Battle: Dar es Salaam vs Nairobi

for phase two 1.9b usd

1.4b loan+ 0.5b tanzania = 1.9b

phase one 1.2b finnaced by gvt of tanzania

hapo vipi imeingia vyemaπŸ’‰πŸ’‰πŸ’‰πŸ˜‚πŸ˜‚
Phase 1 is $1.2b from Turkey and $400m from Africa Development Bank
Phase Two is $1.46b from Standard Chatered Bank.
 
Phase one and two ni pesa ya fully pesa ya serikali. Waeza ona Rais akisema hayo mbele ya umma na Marais wastaaf wakati akifunga bunge.

Wakenya ni watu wajilas mno.
Anafahamu kabisa kuwa phase one serikali imejenga kwa pesa yake na phase two pia imejenga asilimia lakini wivu ndicho kinachomfanya aweke ubishi wa kijinga maana kule kwao serikali yao imewaaminisha kuwa haiwezi kujenga miradi mikubwa bila kukopa ndio maana reli yao imeishia machakani halafu wameshindwa kumalizia km chache zilizobaki eti hadi mkopo.
 
So far you are talking out of anger. Me what I wanted you to accept you have already done. That Tanzania`s SGR is done by loan and that`s final.
Nothing lk dat will happen whether you believe or not so far no loan just wait to phase 3 that will be ok to involve loan not now....
 
Phase 1 is $1.2b from Turkey and $400m from Africa Development Bank
Phase Two is $1.46b from Standard Chatered Bank.
leta ushahidi kua tanzania ime sign contract na turkey ya mkopo elewa swali kabla hujajibu πŸ˜‚πŸ˜‚πŸ˜‚πŸ˜‚
 
Ile thika mliyo kuwa mnaringia mlijenga kwa loan mbn husemi?....iyo lapset iko wap mpka sasa?...blablabla nothing...unajua pia tuko phase two brt?....bora ujengewe choo sabab unauwakik wa kula nyie mnao letew msada wa chakul vipi?
Let me tell you how Lapset has faired So far
1. Three berths at Lamu port completed.
2. Isiolo airport completed.
3. Road from Lamu Port to Ethiopia and South Sudan is currently under construction.
 
leta ushahidi kua tanzania ime sign contract na turkey ya mkopo elewa swali kabla hujajibu πŸ˜‚πŸ˜‚πŸ˜‚πŸ˜‚
Nakuambianga kila siku ujifunze kusoma na hutaki kuelewa. Ingekuwa umejua kusoma you could have seen what you asking in that article I gave you.
 
Yes. Nairobi has the highest building & skyline, economy, literacy, culture, infrastructure, airport, railway etc etc.. In East and Central Africa.
Ubongolalas wenyewe wanakuja kufanya kazi Nairobi kwa kishindo ili akirudi kwao awe na hela nyingi za madafu.
Kenyans go to Dubai, Europe, South Africa etc USA for higher paying jobs.
There's levels to this shit.

Your fellow arrogant slaves (Kenyans) are vividly discriminated against by systemic tribalism, how can foreign nationals, who have zero command of Queen's language, secure a decent job at the expense of the most dominant tribesmen?

When fabricating anything, you must keep some facts into consideration.
 
Let me tell you how Lapset has faired So far
1. Three berths at Lamu port completed.
2. Isiolo airport completed.
3. Road from Lamu Port to Ethiopia and South Sudan is currently under construction.
and its only bearth one completed ww usifanye watu wajinga sana πŸ˜‚πŸ˜‚πŸ˜‚πŸ˜‚
 
Nakuambianga kila siku ujifunze kusoma na hutaki kuelewa. Ingekuwa umejua kusoma you could have seen what you asking in that article I gave you.
leta ushahidi kua tanzania ime sign contarct na turkey over phase 1 loan ukipata mm nafunga acc jamii forum πŸ˜‚πŸ˜‚πŸ˜‚πŸ˜‚
 
Na ile loan tulichukua serikal inatak kuitumia kwa phase 3 siyo two
Mkataba wa makubaliano ya mkopo nafuu wa dola za Marekani bilioni 1.46, sawa na shilingi za Tanzania Tril. 3.3 ambazo Benki hiyo imetoa kwa ajili ya ujenzi wa Reli kwa Kiwango cha Kimataifa (SGR), kipande cha Morogogoro hadi Makutupora, mkoani Singida.
 
Let`s start with Africa Development Bank which gave your $400m loan to do your SGR phase one
Regional bank to help Tanzania fund SGR, gas plant - TradeMark East Africa

Regional bank to help Tanzania fund SGR, gas plant
Tanzania has secured more than $400 million from the Trade and Development Bank (TDB) to fund part of its standard gauge railway and a 318MW gas plant.
This will be the first time President John Magufuli’s administration has turned to a financier for a railway project, having said this year that his government has enough funds to finance the construction of the $2.5 billion line.
The development also comes barely three months after the country turned to the African Development Bank to finance two of its major infrastructure projects β€” the 2,100MW Stieglers Gorge hydroelectric plant and the modernisation of the Dodoma Airport.
On Tuesday, TDB President Admassu Tadesse said the bank, formerly known as Eastern and Southern African Trade and Development Bank, had allocated the funds to help Dar es Salaam push forward with its railway and energy infrastructure projects.
β€œSo far our bank has allocated $200 million for the SGR Central Corridor project and another $200 million that will go towards the gas power plant,” said Mr Admassu.
The regional development bank chief had a meeting with Tanzania’s Finance Minister Dr Philip Mpango and his energy counterpart Dr Melard Kalemani, which centred on the financing and implementation of the two projects.
β€œWe are ready and willing to support Tanzania in its execution of development projects in the country. As at March this year, we had implemented more than 10 projects worth $285 million in Tanzania’s banking, agriculture, manufacturing and infrastructure sectors,” said Mr Admassu.
Documents seen by The EastAfrican show that Dar es Salaam received $191.67 million as at December last year from the regional development bank for an array of projects, attracting an interest of $1.85 million.
By that time, the bank had offered more than $2.62 billion in project development lending to its member countries.
The Bujumbura headquartered TDB with a $4 billion asset base, also said that it has $160 million worth of projects approved for Tanzania, with a further $660 million having been allocated to Dar es Salaam to boost its trade, energy, agriculture and infrastructure sectors.
β€œWe are happy that TDB has offered us these soft loans to support our development projects. We will ensure that we complete negotiations by the end of September so that the funds can be released,” said Dr Mpango.
According to funding documents seen by The EastAfrican, Tanzania will start receiving the funds next year, with $27.55 million over a five year period rising to $60.27 million the following year, $80.28 million in 2021, $88.77 million the year after, $97.26 in 2023 and a final disbursement of $110.88 million in 2024.
The financing documents show that the French Development Agency is also expected to offer $100 million for this project, while the European Commission will offer $30 million, of which $10 million will be a grant.
Tanzania has been seeking funds to modernise its transport and energy projects as it seeks to meet its industrialisation vision in the next seven years.
Early this year, Dar es Salaam said it had set aside more than $610 million in the 2018/19 budget for the construction of the 300km SGR between Dar es Salaam and Morogoro; and the 336km Morogoro and Makutopora line.
This would have been significantly higher than the $392.23 million set aside in the current financial year. However in the budget presented last month, Dar es Salaam failed to allocate funds for the SGR project.


Here standard chartered Bank and Turkey Exim Bank giving you loans of $1.46b and $1.2b respectively

Tanzania secures $1.46b SGR loan from Stanchart


SATURDAY SEPTEMBER 15 2018




President John Magufuli inspects construction works of the SGR project in Dar es Salaam. PHOTO | NMG

President John Magufuli inspects construction works of the SGR project in Dar es Salaam. PHOTO | NMG
In Summary
  • Funds will enable Tanzania to build the 430km line between Morogoro and Makutupora.
  • Already, the government has allocated $700 million for its SGR projects in the 2018/2019 annual budget.
  • Last year, President John Magufuli launched a 300km line between Dar es Salaam and Morogoro, which is being funded by the Turkey Exim Bank to the tune of $1.2 billion.
ADVERTISEMENT


ALLAN OLINGO
By ALLAN OLINGO
More by this Author
Tanzania has secured a $1.46 billion concessional loan from the Standard Chartered Bank's Group to fund its standard gauge railway line between Morogoro and Dodoma.
Finance Minister Dr Philip Mpango said the new loan was part of an agreement reached with Standard Chartered Bank Group executive director Bill Winters in Dar es Salaam, which would go to fund the 430km line between Morogoro and Makutupora.
Already, the government has allocated $700 million for its SGR projects in the 2018/2019 annual budget.
β€œWe are still seeking more funds from other partners to fund the remaining sections that will see us extend the line to the Rwandan border,” Dr Mpango said.
The Stanchart loan means that the government has secured more than 75 per cent funding for the $1.9 billion project, which it awarded a joint venture of Portuguese and Turkish firms, Yapi Merkezi and Mota Engil.
It is also understood that it will be issuing a last contract for the third phase of the project this year, and other two contracts to be announced in the first quarter of 2019.

Tanzania secures US $1.46bn loan for SGR.

Source allan olingo from ntv πŸ€£πŸ€£πŸ˜‚πŸ˜‚πŸ˜‚
 
kenya tuko na uwezo wa kujenga meli....watu wa tanzania yafaa mshukuru wa kenya tumewajengea meli kadha na tag boats za bandari lenu la port.mabasi ya brt pia muliagiza uku kenya..kubalini kenya is more advanced..https://www.secoafrica.com/hapa-kazi-tu-01/.....angalieni hio video hope meli yenu mulishaipokea.. kutoka mombasa
Hebu tuoneshe hilo basi la BRT mlilounda, mtumbwi mliojenga huu hapa unaitwa hapa kazi tu 02 upo kwenye banda la maonyesho ya sabasaba
tapatalk_1586382469453.jpeg
 
Let me tell you how Lapset has faired So far
1. Three berths at Lamu port completed.
2. Isiolo airport completed.
3. Road from Lamu Port to Ethiopia and South Sudan is currently under construction.
Kwani ni mm tu ndio niliskia lamu is a next white elephant...hahaaahaaa...acha porojo bhna mbona viko wazi hivyo...viproject uchwara vimeishia machakan km ile esigiara
 
That`s the bitter truth my friend. Your SGR and Stiglerdam are both under loans.
Umeona loan ya standard charted..imekuwa signed onyesha wapi wizara ya fedha ya Tz imesign mkataba wa loan..loan zote tz inazochukua lazima Dotto james au mpango wawepo na zinakuwa aired.....hizo rumors zenu za turkey wametupa loan tuoneshe hapa picha sio gazeti la East africa linalookota habari ...
 
Back
Top Bottom