Tanzania to build US$2bn hydropower plant with Brazilian technology

Discussion in 'Biashara, Uchumi na Ujasiriamali' started by Invisible, Dec 2, 2010.

  1. Invisible

    Invisible Admin Staff Member

    #1
    Dec 2, 2010
    Joined: Feb 11, 2006
    Messages: 9,095
    Likes Received: 140
    Trophy Points: 160
    Tanzania is looking to build a US$2bn hydropower power plant. The 2100MW power plant will be located 200km of Dar es Salaam and will be constructed with Brazilian technology.

    According to Aloyce Masanja, director-general of Tanzania’s state-run Rufiji Basin Development Authority, the plant once complete will be able to dispatch electricity at around US¢2/kWh and will help control flooding in the area as well as creating a 34bnm3 reservior to supply Dar es Salaam and other regions.

    The current timetable calls for the feasibility study to be updated next year and for the first of three 700MW turbines to be installed in 2012. Full project completion is pencilled in for 2015.

    The country has a power demand of around 900MW but currently produces less than 800MW. Demand is presently growing at around 10-15% a year and with only 14% of the population of 40m with grid access, there is every reason for this rate of growth to continue
     
  2. M

    MathewMssw Member

    #2
    Dec 2, 2010
    Joined: Mar 27, 2009
    Messages: 92
    Likes Received: 0
    Trophy Points: 0
    Mimi nimewachoka hawa watawala! mgao wa umeme ndo mikakati ya kufuja mali ya umma inaanza, inamaana hakuna wataalamu wanaoweza kupanga mipango ya muda mrefu TZ?

    It is a shame to the Government!!!!
     
  3. Bigirita

    Bigirita JF-Expert Member

    #3
    Dec 2, 2010
    Joined: Feb 12, 2007
    Messages: 13,579
    Likes Received: 330
    Trophy Points: 180
    mbona imekaa ki-uchaguzi wa 2015 zaidi!
    lakini poa tu
     
  4. Mtazamaji

    Mtazamaji JF-Expert Member

    #4
    Dec 2, 2010
    Joined: Feb 29, 2008
    Messages: 5,972
    Likes Received: 27
    Trophy Points: 0
    Hydro Hydro Hydro alafu kwenye kiangazi itabidi tulete mvua kutoka thailand.

    Tanzania should learn from past experince. With the world facing climate change Hydro power is not reliable.

    I think Thermal generation inluding gas should be the way foward.

    Anyway way sio mbaya
     
  5. Idimi

    Idimi JF-Expert Member

    #5
    Dec 2, 2010
    Joined: Mar 18, 2007
    Messages: 8,596
    Likes Received: 806
    Trophy Points: 280

    Gesi na geothermal tunazo za kutosha sana, nashangaa hatutaki kufikiri nje ya boksi kwamba tunaweza kuwa na umeme wa kutosheleza mahitaji yetu na kuzalisha ziada bila kutumia nguvu ya maji. Kazi ipo.
     
  6. Njowepo

    Njowepo JF-Expert Member

    #6
    Dec 2, 2010
    Joined: Feb 26, 2008
    Messages: 9,160
    Likes Received: 289
    Trophy Points: 180
    Another richard monduli.
    Yaani nimekosa amani na mikakati ya viongozi wa tz
     
  7. babu M

    babu M JF-Expert Member

    #7
    Dec 3, 2010
    Joined: Mar 4, 2010
    Messages: 3,057
    Likes Received: 361
    Trophy Points: 180
    By Fumbuka Ng'wanakilala

    DAR ES SALAAM (Reuters) - Tanzania is planning with Brazil to build a power plant estimated to cost $2 billion that could transform east Africa's second largest economy into a net exporter of electricity, a senior official said on Wednesday.

    Foreign Affairs Minister Bernard Membe and other officials held talks with their Brazilian counterparts in Sao Paolo in September on the construction of the proposed 2,100 megawatt (MW) Stiegler's Gorge hydro-power station.

    "The power plant to be constructed using Brazilian technology would generate excess power that could be exported to the east African and southern African power pools," Aloyce Masanja, director general of Tanzania's state-run Rufiji Basin Development Authority, told Reutes.

    Masanja said the plant would be a source of cheap, abundant energy at a cost of around 2 U..S cents per kilowatt hour. It would help control flooding in the Rufiji area and create a reservoir with a total capacity of 34 billion cubic metres to supply the commercial capital Dar es Salaam and other regions.

    Tanzania's chronic energy shortages have resulted in rolling power outages, undermining economic growth in the country.

    The government is considering funding options for the project, including concessional loans, private investment or state financing,
    Brazil will provide the technology to build the plant, and a government delegation from Brazil is expected in Dar es Salaam next month for further discussions on the project.

    "The project would involve the installation of three giant underground turbines, each with the capacity of producing 700 megawatts of electricity," Masanja said in an interview.

    Masanja said energy companies from Canada, the United States and Russia had also expressed interest to invest in a power plant at Stiegler's Gorge, located some 200 km southwest of Tanzania's commercial capital, Dar es Salaam.

    The proposed site of the power plant is located inside The Selous, Africa's largest game reserve. An environmental impact assessment showed the project would not affect the wildlife at the area, he said.

    A detailed feasibility on the project funded by the Norwegian government was carried out in the early 1980s, but the project has been on the back-burner since then due to government bureaucracy and lack of funds.

    "If we start implementing it immediately, the feasibility study can be updated in 2011 and we can start installing the first turbine in 2012. By 2015, the project should be fully completed and we can start enjoying 2,100 megawatts of electricity," said Masanja.

    Tanzania has energy demand close to 900 MW capacity, but produces less than 800 MW.

    Only 14 percent of its 40 million people are hooked to the grid, while demand grows by 10 to 15 percent annually.

    The state-run Tanzania Electric Supply Company (TANESCO) has for the past 10 days been carrying out emergency power rationing countrywide following a drought and breakdowns at gas turbines that have eroded electricity supplies.
     
  8. BongoTz

    BongoTz JF-Expert Member

    #8
    Dec 3, 2010
    Joined: Nov 3, 2006
    Messages: 272
    Likes Received: 1
    Trophy Points: 0
    This is some encouraging news!!! Please continue to sign the petition here: TATIZO LA UMEME: TUPATIENI 'STIEGLERS GORGE' Petition
     
  9. J

    Jasusi JF-Expert Member

    #9
    Dec 3, 2010
    Joined: May 5, 2006
    Messages: 11,450
    Likes Received: 99
    Trophy Points: 145
    We are so good at words. We are so lacking in implementation.
     
  10. Nyambala

    Nyambala JF-Expert Member

    #10
    Dec 3, 2010
    Joined: Oct 10, 2007
    Messages: 4,468
    Likes Received: 10
    Trophy Points: 135
    Ndiyo maana haitajwi specifically lini mradi huo utaanza. Bongo bana. Hii nayo ni kama zile stori za mchuchuma - Liganga
     
  11. Sikonge

    Sikonge JF-Expert Member

    #11
    Dec 3, 2010
    Joined: Jan 19, 2008
    Messages: 11,397
    Likes Received: 186
    Trophy Points: 160
    NATO - No Action Talking Only.
     
  12. kipipili

    kipipili JF-Expert Member

    #12
    Dec 3, 2010
    Joined: Jul 29, 2009
    Messages: 1,486
    Likes Received: 22
    Trophy Points: 135
    sidhani kuna kitu hapa, no political will
     
  13. BongoTz

    BongoTz JF-Expert Member

    #13
    Dec 3, 2010
    Joined: Nov 3, 2006
    Messages: 272
    Likes Received: 1
    Trophy Points: 0
  14. YeshuaHaMelech

    YeshuaHaMelech JF-Expert Member

    #14
    Dec 3, 2010
    Joined: Oct 12, 2010
    Messages: 2,624
    Likes Received: 2
    Trophy Points: 0
    Tutumie resources tulizo nazo kabla ya kukurupuka na mambo ya "Brazillian Techie thing".
    Very shame watu wanamaliza university kwenda kugombania ajira badala ya kuumiza vichwa tupate umeme wa kutosha.
    Brazillian Technologies.....very shame :redfaces:
     
  15. m

    mbongopopo JF-Expert Member

    #15
    Dec 3, 2010
    Joined: Jan 24, 2008
    Messages: 1,113
    Likes Received: 6
    Trophy Points: 135
    Jamani tukumbushe hiyo 2015 ama itakamilika mwaka huo na kuwa waisemavyo sasa
     
  16. M

    Mapinduzi JF-Expert Member

    #16
    Dec 3, 2010
    Joined: Aug 23, 2008
    Messages: 2,427
    Likes Received: 8
    Trophy Points: 0
    Wapi kuna geothermal za kutosha kupata umeme hapa Tz?
     