Tanzania to build US$2bn hydropower plant with Brazilian technology


Invisible

Invisible

Admin
Joined
Feb 11, 2006
Messages
9,104
Likes
603
Points
280
Invisible

Invisible

Admin
Joined Feb 11, 2006
9,104 603 280
Tanzania is looking to build a US$2bn hydropower power plant. The 2100MW power plant will be located 200km of Dar es Salaam and will be constructed with Brazilian technology.

According to Aloyce Masanja, director-general of Tanzania’s state-run Rufiji Basin Development Authority, the plant once complete will be able to dispatch electricity at around US¢2/kWh and will help control flooding in the area as well as creating a 34bnm3 reservior to supply Dar es Salaam and other regions.

The current timetable calls for the feasibility study to be updated next year and for the first of three 700MW turbines to be installed in 2012. Full project completion is pencilled in for 2015.

The country has a power demand of around 900MW but currently produces less than 800MW. Demand is presently growing at around 10-15% a year and with only 14% of the population of 40m with grid access, there is every reason for this rate of growth to continue
 
M

MathewMssw

Member
Joined
Mar 27, 2009
Messages
92
Likes
0
Points
0
M

MathewMssw

Member
Joined Mar 27, 2009
92 0 0
Mimi nimewachoka hawa watawala! mgao wa umeme ndo mikakati ya kufuja mali ya umma inaanza, inamaana hakuna wataalamu wanaoweza kupanga mipango ya muda mrefu TZ?

It is a shame to the Government!!!!
 
Bigirita

Bigirita

JF-Expert Member
Joined
Feb 12, 2007
Messages
15,216
Likes
1,918
Points
280
Bigirita

Bigirita

JF-Expert Member
Joined Feb 12, 2007
15,216 1,918 280
mbona imekaa ki-uchaguzi wa 2015 zaidi!
lakini poa tu
 
Mtazamaji

Mtazamaji

JF-Expert Member
Joined
Feb 29, 2008
Messages
5,971
Likes
44
Points
0
Mtazamaji

Mtazamaji

JF-Expert Member
Joined Feb 29, 2008
5,971 44 0
Hydro Hydro Hydro alafu kwenye kiangazi itabidi tulete mvua kutoka thailand.

Tanzania should learn from past experince. With the world facing climate change Hydro power is not reliable.

I think Thermal generation inluding gas should be the way foward.

Anyway way sio mbaya
 
Idimi

Idimi

JF-Expert Member
Joined
Mar 18, 2007
Messages
11,391
Likes
3,141
Points
280
Idimi

Idimi

JF-Expert Member
Joined Mar 18, 2007
11,391 3,141 280
Hydro Hydro Hydro alafu kwenye kiangazi itabidi tulete mvua kutoka thailand.
Tanzania should learn from past experince. With the world facing climate change Hydro power is not reliable.

I think Thermal generation including gas should be the way forward.

Anyway way sio mbaya

Gesi na geothermal tunazo za kutosha sana, nashangaa hatutaki kufikiri nje ya boksi kwamba tunaweza kuwa na umeme wa kutosheleza mahitaji yetu na kuzalisha ziada bila kutumia nguvu ya maji. Kazi ipo.
 
Njowepo

Njowepo

JF-Expert Member
Joined
Feb 26, 2008
Messages
9,392
Likes
467
Points
180
Njowepo

Njowepo

JF-Expert Member
Joined Feb 26, 2008
9,392 467 180
Another richard monduli.
Yaani nimekosa amani na mikakati ya viongozi wa tz
 
babu M

babu M

JF-Expert Member
Joined
Mar 4, 2010
Messages
4,146
Likes
1,149
Points
280
babu M

babu M

JF-Expert Member
Joined Mar 4, 2010
4,146 1,149 280
By Fumbuka Ng'wanakilala

DAR ES SALAAM (Reuters) - Tanzania is planning with Brazil to build a power plant estimated to cost $2 billion that could transform east Africa's second largest economy into a net exporter of electricity, a senior official said on Wednesday.

Foreign Affairs Minister Bernard Membe and other officials held talks with their Brazilian counterparts in Sao Paolo in September on the construction of the proposed 2,100 megawatt (MW) Stiegler's Gorge hydro-power station.

"The power plant to be constructed using Brazilian technology would generate excess power that could be exported to the east African and southern African power pools," Aloyce Masanja, director general of Tanzania's state-run Rufiji Basin Development Authority, told Reutes.

Masanja said the plant would be a source of cheap, abundant energy at a cost of around 2 U..S cents per kilowatt hour. It would help control flooding in the Rufiji area and create a reservoir with a total capacity of 34 billion cubic metres to supply the commercial capital Dar es Salaam and other regions.

Tanzania's chronic energy shortages have resulted in rolling power outages, undermining economic growth in the country.

The government is considering funding options for the project, including concessional loans, private investment or state financing,
Brazil will provide the technology to build the plant, and a government delegation from Brazil is expected in Dar es Salaam next month for further discussions on the project.

"The project would involve the installation of three giant underground turbines, each with the capacity of producing 700 megawatts of electricity," Masanja said in an interview.

Masanja said energy companies from Canada, the United States and Russia had also expressed interest to invest in a power plant at Stiegler's Gorge, located some 200 km southwest of Tanzania's commercial capital, Dar es Salaam.

The proposed site of the power plant is located inside The Selous, Africa's largest game reserve. An environmental impact assessment showed the project would not affect the wildlife at the area, he said.

A detailed feasibility on the project funded by the Norwegian government was carried out in the early 1980s, but the project has been on the back-burner since then due to government bureaucracy and lack of funds.

"If we start implementing it immediately, the feasibility study can be updated in 2011 and we can start installing the first turbine in 2012. By 2015, the project should be fully completed and we can start enjoying 2,100 megawatts of electricity," said Masanja.

Tanzania has energy demand close to 900 MW capacity, but produces less than 800 MW.

Only 14 percent of its 40 million people are hooked to the grid, while demand grows by 10 to 15 percent annually.

The state-run Tanzania Electric Supply Company (TANESCO) has for the past 10 days been carrying out emergency power rationing countrywide following a drought and breakdowns at gas turbines that have eroded electricity supplies.
 
BongoTz

BongoTz

JF-Expert Member
Joined
Nov 3, 2006
Messages
272
Likes
2
Points
0
BongoTz

BongoTz

JF-Expert Member
Joined Nov 3, 2006
272 2 0
By Fumbuka Ng'wanakilala

DAR ES SALAAM (Reuters) - Tanzania is planning with Brazil to build a power plant estimated to cost $2 billion that could transform east Africa's second largest economy into a net exporter of electricity, a senior official said on Wednesday.

Foreign Affairs Minister Bernard Membe and other officials held talks with their Brazilian counterparts in Sao Paolo in September on the construction of the proposed 2,100 megawatt (MW) Stiegler's Gorge hydro-power station.

"The power plant to be constructed using Brazilian technology would generate excess power that could be exported to the east African and southern African power pools," Aloyce Masanja, director general of Tanzania's state-run Rufiji Basin Development Authority, told Reutes.

Masanja said the plant would be a source of cheap, abundant energy at a cost of around 2 U..S cents per kilowatt hour. It would help control flooding in the Rufiji area and create a reservoir with a total capacity of 34 billion cubic metres to supply the commercial capital Dar es Salaam and other regions.

Tanzania's chronic energy shortages have resulted in rolling power outages, undermining economic growth in the country.

The government is considering funding options for the project, including concessional loans, private investment or state financing,
Brazil will provide the technology to build the plant, and a government delegation from Brazil is expected in Dar es Salaam next month for further discussions on the project.

"The project would involve the installation of three giant underground turbines, each with the capacity of producing 700 megawatts of electricity," Masanja said in an interview.

Masanja said energy companies from Canada, the United States and Russia had also expressed interest to invest in a power plant at Stiegler's Gorge, located some 200 km southwest of Tanzania's commercial capital, Dar es Salaam.

The proposed site of the power plant is located inside The Selous, Africa's largest game reserve. An environmental impact assessment showed the project would not affect the wildlife at the area, he said.

A detailed feasibility on the project funded by the Norwegian government was carried out in the early 1980s, but the project has been on the back-burner since then due to government bureaucracy and lack of funds.

"If we start implementing it immediately, the feasibility study can be updated in 2011 and we can start installing the first turbine in 2012. By 2015, the project should be fully completed and we can start enjoying 2,100 megawatts of electricity," said Masanja.

Tanzania has energy demand close to 900 MW capacity, but produces less than 800 MW.

Only 14 percent of its 40 million people are hooked to the grid, while demand grows by 10 to 15 percent annually.

The state-run Tanzania Electric Supply Company (TANESCO) has for the past 10 days been carrying out emergency power rationing countrywide following a drought and breakdowns at gas turbines that have eroded electricity supplies.
This is some encouraging news!!! Please continue to sign the petition here: TATIZO LA UMEME: TUPATIENI 'STIEGLERS GORGE' Petition
 
J

Jasusi

JF-Expert Member
Joined
May 5, 2006
Messages
11,505
Likes
234
Points
160
J

Jasusi

JF-Expert Member
Joined May 5, 2006
11,505 234 160
We are so good at words. We are so lacking in implementation.
 
Nyambala

Nyambala

JF-Expert Member
Joined
Oct 10, 2007
Messages
4,470
Likes
30
Points
135
Nyambala

Nyambala

JF-Expert Member
Joined Oct 10, 2007
4,470 30 135
We are so good at words. We are so lacking in implementation.
Ndiyo maana haitajwi specifically lini mradi huo utaanza. Bongo bana. Hii nayo ni kama zile stori za mchuchuma - Liganga
 
Sikonge

Sikonge

JF-Expert Member
Joined
Jan 19, 2008
Messages
11,550
Likes
642
Points
280
Sikonge

Sikonge

JF-Expert Member
Joined Jan 19, 2008
11,550 642 280
NATO - No Action Talking Only.
 
kipipili

kipipili

JF-Expert Member
Joined
Jul 29, 2009
Messages
1,527
Likes
34
Points
145
kipipili

kipipili

JF-Expert Member
Joined Jul 29, 2009
1,527 34 145
sidhani kuna kitu hapa, no political will
 
YeshuaHaMelech

YeshuaHaMelech

JF-Expert Member
Joined
Oct 12, 2010
Messages
2,624
Likes
4
Points
0
YeshuaHaMelech

YeshuaHaMelech

JF-Expert Member
Joined Oct 12, 2010
2,624 4 0
Tutumie resources tulizo nazo kabla ya kukurupuka na mambo ya "Brazillian Techie thing".
Very shame watu wanamaliza university kwenda kugombania ajira badala ya kuumiza vichwa tupate umeme wa kutosha.
Brazillian Technologies.....very shame :redfaces:
 
M

mbongopopo

JF-Expert Member
Joined
Jan 24, 2008
Messages
1,111
Likes
10
Points
135
M

mbongopopo

JF-Expert Member
Joined Jan 24, 2008
1,111 10 135
Jamani tukumbushe hiyo 2015 ama itakamilika mwaka huo na kuwa waisemavyo sasa
 
M

Mapinduzi

JF-Expert Member
Joined
Aug 23, 2008
Messages
2,427
Likes
23
Points
0
M

Mapinduzi

JF-Expert Member
Joined Aug 23, 2008
2,427 23 0

Gesi na geothermal tunazo za kutosha sana, nashangaa hatutaki kufikiri nje ya boksi kwamba tunaweza kuwa na umeme wa kutosheleza mahitaji yetu na kuzalisha ziada bila kutumia nguvu ya maji. Kazi ipo.