Are the Chinese planning gas-fired station a project for a 300mw power plant.

Discussion in 'Jukwaa la Siasa' started by nngu007, Mar 19, 2011.

  1. nngu007

    nngu007 JF-Expert Member

    Mar 19, 2011
    Joined: Aug 2, 2010
    Messages: 15,874
    Likes Received: 25
    Trophy Points: 145
    Since last month, the China Machinery & Equipment Company (CMEC) has been carrying out a study on a project for a 300 MW power plant that would be supplied by gas from the Mnazi Bay field operated by France's Maurel & Prom that boasts 3 TCF of reserves. CMEC has teamed up on the project with the Tanzania Electricity Supply Co (Tanesco). Up to now Mnazi Bay has supplied only a small, 16 MW power station, which means the bulk of its reserves remain untapped. CMEC's project would call for the supply of 27 billion cu.ft per year. The plant would be situated in the port of Mtwara. BG and Ophir also want to build a liquefaction plant in that port
  2. k

    kayumba JF-Expert Member

    Mar 19, 2011
    Joined: Oct 28, 2010
    Messages: 655
    Likes Received: 5
    Trophy Points: 35
    That is good new if it will result to end of load shedding!