Tanzania 09-064 - Canarail
- Review of existing technical reports completed by BNSF and CPCS;
- Develop technical specifications for various gauge alternatives for the upgrade of an existing railway and construction of two new railways;
- Review and refine DBI design of two new railways (to Rwanda and Burundi) to minimize earthworks volumes;
- Develop Capital cost estimate (CAPEX) and operating cost estimate (OPEX);
- Environmental and Social Impact Analysis;
- Economic and financial analyses for both freight and passenger traffic on existing line (Tanzania) and future lines (Rwanda and Burundi);
- Institutional analysis.
CANARAIL is responsible for the following activities:
- See more at: Tanzania 09-064 - Canarail
- Review of existing technical reports completed by BNSF and CPCS;
- Develop technical specifications for various gauge alternatives for the upgrade of an existing railway and construction of two new railways;
- Review and refine DBI design of two new railways (to Rwanda and Burundi) to minimize earthworks volumes;
- Develop Capital cost estimate (CAPEX) and operating cost estimate (OPEX);
- Environmental and Social Impact Analysis;
- Economic and financial analyses for both freight and passenger traffic on existing line (Tanzania) and future lines (Rwanda and Burundi);
- Institutional analysis.
Ahsante, inawezekana kizungu changu si kizuri hilo silikatai.
Halafu, tayari umeshautilia shaka na hata kuukosoa uelewa wangu wa lugha ya kiingereza, inakuwaje tena unaniletea link yenye contents za lugha hiyo hiyo nisiyoielewa :A S 39:!!
Nimejaribu kutafuta mkalimani, baada ya tafsiri yake naona swali langu linarudi palepale.
Labda niombe msaada kutoka kwako sasa, ni kipi kati ya yaliyo orodheshwa hapa chini ambalo limefanyika, maana kwa jinsi nilivyoelewa hizo ni activities na siyo OUTPUT wala OUTCOMES.
TANZANIA - Evaluation of different railway gauge alternatives (meter, cape and standard) for the upgrade of the Dar Es
Salaam – Isaka corridor in Tanzania and the engineering design and development of two new mainlines to
Kigali in Rwanda and Keza/Musongati in Burundi. (09-064)
- Management, over a two year period, of the TRC's main and running locomotive workshops.
- Development of a system for classifying the different rail lines comprising the TRC's network on the basis
when maintenance interventions are required and the tolerances to be achieved in doing the work.
- Incorporation of the preceding considerations into a revised Civil Engineering Manual for the Railway.
- Evaluation of overall demand, both current and potential, for telecommunications services along the
- TAZARA corridor in Tanzania and establishment of what infrastructure was required to meet this demand.
- Assistance to TRC trainers in planning, implementing, monitoring and assessing training in locomotive
- Development of an institutional and a business strategy for TRC to establish a property management unit
- Study of track manning levels for the TRC. This project evaluated maintenance needs for different track
performing the work. (92-035)
- Detailed design and tender documents for a new coach and wagon workshop for the TRC. (92-034)
- Development of a master plan to meet the telecommunications needs of the TRC over the next 10 to