Are the Chinese planning gas-fired station a project for a 300mw power plant.

nngu007

JF-Expert Member
Aug 2, 2010
15,862
5,797
Since last month, the China Machinery & Equipment Company (CMEC) has been carrying out a study on a project for a 300 MW power plant that would be supplied by gas from the Mnazi Bay field operated by France's Maurel & Prom that boasts 3 TCF of reserves. CMEC has teamed up on the project with the Tanzania Electricity Supply Co (Tanesco). Up to now Mnazi Bay has supplied only a small, 16 MW power station, which means the bulk of its reserves remain untapped. CMEC's project would call for the supply of 27 billion cu.ft per year. The plant would be situated in the port of Mtwara. BG and Ophir also want to build a liquefaction plant in that port
 